HomeMy WebLinkAboutARB201300187 Review Comments 2014-05-20 air
X28 Blackwell Park Lane, Suite 201
Warrenton, VA 20186
PHONE 540.349.4500
E N G I N E E R I N G FAx 540.349.0321
May 20,2014
Via Federal Express
County of Albemarle
Department of Community Development
401 McIntire Road,North Wing
Charlottesville, VA 22902-4596
Attn: Margaret Maliszewki
Re: Wegman's Final Site Plan
SDP201300065
5th Street Station
5th Street SW&Avon Street Ext.
Charlottesville,VA 22902
Albemarle County
BE#V122001
Dear Ms. Maliszewki:
Bohler Engineering is pleased to submit on behalf of S.J. Collins, the Wegman's Final Site Plan to
construct a Wegman's grocery store and associated parking on 65.64 acres for the 5th Street Station
application in Albemarle County, VA. The following is our comment response letter addressing
comments received from you dated April 10, 2013. Each comment is addressed and responded to as
follows:
ARB Comments—Margaret Maliszewski:
Comment 1: Revised the plan to indicate if the windows in the shorter towers are transparent glass or
some other material.Indicate if the interior tower space is illuminated.
Response 1: Please see comment responses from Architect.
Comment 2: Revise the plan to indicate if the clock in the tower is to be illuminated. If it is, provide
details and clarify brightness.
Response 2: The elevations have been revised to note an internally illuminated clock face.
Comment 3: Clarify if/how the concrete stains will match the corresponding materials listed on the
materials board.
Response 3: Please see comment responses from Architect.
Comment 4: Revise the elevation drawings to distinguish between Brick 1 and Brick 2, and to
accurately label the concrete stain colors.
Response 4: The materials board have been corrected.
OTHER OFFICE LOCATIONS:
•Southborough, MA •Albany, NY • Purchase, NY • Ronkonkoma, NY •Warren, NJ • Center Valley, PA
508.480.9900 518.438.9900 914.251.9800 631.738.1200 908.668.8300 610.709.9971
•Chalfont, PA •Towson, MD •Sterling, VA • Bowie, MD • Fort Lauderdale, FL
215.996.9100 410.821.7900 703.709.9500 301.809.4500 954.202.7000
CIVIL AND CONSULTING ENGINEERS • SURVEYORS • PROJECT MANAGERS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS
www.BohlerEngineering.com
2:1 B O H L E R `'"`'" ,'•"i Margaret Maliszewki
E N G I N E E R I N G
5t'Street Station
Wegman's Final Site Plan— 1 st Submission
5/20/14
Page 2 of 4
Comment 5: Provide a physical sample of the standing seam metal for review.
Response 5: A physical sample was provided at the ARB hearing in February.
Comment 6: Provide elevations with the roofline, equipment heights shown.
Response 6: Building elevations have been provided
Comment 7: Add the standard mechanical equipment note to the plan: "Visibility of all mechanical
equipment from the Entrance Corridor shall be eliminated".
Response 7: The standard mechanical equipment note has been added to the Site plan. Please see
Sheet 6F.
Comment 8: Revise the photometric plan to eliminate spillover in excess of .5fc, including at the
entrance to the site from Bent Creek Road.
Response 8: Photometric Plan has been revised to eliminate spillover in excess of 0.5fc. Please see
Sheets 15A-J.
Comment 9: Eliminate the OA fixture that is proposed off-site.
Response 9: Fixture has been eliminated. Please see Sheet 15F.
Comment 10: Revise the photometric plan to carry the footcandle readings out to the property line on
the I64 side of the site.
Response 10: Photometric Plan has been revised. Please see Sheets 15F-G.
Comment 11: Limit illumination to 20 fc maximum.
Response 11: Illumination has been limited to 20fc maximum. Please see Sheets 15A-J.
Comment 12: Indicate on the plan if bases are proposed for the pole lights and indicate that the base
height is included in the maximum 20' height.
