HomeMy WebLinkAboutSDP201300061 Review Comments 2014-03-14 (W A
ENGINEERS
SURVEYORS
PLANNERS
ASSOCIATES
March 14, 2014
Sarah Baldwin, Senior Planner
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Re: SDP 2013-061 Stonefield Blocks F & G—Final Site Plan—2nd Review
WWA Project No. 213042.04
Dear Ms. Baldwin:
This letter is to document and respond to your comments dated March 7, 2014. Our
responses are as follows:
Planning
1. Comment: [General] (Comment from January 6, 2014: Landscaping appears to be
on top of sanitary/sewer lines in many locations on both C-31 & 32. Please revise or
confirm that they can be planted in these locations. Also confirm that all lighting is
out of the lines.) Landscaping/trees still appear to be over sanitary/sewer lines in
several areas on C-33 & 34. If you want to meet to further discuss, let me know.
Also the lighting comment above was not addressed.
Response: Landscaping has been shifted off of pipes.
VDOT, Troy Austin
1. Comment: The street names are not consistent throughout the plans.
Response: The street names have been updated.
2. Comment: The construction entrance as shown on the submitted plans will not
work. Through conversations with the design engineer, it is agreed that a
construction entrance off of District Avenue (Lenox Avenue) on the internal parcels
will be the appropriate location. The attached plan sheet shows the location as
discussed with the design engineer.
Response: The construction entrance has been moved on Drawing Number C-29.
3040 Avemore Square Place • Charlottesville,VA 22911
Telephone(434) 984-2700 • Fax(434) 978-1444
Charlottesville •Lynchburg
Engineering,Michelle Roberge
A. Site Development Plan (SDP201300041)
1. Comment: Please show pavement marking near the NE corner of building to show
transition to travelway where one island is not in alignment.
The applicant has also acknowledged that all easements will be shown on a plat and
will be submitted later. All easements will be reviewed at that time.
Response: Pavement markings have been added.
B. Road Plan (SUB201300163)
1. Comment: Please show the access easement measurement form back of curb to
back of curb.
Response: The access easement dimension has been adjusted.
2. Comment: Please show the solid white line around the median where there is
channelized flow to Lenox Avenue.
Response: The striping has been modified.
3. Comment: This road plan shall be approved by ACSA, VDOT, Planning and Fire
Rescue.
Response: Acknowledged.
Fire and Rescue,Andrew Slack
1. Comment: On page C-7, the old road names are still shown. Please change the road
names to match the correct road names of "Stoneridge Avenue" and "Lenox
Avenue" on all pages of the plan before final approval is given.
Response: The street names have been updated.
3040 Avemore Square Place • Charlottesville,VA 22911
Telephone(434) 984-2700 • Fax(434) 978-1444
Charlottesville •Lynchburg
Page 2 of 3
Neer ',owe
We trust that the above responses and revised plans properly address the outstanding
items. If you have any questions,please contact me.
Sincerely,
WW Associates, Inc.
4
Robert C. Umberger
Project Manager
3040 Avemore Square Place •Charlottesville,VA 22911
Telephone(434) 984-2700 •Fax(434) 978-1444
Charlottesville •Lynchburg
Page 3 of 3
arg
ov
®ziY
4. t
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road,Room 227
Charlottesville,Virginia 22902-4596
Phone(434)296-5832 Fax(434)972-4126
Project: Stonefield Blocks F&G
Plan preparer: WW Associates,Inc
Owner or rep.: Albemarle Place EAAP LLC
Plan received date: 8 Nov 2012
Date of comments: 16 Dec 2013
Reviewer: Michelle Roberge
A. Site Development Plan (SDP201300061)
1. Please measure parking stall from face of curb to end of parking stall to avoid any confusion. For
example some are labeled 9'x18' and some are 9'x16' (from edge of gutter to end of stall).
✓2. On sheet C-8 shift both stop signs 4' from the edge of intersecting travelway. These stop signs are
located at exits of parking areas.
