HomeMy WebLinkAboutSDP201500055 Review Comments Initial Site Plan 2015-12-09COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
December 9, 2015
Scott Collins
200 Garrett Street, Suite K.
Charlottesville VA 22902
RE: SDP201500055 Sunset Overlook - Initial Site Plan
Mr. Collins:
The Site Review Committee has reviewed the development proposal referenced above. Initial comments
for the following divisions of the Department of Community Development and other agencies, as
applicable, are attached:
Albemarle County Planning Services
Albemarle County Engineering Services
Albemarle County Information Services (E911)
Albemarle County Building Inspections
Albemarle County Architectural Review Board (ARB)
Albemarle County Service Authority
Albemarle County Department of Fire Rescue
Virginia Department of Transportation
Comments reflect information available at the time the development proposal was reviewed, and should
not be considered final. However, the Site Review Committee has attempted to identify all issues that will
be required to be resolved prior to Final Site Plan approval. The Lead Reviewer will either approve with
conditions or deny the Initial Site Plan within 15 days of the Site Review Meeting.
Please contact me at your earliest convenience if you have questions or require additional information.
Sincerely
Senior Planner
Phone 434-296-5832
OFC�A3G��
�'IRGIIne'
County of Albemarle
Department of Community Development
401 McIntire Road,
Charlottesville, VA, 22902
Memorandum
Fax 434-972-4126
To:
Scott Collins
From:
Christopher P. Perez, Senior Planner
Division:
Planning
Date:
Revision - December 9, 2015
Subject:
SDP201500055 Sunset Overlook - Initial Site Plan
The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following
comments have been satisfactorily addressed (The following comments are those that have been identified at this time.
Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by
the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.]
1. [Comment] Pay the $200 public notification fee prior to any further review/action of the plan.
2. [Comment] This application was reviewed against Site Development Plan requirements only. Lot lines are shown on
the plan, but no subdivision application was submitted. Any subdivision related comments are provided for reference
only unless necessary for site plan approval.
[32.5.2(i), 14-233(A)31 When private streets in development areas may be authorized. This plan proposes a private
street (Sun Valley Drive) that serves 15 single family detached residential lots. While streets (public or private) are not
reviewed or approved with site plan applications, it should be noted that a private street request must be submitted
when/if a subdivision application is submitted. The Agent is not able to authorize this private street; rather, it requires
Planning Commission authorization. Submit the required private street request pursuant to Section 14-233(A)3 along
with the required justification. A maintenance agreement for the private street must be submitted for review and
approval by the County Attorney's Office with the subdivision application.
4. [32.5.2(d), 30.7.4(b)(h)] Slopes less than 25% based on new topographic information. Any use or structure allowed by
right or by special use permit in the underlying district, provided that the owner submits new topographic information
that is based on more accurate or better technical data demonstrating, to the satisfaction of the county engineer, that
the slopes are less than twenty-five (25) percent. The site plan relies on new topographic information. County Engineer
sign -off on this topographic information is required prior to final site plan approval.
5. [30.7] Steep Slopes Overlay District. The labeling of Preserved and Managed slopes shall be consistent and accurate
throughout the plan. The only Managed slopes onsite are those fronting Old Lynchburg Road; all other slopes onsite
are Preserved slopes and shall be labeled as such. Regardless of whether the County Engineer is satisfied with the new
topographic information or not, the labeling of the slopes does not change. Revise the plan accordingly.
6. [32.5.2(a), 15.4.11 Bonus factors for Environmental Standards. Bonus factors shall not be permitted for any
improvement or design feature already required by the ordinance. Preserved slopes within the development areas of the
County shall not be disturbed; therefore, Tree Preservation of existing vegetation on these slopes is already a required
feature and cannot be counted toward bonus density. Without the use of bonus factors the true densityfor this
development is Standard Level Cluster - 4du/acre.
The development may be able to qualify for a 5% bonus density increase if Tree Preservation area of at least 10% of
the site is outside of Preserved slopes. If this requirement can be met, on the final site plan provide the calculations for
verification. Also, prior to final site plan and/or plat approval provide an exhibit which shows that all tree preservation
areas meet the definition of a wooded area from Section 3.1 of the Zoning Ordinance.
7. [14-403, 32.5.2(i)] Lot frontage. Each lot within a subdivision shall have frontage on an existing or proposed street.
Lots 17 — 43 are not provided frontage on either an existing or proposed street. The sidewalk and landscape strip
improvements along Sunset Avenue Extended must be dedicated to public use. This will allow Lots 17 — 43 to utilize
Sunset Avenue Extended as their required street frontage. When dedicating the frontage it is recommended that the
developer assure adequate area for a bike lane within the right-of-way.
8. [32.5.2(i)] The Comprehensive Plan provides guidance that Sunset Avenue Extended should have bike lanes. To meet
this guidance, a 10' -wide multi -use path is recommended in place of the proposed sidewalk along Sunset Avenue
Extended (See the Design Standards Manual for exact specifications.)
9. [32.5.2(a), 32.5.2(0)] Areas to be dedicated. On the plan clearly depict and label any areas intended to be dedicated to
public use (such as street right-of-way). Also, provide a note stating that the land is to be dedicated for public use. Prior
to final site plan approval any dedications shall take place on a plat to be reviewed by the County, approved, and then
recorded in the Clerk's Office. The DB page information of this action shall be provided on the final site plan.