Response 12: A note has been added to the Plans indicating that all light poles shall be limited to 20'
maximum in height, including bases. Please see Sheets 15A-J.
Comment 13: Eliminate pole fixtures from the slope up to 164.
Response 13: Pole Fixtures from I64 slope have been eliminated. Please see Sheet 15F.
Comment 14: Coordinate the plan and fixture schedule regarding the quantity of HC and H.D fixtures.
Response 14: The Fixture schedule has been revised accordingly. Please see Sheet 16A.
Comment 15: Revise the lighting plan to eliminate light pole and utility conflicts.
Response 15: Lighting plan has been revised. Please see Sheets 15A-J.
Comment 16: Coordinate al drawings regarding the wall-mounted lantern fixtures.
Response 16: Drawings have been revised to coordinate wall-mounted fixtures. Please see Sheet 15F.
CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS
a] B O H L E R 4.- vire
Margaret Maliszewki
E N G I N E E R I N G
5`h Street Station
Wegman's Final Site Plan— 1st Submission
5/20/14
Page 3 of 4
Comment 17: Add the standard lighting note to the plan: "Each outdoor luminaire equipped with a lamp
that emits 3,000 or mote initial lumens shall be a full cutoff luminaire and shall be
arranged or shielded to reflect light away from adjoining residential districts and away
from adjacent roads. The spillover of lighting from luminaires onto public roads and
property in residential or rural areas zoning districts shall not exceed on half footcandles.
Response 17: Standard lighting note has been added. Please see Sheets 15A-J.
Comment 18: Locate all EC frontage trees within the limits of the parcel,not in the right-of-way.
Response 18: EC Frontage trees have been revised and placed out of the right-of-way. Please see
Landscape Plan, Sheets 13A-J.
Comment 19: Intersperse flowering ornamental trees among the Sycamores along Avon Street.
Response 19: Flowering ornamental trees have been interspersed among the Sycamores along Avon
Street. Please see Sheet 13J or Sheet 9C on the Bent Creek Parkway Road Improvement
Plan.
Comment 20: Submit the revised road plans for review. Label all tress, coordinate plant count with
quantities listed in the plant schedule, and clearly show trees coordinated with retaining
walls.
Response 20: Comment Noted. All trees have been labeled and coordinated with the quantities listed in
the plant schedule. Road Landscape Plan has been provided for reference, on Sheets
13H-J, but please refer to the Bent Creek Parkway Road Improvement Plan for full
design.
Comment 21: Provide trees at a minimum of 2 '/2" caliper, spaced 40' on center, along the travelway
that connects Bent Creek Road with the Wegman's parking lot.
Response 21: Trees have been provided along travelway that connects Bent Creek Road with
Wegman's parking lot. Please see Sheet 13D.
Comment 22: Provide medium trees, 2 '/2: caliper, spaced 25' on center along the sidewalk that runs
through the parking lot to the northeast corner of the building.
Response 22: 21/2 caliper trees have been provided along the sidewalk. Please see Sheet 13F.
Comment 23: Provide perimeter parking lot trees on the north side of the northern parking lot, 2 '/2'
caliper at planting,40' on center.
Response 23: Perimeter parking lot trees have been added on the Northeast side of the northern parking
lot; however they were not added on the Northwest side of the parking lot due to
retaining wall, utility easement, and sight distance issues. Please see Sheets 13D and
13F.
Comment 24: Provide the parking space count on the plan. Provide large trees at the interior of the
parking lot,one(1)for every 10 parking spaces,2 '/2"caliper at planting.
Response 24: One large interior tree has been added for every 10 parking spaces. Please see Sheets
13A-G and 14A for calculation.
CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS
Ltil B O H L E R *--e Margaret Maliszewki
E N G I N E E R I N G
5"'Street Station
Wegman's Final Site Plan— 1S`Submission
5/20/14
Page 4 of 4
Comment 25: Continue the planting on I64 side of the site the full length of the grading along the
property line.
Response 25: Plantings have been continued along the full length of graded berm along property line.
Please see Sheet 13G.