✓3. There is a crosswalk across Inglewood Drive.A CG-12 will be needed to tie into crosswalk. I will
defer to planning to decide who is required to build that CG-12.Please discuss with planning.
har/ rZ ''..;,,,,a 4 k:;,,, (/(sts.,,d,
4. Will there be a future sidewalk on the other side of District Ave?If a crosswalk across Blackbird
Lane is necessary,this may impact the pavement marking at intersection.A 4' gap is standard
between a crosswalk and white bar shown. '/./t y,,,&{{';a ps z 014- y/pry, 4/so ��*
-i(t - i•gJ}' /-a c- �2L ' q/iy ef?/ A ---fv/C/ Lf�^P�0/1,-6!L--ceej•
5. Sidewalks are typically shown on both sides of street. Is there a waiver to show sidewalk on one
side of the street for Blackbird Lane and Swanson)Jrive Extended?Please clarify.
6. For Blackbird Lane, Swanson Drive Extended and 4th St,all entrances from travelway shall show a
25' radius at a minimum. See VDOT standard on page F-103.The link is shown below.
http://www.extranet.vdot.state.va.us/locdes/Electronic Pubs/2005%2ORDM/AppendF.pdf
7. Show a solid yellow line around median in NE corner of fuel area.
rf
8. What are circular items on fuel area near island?Are they bollards?
✓9. Please provide a circulation path for heaviest vehicle(ie. fuel trucks and 18 wheelers to bldg F-1)
to ensure radius of medians are adequate.
v 10. On sheet C-10,the entrance to Block G from 4th St has not been approved by the County Engineer.
The additional traffic study has not been presented nor has it been approved by the County
Engineer. Please show the median with no breaks.
11. It appears some comments from the ZMA have not been addressed and should be addressed during
the site plan phase.Please address the following:
Engineering Review Comments
Page 2 of 3
`tea) The intersection of Swanson Drive Extended and 4th St. is almost addressed.The median on
4th St needs to be widened to about 4' and revised to a raised median for its entire length. The
pavement striping will not work.This raised median will be a pedestrian refuge if future
sidewalks are necessary. a n---!%u zde�a�
✓b) Please provide a minimum radius of 3' for the median allowing channelized flow from
Swanson Drive Extended.
Vc) There is still an abrupt taper passed the intersection of Swanson Drive Extended and 4th St.
This area is almost addressed. Please use VDOT taper standard 8:1.
http://www.extranet.vdot.state.va.us/locdes/Electronic_Pubs/2005%20RDM/AppendF.pdf
V��d) Extend island around fuel area to 4th St.
/j ✓,e} )On the SE corner of Bldg F-1,the pavement tapers off again.Please use VDOT taper standard
8:1.A smoother transition shall be shown for future connection to work.Also,maintain the
30' travelway around bldg corner.
'✓f) On NE side of bldg there are concrete slabs. The travelway needs to be clearly conveyed along
this area. I recommend providing pavement marking for travelway.
✓j The applicant has agreed to reserve a possible parking entrance at the intersection of Blackbird
Lane and District Ave.Please place a note on plan noting the entrance will be opened if left
turn lane queuing length to proposed F-1 Bldg entrance is deemed inadequate by the County
Engineer. I recommend including an inset within sheet showing this entrance.Also,please
show easement for this entrance on plan. od r�`,? �r' �;, 1!<�,,�:
pr:
,%12. Please show and label all the future connections on plan. Include the connector road to
Commonwealth since it has been proffered.
v'713. Please show easements on plan for private road.This will need to be recorded on a plat.Also note,
that stub outs for future connections shall be shown with easements. The easement should be wide
enough for required grading to build future connection. ,:; , ; '11 !:r
X14. Please revise dimension for entrance near the vortechs.It appears greater than 24'.
15. The parking stall near the vortechs area needs to be 9'x18'. Please revise stall and revise
dimensions for the 9'x17.5' and 9'x 18.5'.
16. Please clarify why additional parking is proposed near the vortechs area. It appears this will be for
future retail building within Block G. r- 7 - ' ty
/17. The entrance from Blackbird Lane to Block F(near Inglewood Drive)is about 8%.Maximum
entrance slope is 4%.Please revise.
18. Please provide 1' contours on site due to topography of site. Also,clearly label high points on site.
7%4' fr u it's:°t ed,
✓ 19. Provide detail for 225.1.There should be a depression to filterra inlet for maximum capture.
Otherwise,runoff will just spill over to structure 225.
Engineering Review Comments
Page 3 of 3
✓20. Provide another filterra east of structure 226 to treat eastern side of that parking area.Also,
provide at a minimum.5%grade for parking along bldg's NW wall for positive grade to additional
filterra mentioned.
