HomeMy WebLinkAboutARB201500144 Review Comments 2015-11-30 Margaret Maliszewski
From: McLernon, Laura <laura.mclernon @comfortsystemsusa.com>
Sent: Monday, November 30, 2015 7:18 AM
To: Margaret Maliszewski
Subject: RE: Application - Certificate of Appropriateness
Hello Margaret,
Please see the answers I garnered from our project manager below:
1) This unit is the shortest of the options we have. Matching the older existing curb and duct configuration is
driving the requirement for the adapter which is resulting in the overall height increase. Shifting the unit is not
feasible due to building structural concerns, also the screen wall around the equipment on this part of the
building would prevent lateral movement of the equipment.
2) The roof is flat black EPDM. The parapet or screen wall is grey, the equipment will be painted to match so that
roof outline is uninterrupted.
Do we need to resubmit the paperwork with this information?
Thank you again for your help and I hope you enjoyed your Thanksgiving!
Laura McLernon ,"-
Service Project Administrator 427/2410141/4.
COMFORT
SYSTEM B� d.t S
COLO �"M � �Y`aA '
1977 Snow Point Lane I Charlottesville,VA 22902
434.981.6942 ( ColonialWebb.com "-
2 q- 3
From: Margaret Maliszewski [mailto:MMaliszewski @albemarle.org]
Sent:Tuesday, November 24, 2015 4:34 PM
To: McLernon, Laura <laura.mclernon @comfortsystemsusa.com>
Subject: RE: Application -Certificate of Appropriateness
Laura,
I've looked over your submittal. A few things:
1. The Entrance Corridor guidelines state that mechanical equipment should be located to eliminate visibility from
the Entrance Corridor. Can the equipment be shifted to further reduce visibility? If not, please indicate what
other locations have been considered and why they are not workable. Have you looked for a shorter unit?
2. What color is the parapet?What color is the roof? Based on your illustration, it looks like equipment is seen
rising above the roof—not the parapet. Am I reading the illustration correctly?
Thanks for your help.
Margaret
From: McLernon, Laura [mailto:laura.mclernon @comfortsystemsusa.com]
Sent: Monday, November 23, 2015 4:59 PM
To: Margaret Maliszewski<MMaliszewski @albemarle.org>
Subject:Application -Certificate of Appropriateness
1
Good afternoon Ms. Maliszewski,
I dropped off an application this afternoon for a certificate of appropriateness for an air conditioning unit we are
proposing to install on the roof of a building along the 29 corridor. The gentleman at the front desk gave me your card
and said he would put the application in your box. I am new to the area and I have never been through this review
process. I am hoping I provided all of the necessary paperwork. Would you be able to tell me what the time frame is for
the review?
Thank you for your time!