Comment 26: Coordinate the quantities of ZS, PS and IG on the plan and in the plant schedule.
Response 26: Plan and Plant schedule have been revised. Please see Sheets 13A-14A.
Comment 27: Provide documentation showing that the planting and grading in the right-of-way is
acceptable to VDOT.
Response 27: Comment Acknowledged. Documentation that approves planting and grading in the
ROW will be provided with VDOT plan approval.
Comment 28: Add the standard landscape note to the plan: "All site plantings of trees and shrubs shall
be allowed to reach, and be maintained at, mature height; the topping of trees is
prohibited. Shrubs and trees shall be pruned minimally and only to support the overall
health of the plant."
Response 28: Landscape note has been added to the Plan. Please see Sheets 13A-J.
Comment 29: Provide updated visualization from 164 depicting updated proposed landscaping.
Response 29: Updated sight sections will be provided with the review of this submission.
Comment 30: Install all plantings 3' from the top of the berm to ensure that lower foliage provides full
screening.
Response 30: Plantings have been revised to ensure that lower foliage provides full screening. Please
see Sheets 13F-G.
Should you have any questions regarding this project or require additional information, please do not
hesitate to contact me at(540)349-4500.
Sincerely,
Bohle n'inneeerin
4 / .
P.niel R.Hines,P.E.
cc: Dan Tucker,S.J.Collins
DRH/Ib
H:\12\V122001\Permitting\Jurisdictional Letters\Wegman's Final Site Plan 1st Review Comments\140520 Wegman's Final Site Plan 1st Review
CRL-ARB.doc
CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS
•
•
✓ : 4-
T
Ntimie
CTP 1-evise the plan to indicate if the windows in the shorter towers are transparent glass or some other material. Indicate
F.the interior tower space is illuminated. .
'`°
r.,....,::- Revise the plan to indicate if the clock in the tower is to be illuminated. If it is, provide details and clarify brightness.
i"
/
3.. Clarify if/how the concrete stains will match the corresponding materials listed on the materials board. ..
a. ( ),>4--r.:
Revise the elevation drawings to distinguish between Brick 1 and Brick 2, and to accurately label the concrete stain
colors. l-: , '
6/ CHIC I °r , . . 't..j • „s/
r 41,. Provide a physical sam)le of the standing seam metal for review. /
m-A Provide elevations with the roofline, equipment locations, and equipment heights shown.r ',
/ ,fpm
/7. Add the standard mechanical equipment note to the plan: "Visibility of all mechanical equipment from the Entrance
V Corridor shall be eliminated."
Revise the photometric plan to eliminate spillover in excess of.5 fc, including at the entrance to the site from Bent
Creek Road.
1../.9'.--
.. Eliminate the OA fixturE that is proposed off-site.
Revise the photometric plan to carry the footcandle readings out to the property line on the 164 side of the site.
„7J,v,,iT !_`'L.> ('.G�'r.,.,.A,%. ,per ` r,...1
1. Limit illumination to 20 fc maximum. . ' -
/''(, -r- I Y5' i ( 4. , )4, 1 1---.) c,-,1 e s,:,...- ,,f.,.,L, ,, 4 ,,,:_ ,,
c
Now
12. indicate on the plan if bases are proposed for the pole lights and indicate that t'Rebase height is included in the
maximum 20' height. _
0
1 . -liminate pole fixtures f:om the slope up to 164. '
(14. Coordinate the plan and fixxt`urye,s/chedul✓e regarding the quantity of HC and HD fixtu,,r�/es.
j - . 4
e �'�J`� ) �n .€ LL 1 v c. ..0 -w
/ a.' 6 4 LAil. , ,,, L,..,_,IT, / ,,,tr y,e-,-'-` {
11) Revise the lighting plan to eliminate light pole and utility conflicts.
f Zit.. (1.,-, C ltd` z r^,�. 1217 "/L. v-r1 i.:-it.' , . ' 1. F / n{ ,,..-y•..-[t /e-�G1`1- jc�.,l4.'<a;r-1-.G,-. , �.!