21. As a general cpmment,please show a minimum.5%grade on site.
22. All street name signs shall be located on the left side of road per Albemarle County Design
Standards. /// ��// w ,,, J::�,�� �„ ,
\,43. East of the loading dock wall are 478 contours.This area appears to be a ponding area.Please
address grading to divert runoff to an inlet. ))__
24. It appears there is more capture to DI structure 222 than filterra structure 222.1. Please revise
layout for more treatment.
- 25. Provide an island for parking located west of loading dock entrance.
+26. Some areas for proposed retaining walls are near the property line.For example in the NW corner,
c
—1,40\P._ the retaining walls are about 12' high.It appears that land disturbance will be over the property
line to recommend obtaining grading easement y owner.
It PP ea thereis another etinng wall rig h at he P rp a ty l n on the western property
boundary line. Please clarify for all retaining walls near property line.
127. There are two areas on Sheet C-11 and C-12 that shows the sidewalk tapering from 6' to 5'.I do
not see the need to taper as majority of sidewalk is 6'.
Plearevise.
/E(!/fl 2Ve•of **`Cs ot,u i
44/
28. Please revise the spot elevations for the entrance to bldg F-1 from Blackbird Lane. The topo is not
clear if it is a positive slope or negative slope. It appears the island towards the underground pipes„J
can be lowered so runoff can be conveyed to parking lot inlet instead of Blackbird Lane.
77D 1 owleA. a ' ( WI_ r - fir?/y' ,<. fez'✓6`"�.
29. On southern end of parking lot,th6te is a sp It elevation 72.01 (TC)that will act as a low spot.
Please revise so runoff can drain to structure 206.1.
30. For crosswalk across Swanson Drive Extended and continues to Bldg F-1,I recommend shifting
about 3' north to be in alignment with sidewalk running east.This will also allow pavement
marking near crosswalk to shift closer to intersection.
31. Please provide 20' easements for all SWM facilities and stormsewer pipes.
✓1/i// X22 Sh,own or /Pict I
Sincerely,
Michelle Roberge
wdIA
,,,a
ENGINEERS
SURVEYORS
PLANNERS
ASSOCIATES
February 6, 2014
Sarah Baldwin, Senior Planner
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Re: SDP 2013-061 Stonefield Blocks F & G—Final Site Plan
WWA Project No. 213042.04
Dear Ms. Baldwin:
This letter is to document and respond to your comments dated January 6, 2014. Our
responses are as follows:
Planning
1. Comment: [General] The rezoning, proffers and code of development should reflect
the recently approved ZMA number.
Response: The latest approved ZMA number and proffers has been added to the plan.
2. Comment: [General] Please confirm the square footage of Building F as it has been
reflected differently on other submittals.
Response: The most current square footage is represented on the cover sheet.
3. Comment: [General]
4. Comment: [4.12.1 6c 1] Perpendicular parking must be 9' x 18' or 10' x 18', some
spaces appear to be 9' x 16'.
Response: The spaces have been dimensioned correctly
5. Comment: [General] Retaining walls adjacent to residential areas appear to be on or
over the property lines. How will these be constructed without getting onto adjacent
property? See engineering comments.
Response: The wall on the property line has been moved away from the property line.
3040 Avemore Square Place • Charlottesville,VA 22911
Telephone (434) 984-2700 •Fax,(434) 978-1444 y
Charlottesville •Lynchburg
Sarah Baldwin, Senior Plattner
County of Albemarle
January 31, 2014
6. Comment: [General] Landscaping appears to be on top of sanitary/sewer lines in
many locations on both C-31 & 32. Please revise or confirm that they can be planted
in these locations. Also confirm that all lighting is out of the lines.
Response: The trees have been moved out of the sanitary sewer easement
VDOT, Troy Austin
1. Comment: The dimensions of the left turn lane and taper off of 4th Street should be
shown on the site plan. In addition, left turn lane warrants should be provided.
Response: The left turn lane off of 4th street has been removed.
2. Comment: I have concerns that the let turn queue off of 4th Street may create a
problem with the intersection of 4th Street and Rte. 29 due to volume of traffic
travelling east on 4th Street towards Rte. 29. If it cannot be demonstrated that this
left turn movement will function without adverse impact to the Rte. 29 intersection,
the proposed entrance should either be removed or made right-in/right-out by
extending the median.
Response: The entrance has been changed to a right-in/right-out.
