County of Albemarle
Department of Community Development
Memorandum
To: David Jordan (DJordangroudabush.com)
CC: Bill Ledbetter (BLedbetter(&roudabush.com)
From: J.T. Newberry (jnewberrykalbemarle.org)
Division: Planning
Date: December 10, 2015
Subject: SUB201500191 Old Trail Village Block 31 - Final
The Planner will recommend approval of the plat referred to above when the following items have been satisfactorily
addressed. (The following comments are those that have been identified at this time. Additional comments or conditions
may be added or eliminated based on further review.)
Planning
1. [Comment] Please update the plat to reflect the recordation of the plats for Block 12 and Block 15, including
details of the right -of -way, area summaries, ACSA easements, etc.
2. [Section 14- 302(A)(9)] On Sheet 1, please add a note to indicate that each lot contains a building site that
complies with Section 4.2 of the Albemarle County Zoning Ordinance.
3. [Section 14- 302(B)(8) /Table 7 on page 31 of the C.O.D.] On Sheet 1, please revise the side setback to show 10
feet.
Please contact J.T. Newberry at 434 - 296 -5832, ext. 3270 or jnewbgM&albemarle.org for further information about the
comments above.
ACSA
1. [Comment] The ACSA has not yet received construction plans for review and approval in Block 31. The ACSA
is unable to provide comments on the final plat until construction plans have been approved by the ACSA.
Please contact Alex Morrison at 434 - 977 -4511, ext. 116 or amorrison@serviceauthori , .org for further information about
the comments above.
Engineering
1. Please see attached comments.
E911, Fire /Rescue, and Inspections Division
Based on plans dated 10/21/2015, we have "no objection" to the plat as submitted.
Project Name:
Date Completed
Review Comments
SU13201500191
Jul Trail Village - BIk_ 31 - Final
= relay, December 04, 2015 Final Plat
Reviewer: John Anderson
DepalmeMDlVaIONAgency: Engineering
Reviews Comments:
1 _ Recommend tie for 46.45' residue boundary bearing 5 We 26"17° E Tie with Lot 45 boundary
appears =43'±
2. Provide Exhibit to place in WP0201500066 file if additional developer grading is acquiretl beyond
proposetl mass grading shown on WPO201500066 for these lots. Lot lines are visible as faint lines_ -Ref
email JAto RCA, December03, 20156]5 PM
3. Note_ Exhibit (item #2) does not constitute WPO Amendment (No fee, limited review; POF preview will
save time)_
4. Note_ This is a Final Plat without Preliminary Plot Proposetl grade is located! with WPO201400006
(blocks 11, 14, 12, 15), Approved! 17 Nov 2015_
5. Note_ Lots 1 -7 front a public street Rowcross Street ROAD Plan was approed 2 -Dec 2015
(SUB201400196)_ ROAD Plan bond is in process_
6. Note_ SWM is per Lickinghole Regional Basin -ref JA email to B_ Ledbetter, December 03, 2015615
PM_ No additional SWM or ESC design is anticipated or acquiretl unless additional grading prompts reused!
ESC measures_ If additional or reused! ESC measures are acquiretl beyond those shown with
WP02015000 K3, coordinate with Mark Hopkins_ Requirement to bond is waivetl for additional measures
which will fall welkwithin WPO bond contingency And -Ref WPO20140071bond_
Z Note_ Lickinghole Regional Basin Fee will be paid with Final Plat, as condition of Approval
janderson2 12/4/2015 135 PM