U f� /
' 16. Coordinate all drawings regarding the wall-mounted lantern fixtures. 1 j
Lttj` i 1. ,,/ :� t/A r 1.4..�,N�p
VAdd the standard lightirg note to the plan: "Each outdoor luminaire equipped with a lamp that emits 3,000 or more
initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining
residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and
property in residential c'-rural areas zoning districts shall not exceed one half footcandle."
in
-I- ..t,,k,.
. Locate all EC frontage trees within the limits of the parcel, not in the right-of-way.
f r „ "€
+�19. Intersperse flowering ornamental trees among the Sycamores along Avon Street.
20. ubmit revised road plans for review. Label all trees, coordinate plant counts with quantities listed in the plant
`-- schedule, and clearly show trees coordinated with retaining walls. ;
1,1 4(,, 4,. (?/(1.,.4.4 ,"t .:. , :/, a :s' : .k. )
S K,.<)/
"-A,.'":(, r t C" F t' 4.fc a,.i
•
23. Ibrovide perimeter parking lot trees on the north side of the northern parking lot, 2'/" caliper at planting, 40' on center.
/f f .
1
r (--.t., . (7,•,. c' ,L,_...., ,, ._„,--( 1 �,?) `i.' : „e' `
4-) (
C2rovide the parking space count on the plan. Provide large trees at the interior of the parking lot, one (1) for every 10
_ //////par ing spaces, 21/2” caliper at planting. /
'll�
) U
ae jt� d tt _s
`:
1725. Continue the planting on the,164 side of the site the full length of the grading along the property line.
l f (
26. Coordinate the quantities of ZS, PS and IG on the plan and in the plant schedule. /l - - - `
27, Provide documentation showing that the planting and grading in the right-of-way is acceptable to VDOT.
, A-d�d the standard lands..ape note to the plan: "All site plantings of trees and shrubs shall be allowed to reach, and be
I/ maintained at, mature I-eight; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only
to support the overall health of the plant."
29. Provide updated visualizations form 164 depicting updated proposed landscaping. G"- /
AP4 ...,.c. % -
i
110/. Install all plantings 3' from the top of the berm to ensure that lower foliage provides full screening./
14 ? ., - '1 z.:
pi0,_-,, ..t L, y-, %•) , <`-. , L ( r , , ,„ fix. -� � 1 �
*4■✓ TM �O
BoHLER 28 Blackwell Park Lane,Suite 201
Warrenton,VA 20186
PHONE 540.349.4500
E N G I N E E R I N G
August 21,2014
Via Hand Delivery
County of Albemarle
Department of Community Development
401 McIntire Road,North Wing
Charlottesville,VA 22902-4596
Attn: Margaret Maliszewki
Re: Wegmans Final Site Plan
SDP201300065
5th Street Station
5th Street SW&Avon Street Ext.
Charlottesville,VA 22902
Albemarle County
BE#V122001
Dear Ms. Maliszewki:
Bohler Engineering is pleased to submit on behalf of S.J. Collins, the Wegmans Final Site Plan to
construct a Wegmans grocery store and associated parking on 65.64 acres for the 5th Street Station
application in Albemarle County, VA. The following is our comment response letter addressing
comments received from you dated June 10, 2014. Each comment is addressed and responded to as
follows:
ARB Comments—Mariaret Maliszewski:
Comment 1: Rexisecf the plan to indicate if the to,incfoc\s in the shorter tcmcr, are transparent cIas, or
some oilier material. Indicate if the interior to14er space i. illuminated. I ilk e:+nnnient lia ,
heel 1 addee e-,ed.
Comment 2: Revise the plan to indicate if the clock in the tower is to be illuminated. If it is, provide
details and clarify brightness. This comment has been partially addressed. A note has
been added to the elevation drawings stating that the clock is to be internally illuminated.
However, no details have been provided and the degree of brightness has not been
clarified. Provide details on the illumination of the clock and clarify the degree of
brightness.