3. Comment: Is the intention to close the 4th Street connection to Rte. 29 at any point
during construction? If so, the timing and operation of the traffic signal at the
intersection needs to be considered and evaluated.
Response: No.
4. Comment: The construction entrance shown on 4th Street should be removed due to
safety concerns. The construction entrance off of District Avenue should be
adequate for this project.
Response: The construction entrance shown on 4th street is off of an existing signal
controlled full movement intersection at route 29. Closing this construction entrance
would force southbound traffic to go through the intersection of route 29 and Hydraulic
Road creating unnecessary additional large truck traffic on Hydraulic Road and in the
intersection.
3040 Avemore Square Place • Charlottesville,VA 22911
Telephone(434) 984-2700 • Fax(434) 978-1444
Charlottesville •Lynchburg
Paged of 9
Sarah Baldwin, Senior PldIrrer ..f
County of Albemarle
January 31, 2014
In addition, this movement would take ALL construction traffic through the heart of the
town center, introducing a completely undesirable mix of construction vehicles with
pedestrians.
We respectfully request that both construction entrances remain so that the construction
traffic can enter through either entrance depending on where the traffic originated. The
entrance is off of an existing road and not directly of route 29.
Engineering, Michelle Roberge
A. Site Development Plan (SDP201300061)
1. Comment: Please measure parking stall from face of curb to end of parking stall to
avoid any confusion. For example some are labeled 9' x 18' and some are 9' x 16'
(from edge of gutter to end of stall).
Response: The dimensions have been adjusted.
2. Comment: On sheet C-8 shift both stop signs 4' from the edge of intersecting
travelway. These stop signs are located at exits of parking areas.
Response: The stop signs have been shifted.
3. Comment: There is a crosswalk across Inglewood Drive. A CG-12 will be needed
to tie into crosswalk. I will defer to planning to decide who is required to build that
CG-12. Please discuss with planning.
Response: The handicapped ramp is existing and has been added to the plan.
4. Comment: Will there be a future sidewalk on the other side of District Ave? If a
crosswalk across Blackbird Lane is necessary, this may impact the pavement
marking at intersection. A 4' gap is standard between a crosswalk and white bar
shown.
Response: This site plan will not have a sidewalk adjacent to the Northrop Grumman
property line and buffer.
3040 Avemore Square Place • Charlottesville,VA 22911
Telephone (434) 984-2700 • Fax (434) 978-1444
Charlottesville •Lynchburg
Page3of9
Sarah Baldwin, Senior Plaht'er •✓
County of Albemarle
January 31, 2014
5. Comment: Sidewalks are typically shown on both sides of street. Is there a waiver
to show sidewalk on one side of the street for Blackbird Lane and Swanson Drive
Extended? Please clarify.
Response: This site plan is consistent with the ZMA Plan and the Initial Plan.
6. Comment: For Blackbird Lane, Swanson Drive Extended and 4th St, all entrances
from travelway shall show a 25' radius at a minimum. See VDOT standard on page
F-103. The link is shown below.
http://www.extranet.vdot.state.va.us/locdes/Electronic Pubs/2005%2ORDM/AppendF.pdf
Response: The entrances have been updated to show a 25' radius with exception to the
northwest corner of the entrance at the intersection of Blackbird and District. That radius
is 15' per a meeting at the County Office Building on 1/30/14.
7. Comment: Show a solid yellow line around median in NE corner of fuel area.
Response: A solid yellow line has been added to the median.
8. Comment: What are circular items on fuel area near island?Are they bollards?
Response: The circular items are fueling ports for the fuel tanks.
9. Comment: Please provide a circulation path for heaviest vehicle (i.e., fuel trucks
and 18 wheelers to bldg. F-1)to ensure radius of medians are adequate.
Response: A truck turn exhibit has been included for your use.
10. Comment: On sheet C-l0, the entrance to Block G from 4th St has not been
approved by the County Engineer. The additional traffic study has not been
presented nor has it been approved by the County Engineer. Please show the
median with no breaks.
Response: The plan has been revised to show the median with no breaks.
11. Comment: It appears some comments from the ZMA have not been addressed and
should be addressed during the site plan phase. Please address the following:
a. The intersection of Swanson Drive Extended and 4th St. is almost addressed.