Response 2: Comment Acknowledged. Details on the illumination of the clock and clarification
on the degree of brightness have been provided as a separate package with this
submission.
CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS
WWW.BOH LERENGINEERING.COM
B O H L E R'-- Margaret Maliszewki
5th Street Station
N i; I \ r. t R I N c Wegmans Final Site Plan-2"d Submission
8/21/14
Page 2 of 7
Comment 3: Clarify if/how the concrete stains will match the corresponding materials listed on the
materials board. This comment has been partially addressed. A revised materials sample
board was provided at the February 3 meeting and it included more accurate
representations of the concrete stain colors. Bohler's May 20 resubmittal memo states,
"Please see comment responses from Architect." The Architect's responses were not
provided. Please provide the architect's responses.
Response 3: Wegmans stated that they approve the material colors during the submittal process
after the job has been awarded to the contractor. Stain samples are collected and
approved, and if necessary can be customized to fit their needs exactly. If there is
still some doubt on the color,during the construction phase,a test area is chosen to
accept or reject the color.If rejected,they will customize further in order to provide
what is shown on the materials board.
Comment 4: Re\ i,e the ele\anon dra\\in,s to distinguish het\\een brick I and Brick and 1k,
accurate!\ label the concrete l hk common ha,; been ac.ldl'eti,e,l,
Comment 5: Provide a physical sample of the standing seam metal for review. Bohler's May 20
resubmittal memo states that a sample of the standing seam metal was provided at the
February 3 meeting;however,no sample was retained. Please resubmit the sample.
Response 5: As requested, a sample of the standing seam metal has been provided for review &
approval with this submission.
Comment 6: Provide elevations with the roofline, equipment heights shown. The elevations do not
show the roofline, equipment locations, or equipment heights. This comment is meant to
clearly show that the rooftop equipment will be fully screened by the parapets. Provide
elevations with the roofline, equipment locations,and equipment heights shown.
Response 6: As requested, elevations with roofline equipment locations and heights shown have
been provided with this submission.
Comment 7: :1dd the standard mechanical equipment note to the pan: "1'i,ibilit\ al all nlechanieal
equipment from the I',Ilirance ( orridar `,hall he eliminated-. i lll', continent has been
adds essecl.
Response 7: l he ,tandard nlechvlical equipment note has been added to the 'site plan. Please see
sheet t,l .
Comment 8: Re\ise the photunlctri.: plan to eliminate spillo\er in excess of including at the
entrance to the site from Bent Creek Road. I his continent has been addressed.
Comment 9: F l i n i i n a t e the O 1 \lure that is proposed oll-site. 1 his comment has been addressed.
Comment 10: Re■Ise the photometrle plan to calf■ the ftolcandle readings out to the properh line on
the 164 side of the site. I his comment has been addressed.
Comment 11: Limit illumination to 20 lc ma\Munn. This comment has been addressed.
CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS
WWW.BOHLERENGINEERING.COM
B O H L E R `"' Margaret Maliszewki
5 Street Station
t N C t \ I f R I N a Wegmans Final Site Plan—2nd Submission
8/21/14
Page 3 of 7
Comment 12: Indicate on the plan if bases are proposed for the pole lights and indicate that the base
height is included in the maximum 20' height. Bohler's May 20 resubmittal memo states
that a note indicating the maximum 20' height including bases has been added to Sheets
15A-J. Please clarify the locations of the note on these sheets.
Response 12: Comment Acknowledged. A note has been added to Sheets 15A-J to state that the
20' maximum mounting height will include the bases. Please see Note 3 on Sheets
15A-J.
Comment 13: 1.'Militate pole fixture; front the slope up to It)-l. This comment has been addressed.
Comment 14: Coordinate the plan and fixture schedule regarding the quantity of HC and HD fixtures.
This comment has been addressed in part. There are 2 lights at Bent Creek Road that are
not labeled. Are these HD fixtures? There is a stray HC label in Bent Creek Road. One
light near the southwest corner of the building is not labeled. Is this an HC fixture?
Response 14: The two (2) lights at Bent Creek Road are no longer proposed, therefore have been
removed from the plans along with the stray HC label. Also, the light near the
southwest corner of Wegmans has been labeled for your review. Please see Sheets
15A and 15F.
Comment 15: Revise the lighting plan to eliminate light pole and utility conflicts. Light poles are
located on pipes in several locations, within easements in a few locations; confirmation
from Engineering that these conflicts are acceptable is required. Alternatively, eliminate
the light pole and utility conflicts.
Response 15: Light poles have been revised to eliminate utility conflicts in most areas. There are
two (2) light poles that remain proposed on top of the Stormwater management
vault. It is the opinion of the engineer that due to the depth of the Stormwater
management vault (12' in the ground to the top of pipe), there will not be any
adverse effects from the light poles' current location and that plan approval by
County Engineering will confirm this. Please see sheet 15F.
Comment 16: Coordinate all drawings regarding the wall-mounted lantern fixtures. The plan shows 16
W3 and 7 WI fixtures. The lighting schedule lists 18 W3 and 8 W1 fixtures. Lighting
detail sheet 16D identifies a W2 fixture.
Response 16: All drawings and tables have been revised to correctly show the proposed light
fixtures. Please see Sheets 15F, 16A,and 16D
Comment 17: idd the standard lighting. note to the plan: "f:ach outdoor lu mainaire equipped \\ith a lamp
that emits 3.tfl)0 or mote initial lumen, shall he a Intl cutup luminaire and shall be
arranged or shielded to reflect light a'.\a\ from adjoiltinri residential districts and a'∎aN
from adjacent roads. I he spilto\er of Iit_:;htine, frome luminaires onto public: road; and
property in residential or rural areas roving districts shall not exceed on half footcandlcs.
This comment has been addressed.
Comment 18: Locate all IT' frontage trees e\ithin the limits of the parcel, not in the right-oLx ax. Phis
comment has been addressed
CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS
WWW.BOH LERENGINEERI NG.COM
B O H L E p '--- Margaret Maliszewki
5d1 Street Station
g ( 1 ". 1 I. R 1 N t: Wegmans Final Site Plan—2nd Submission
8/21/14
Page 4 of 7
Comment 19: Intersperse flowering ornamental trees among the Sycamores along Avon Street.
Bohler's May 20 resubmittal memo suggests viewing 13J or 9C in the Bent Creek
Parkway Road Improvement Plan. The Ben Creek Parkway Road Improvement Plan was
not submitted for review. Sheet 13J does not identify tree species or sizes. Provide the
road plan for review.
Response 19: Comment Acknowledged. The Road Plans have been provided for review with this
submission.
Comment 20: Submit the revised road plans for review. Label all tress, coordinate plant count with
quantities listed in the plant schedule, and clearly show trees coordinated with retaining
walls. The Bent Creek Parkway Road Improvement Plan was not submitted for review.
Provide the road plan for review.
Response 20: Comment Acknowledged. The Road Plans have been submitted for review with this
submission.
Comment 21: Provide trees at a minimum of 2 1/2" caliper, spaced 40' on center, along the travelway
that connects Bent Creek Road with the Wegmans parking lot. This comment has been
addressed in part. Trees have been provided along the southern and northern ends of the
eastern side of the road. Trees have not been provided where the retaining wall is located
close to the road. Provide trees in the required location, or find an alternate substitute
location.
Response 21: Large shade trees have been specified at 40' intervals at the bottom side of the
retaining wall along the entrance to the Wegmans parking lot from Bent Creek
Road. All trees at the bottom side of the retaining wall are inside the limits of
disturbance and outside of the tree preservation area.The trees are 2 '/2"caliper and
specified 40' on center. Additionally,the sidewalk running along the eastern side of
the travelway has been adjusted in order to allow large shade trees, spaced 40' on
center,to be placed evenly on the entire road.Please see sheet 13D.