The median on 4th St needs to be widened to about 4' and revised to a raised
3040 Avemore Square Place • Charlottesville,VA 22911
Telephone(434) 984-2700 • Fax(434) 978-1444
Charlottesville •Lynchburg
Page 4 of 9
Sarah Baldwin, Senior PI'!efi'her r..�
County of Albemarle
January 31, 2014
median for its entire length. The pavement striping will not work. This raised
median will be a pedestrian refuge if future sidewalks are necessary.
Response: The median along 4th street has been revised.
b. Please provide a minimum radius of 3' for the median allowing channelized
flow from Swanson Drive Extended.
Response: The radius of the median has been revised.
c. There is still an abrupt taper passed the intersection of Swanson Drive Extended
and 4th St. This area is almost addressed. Please use VDOT taper standard 8:1.
http://www.extranet.vdot.state.va.us/1ocdes/Electronic Pubs/2005%2ORDM/AppendF.pdf
Response: The taper has been updated to allow for an 8:1 taper.
d. Extend island around fuel area to 4th St.
Response: The island has been extended.
e. On the SE corner of Bldg F-1, the pavement tapers off again. Please use VDOT
taper standard 8:1. A smoother transition shall be shown for future connection
to work. Also, maintain the 30' travelway around bldg. corner.
Response: The taper has been updated in accordance with Appendix F of the VDOT
Road Design Manual. Appendix F states that the length of transition on roadways with a
design speed less than 45mph shall use the following equation:
L=S2W=60
Utilizing a design speed of 15 mph for an 18' pavement shift equates to a transition
length of 67.5'. A transition length of 75.5' is provided. The 30' travelway width has
been updated as well.
In addition a reverse curve has been incorporated based on your e-mail dated 1/24/14.
f. On NE side of bldg. there are concrete slabs. The travelway needs to be clearly
conveyed along this area. I recommend providing pavement marking for
travelway.
3040 Avemore Square Place • Charlottesville,VA 22911
Telephone(434) 984-2700 •Fax(434) 978-1444
Charlottesville •Lynchburg
Page 5 of 9
Sarah Baldwin, Senior I- ner
County of Albemarle
January 31, 2014
Response: Pavement striping has been added to between the concrete slabs on the North
side of the building.
g. The applicant has agreed to reserve a possible parking entrance at the
intersection of Blackbird Lane and District Ave. Please place a note on plan
noting the entrance will be opened if left turn lane queuing length to proposed
F-1 Bldg entrance is deemed inadequate by the County Engineer. I recommend
including an inset within sheet showing this entrance. Also, please show
easement for this entrance on plan.
Response: A new entrance has been added to the plans at this location.
12. Comment: Please show and label all the future connections on plan. Include the
connector road to Commonwealth since it has been proffered.
Response: The future connections are shown on drawing number C-7 and have been
added to drawing numbers C-8, C-9 and C-10.
13. Comment: Please show easements on plan for private road. This will need to be
recorded on a plat. Also note, that stub outs for future connections shall be shown
with easements. The easement should be wide enough for required grading to build
future connection.
Response: The easements are shown on the road sections, drawing number C-12, on the
Stonefield Blocks F and G Road Plan. The easements will be shown on the plat with the
infrastructure shone shaded light.
14. Comment: Please revise dimension for entrance near the vortechs. It appears
greater than 24'.
Response: The dimension has been adjusted.
15. Comment: The parking stall near the vortechs area needs to be 9' x 18'. Please
revise stall and revise dimensions for the 9' x 17.5' and 9' x 18.5'.
Response: The dimensions have been revised.
16. Comment: Please clarify why additional parking is proposed near the vortechs area.
It appears this will be for future retail building within Block G.
3040 Avemore Square Place • Charlottesville,VA 22911
Telephone(434)984-2700 •Fax(434) 978-1444
Charlottesville •Lynchburg
4 Page 6 of 9
Sarah Baldwin, Senior Plafr
County of Albemarle
January 31, 2014
Response: The additional parking is to serve building F-1.
17. Comment: The entrance from Blackbird Lane to Block F (near Inglewood Drive) is
about 8%. Maximum entrance slope is 4%. Please revise.
Response: The entrance has been revised to 4% for the 40' landing.
18. Comment: Please provide 1' contours on site due to topography of site. Also,
clearly label high points on site.
Response: Additional spot elevations have been added to clarify the grading and
drainage based on a meeting at the County Office Building.
19. Comment: Provide detail for 225.1. There should be a depression to filterra inlet
for maximum capture. Otherwise, runoff will just spill over to structure 225.