Comment 22: Provide medium trees, 2 1/2: caliper, spaced 25' on center along the sidewalk that runs
through the parking lot to the northeast corner of the building. This comment has been
addressed in part. The trees were provided at 1-1 '/4"caliper. Revise the tree size to 2 '/2"
caliper at planting.
Response 22: The six (6) Japanese Pagodatree planted along the sidewalk connecting to the
northeast corner of the Wegmans building have been revised to 2 '/z"caliper.Please
see sheet 14A.
Comment 23: Provide perimeter parking lot trees on the north side of the northern parking lot, 2 Y2'
caliper at planting, 40' on center. This comment has been addressed in part. Trees have
not been added to the northwest side of the parking lot due to retaining wall, easements,
and sight distance. Moving the trees to the interior of the parking row located along the
wall would be an acceptable alternative.
CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS
WWW.BOHLERENGINEERING.COM
✓ B O H L E R* Margaret Maliszewki
5`h Street Station
t N G I N F F. R I N C Wegmans Final Site Plan—2nd Submission
8/21/14
Page 5 of 7
Response 23: Five (5) Zelkovas have been added to the area behind the retaining wall along the
northern drive aisle. The guard rail has been shifted one and a half feet towards the
parking lot to provide a planting area.Please see sheet 13D.
Comment 24: Provide the parking space count on the plan. Provide large trees at the interior of the
parking lot, one (1)for every 10 parking spaces, 2 '/2" caliper at planting. This comment
has been addressed in part. Please indicate where the parking space count is listed on the
plan. It appears that Dogwoods are used to count towards the interior tress requirement.
Dogwoods are not considered large trees; large trees are required for interior parking lot
trees. Please revise accordingly.
Response 24: The parking space count is listed on sheet 14A within the compliance chart titled
"Compliance Chart for the Albemarle County Zoning Ordinance". The landscape
plan has been revised to replace all ornamental trees with large or medium canopy
trees.
Comment 25: Continue the planting on 164 side of the site the full leit,,lh of the ,grading along the
properl■ hue. I his comment has been addressed.
Comment 26: Coordinate the \luauti!tics of%S. I'ti and 1(1 on the plan and in the plant schedule. I his
c uturnnt has been addressed.
Comment 27: Provide documentation showing that the planting and grading in the right-of-way is
acceptable to VDOT. This comment has not been addressed. Evidence of VDOT
approval is still required.
Response 27: Comment Acknowledged. The grading and planting within the right of way is
shown on the Wegmans Final Site Plan, which has been reviewed by VDOT.
Approval of the Wegmans plan by VDOT will be provided.
Comment 28: :1\id the standard landscape note to the plan: "Ahi site planting, of trees and shrubs shall
he alh\\\ed to reach. and he maintained at. mature height: the topping of trees is
prohibited. tihruhs and trees shatl be pruned rninintall■ and .,nl■ to support die \er;111
health of the plant.' I his comment has been addressed.
Comment 29: Provide updated visualization from I64 depicting updated proposed landscaping. This
comment has not been addressed. Visualizations have not been received. Please note
that it is staff's understanding that the ARB was referring to updates to the 3D images
previously provided,not site sections,when this comment was made.
Response 29: Through recent discussions and coordination, it was determined that updated site
sections were not required.
Comment 30: Install all plantin s 3' from the top of the berm to ensure that I ,\\er foliage pry \ ides hill
screening. I his comment has been addressed.
CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS
WWW.BOHLERENGINEERING.COM
Margaret Street Station
1, \ (; I 1. L R I N C Wegmans Final Site Plan—2"d Submission
8/21/14
Page 6 of 7
Should you have any questions regarding this project or require additional information, please do not
hesitate to contact me at(540)349-4500.
Sincerely,
Bohler E 'neerin
aniel R. fines,P.E.
cc: Dan Tucker,S.J.Collins
DRH/ls
H:\12\V122001\PermittinglJurisdictional Letters\Wegman's Final Site Plan 2nd Review Comments\140821 Wegman's Final Site Plan 2nd
Review CRL-ARB.doc