Response: There is a Filterra detail on drawing number C-24.
20. Comment: Provide another filterra east of structure 226 to treat eastern side of that
parking area. Also, provide at a minimum .5% grade for parking along bldg's NW
wall for positive grade to additional filterra mentioned.
Response: A Filterra has been added to the referenced location. A minimum grade of
.5%has been used on the site.
21. Comment: As a general comment, please show a minimum .5% grade on site.
Response: A minimum grade of.5% has been used on the site.
22. Comment: All street name signs shall be located on the left side of the road per
Albemarle County Design Standards.
Response: The street signs will be installed based on the existing sign configuration on
the completed portion of the Stonefield development. A note has been added to the
"Stonefield Blocks F&G Road Plan" on Drawing Number C-1.
23. Comment: East of the loading dock wall are 478 contours. This area appears to be
a ponding area. Please address grading to divert runoff to an inlet.
Response: Spot elevations have been added to the grading plan.
3040 Avemore Square Place • Charlottesville,VA 22911
Telephone (434) 984-2700 • Fax(434) 978-1444
Charlottesville •Lynchburg
Page 7of9
Sarah Baldwin, Senior Prier ..
County of Albemarle
January 31, 2014
24. Comment: It appears there is more capture to DI structure 222 than filterra structure
222.1. Please revise layout for more treatment.
Response: Typically the overflow structure will have more runoff area than the Filterras.
25. Comment: Provide an island for parking located west of loading dock entrance.
Response: An island has been added.
26. Comment: Some areas for proposed retaining walls are near the property line. For
example in the NW corner, the retaining walls are about 12' high. It appears that
land disturbance will be over the property line to construct walls. I recommend
obtaining a grading easement from adjacent property owner. It appears there is
another retaining wall right at the property line on the western property boundary
line. Please clarify for all retaining walls near property line.
Response: The wall on the property line has been moved away from the property line. A
note has been added to Sheet C-8.
27. Comment: There are two areas on Sheet C-11 and C-12 that shows the sidewalk
tapering from 6' to 5'. I do not see the need to taper as majority of sidewalk is 6'.
Please revise.
Response: The existing sidewalk is 5' wide along Blackbird lane. The new sidewalks are
6' wide. Both new and existing sidewalks now terminate at the new entrance.
28. Comment: Please revise the spot elevations for the entrance to bldg. F-1 from
Blackbird Lane. The topo is not clear if it is a positive slope or negative slope. It
appears the island towards the underground pipes can be lowered so runoff can be
conveyed to parking lot inlet instead of Blackbird Lane.
Response: This entrance has been eliminated.
29. Comment: On southern end of parking lot, there is a spot elevation 72.01 (TC) that
will act as a low spot. Please revise so runoff can drain to structure 206.1.
Response: The spot elevations have been revised.
3040 Avemore Square Place • Charlottesville,VA 22911
Telephone(434) 984-2700 • Fax(434) 978-1444
Charlottesville •Lynchburg
Page 8 of 9
Sarah Baldwin, Senior Phrriner .......`
County of Albemarle
January 31, 2014
30. Comment: For crosswalk across Swanson Drive Extended and continues to Bldg F-
1, I recommend shifting about 3' north to be in alignment with sidewalk running
east. This will also allow pavement marking near crosswalk to shift closer to
intersection.
Response: The cross walk has been revised.
31. Comment: Please provide 20' easements for all SWM facilities and stormsewer
pipes.
Response: Public stormwater easements for pipes and SWM facilities are shown on plan.
Private stormwater easements will be shown on the plat only.
Fire and Rescue, Robbie Gilmer
1. Comment: FDC location shall be on the address side of the building and within 50
ft of a fire hydrant.
Response: The FDC location has been moved to the addressed side of the building.
2. Comment: Please add a note to the plans to address a Key box. Please contact
Albemarle County Fire Prevention Office during construction to discuss the location
of the Key box.
Response: A note has been added to Drawing No. C-4 in the coordination notes.
We trust that the above responses and revised plans properly address the outstanding
items. If you have any questions,please contact me.
Sincerely,
WW A ociates, Inc.
A,__, 0
Robert C. Umberger
Project Manager
3040 Avemore Square Place • Charlottesville,VA 22911
Telephone(434) 984-2700 • Fax (434) 978-1444
Charlottesville •Lynchburg