Please be aware that the County is seeking state funding to improve the alignment of Sunset Avenue to include bike
lanes and sidewalks, with one sidewalk constructed as a multi -use path (10' width), consistent with recommendations
of the Comprehensive Plan. It is a high priority project on the County's Transportation Priority List adopted by the
Board of Supervisors. It is recommended that the dedication of right-of-way for frontage be sufficient to facilitate these
improvements. Provision of right-of-way for these improvements will help to minimize impacts to the built site when
the roads are ultimately constructed. No plans for the improvements have been completed to date; therefore,
"centerline" and right-of-way information for the improvements are not available. However, to the extent feasible, the
site should be designed to accommodate the proposed road improvements in order to avoid future impacts to the
development from the future road improvements.
10. 132.5.2(n), 32.7.2.3] Sidewalks. The sidewalks provided along Sunset Avenue Extended shall be extended to the
adjacent property lines. Currently they terminate 5 feet from the property lines. Also, provide the required sidewalk and
landscaping strip along Sunset Avenue Extended for the 20 feet of frontage for Open Space C.
11. [32.7.1] Dedication of land for walkways. The frontage of Lot 16 along Country Green Road shall be dedicated for
public use to accommodate a future sidewalk connection to Country Green Cottages. Depict and label this area on the
final site plan and final subdivision plat.
12. [Comment] Sheet 1 provides a note which reads: "No offsite disturbance is proposed with this plan. Sunset Avenue
Extended shall be upgraded with the Wintergreen Farm Project. " It is recommended that the owners of TMP 76-49B
(Wintergreen Farm LLC) dedicate the portion of land on Sunset Avenue Extended which fronts Lot 16 for public use.
This dedication will allow for a future connection of sidewalks on Sunset Avenue Extended with those on Country
Green Road. This may be accomplished on the final subdivision plat for Wintergreen Farm.
13. [32.5.2(n), 32.7.2.3(c)] Interconnectivity of sidewalks or pedestrian ways. On the plan depict and label the existing
paved pedestrian path that runs behind Lots 9 & 10 along Old Lynchburg Road (Rte 631). Also, on the final site plan
provide a pedestrian connection through Open Space E, connecting the sidewalk on Sunset Valley Drive to the paved
pedestrian path on Old Lynchburg Road. On the final plat assure that this pedestrian connection is located in an
easement.
14. [32.5.2(1)] Streets. On the plan label Country Green Road (SR 875) and dimension the prescriptive easement width.
Also, provide the centerline information and pavement widths.
15. [32.5.2(i)] Streets. Label and dimension the 30 foot prescriptive easement along Sunset Avenue Extended. Also,
provide the centerline information and pavement widths.
16. [32.5.2(a)] General Information. Development is proposed on TMP 76-52N. Prior to final site plan approval TMP 76-
52N and TMP 76-52 shall be combined through a plat. The DB page information of this action shall be provided on the
final site plan.
17. [32.5.2(a)] General Information. The acreage of TMP 76-52N shall be included in the acreage for the site, this
information will modify the density calculations currently on the plan.
Pa
18. 132.7.2. 11 Vehicular Access to Site. Each entrance onto any public street shall be designed and constructed as required
by the standards of the Virginia Department of Transportation. VDOT approval of the proposed entrance to the site
shall be required prior to final site plan approval.
19. [32.5.2(f)] Watercourses and other bodies of water. On sheet 1 revise the watershed note as follows: "This site lies
within the Moores Creek Watershed, which is not a water supply watershed. " Also, on the plan label the intermittent
stream at the rear of the property.
20. [32.5.20),(k),(1)] Verify that the location(s) and dimensions of all existing and proposed utilities and utility easements
including water, sewer, drainage, telephone, cable, electric and gas are shown on the plan. Label all existing easements
with the Deed Book and Page Number.
21. [32.5.2(n), 32.5.1(c)] Dimensions. On the plan depict and dimension all proposed improvements, including buildings,
driveways, and garages.
22. [32.5.2(n)] Proposed Improvements. Provide the maximum footprint for all proposed buildings.
23. [32.5.2(n), 4.16.2] Proposed Improvements. On the plan list the amenities that will be provided in the tot lot. Also, it is
suggested that a 4 foot tall wooden fence be provided at the rear of the tot lot to prevent children from inadvertently
falling down into the ravine.
24. [14-236(c)] Alleys. Where alleys are authorized, driveways shall be provided only from the alley. On the plan depict,
label, and dimension the driveways for each lot.
25. [14-303(E)] Alleys. On the final plat provide the alley with an easement labeled "Alley Easement". Also, list the
easement holder on the plat (i.e., the HOA).
26. [32.5.1(c), 15.3, 4.11.31 Setbacks. Include the side setbacks and garage setbacks on sheet 1. They are: "Side setback—
none (see Building separation) ". Garage Setbacks: "Front loaded garage: minimum 18 feet setback from R/W. Side
loaded garage: minimum S feet setback from R/W. "
27. [32.5.1(c), 4.6.41 Rear yards on interior lots. Accurately depicted and dimension the rear yards of the townhome lots.
The rear yards shall be measured from the edge of the alley right-of-way or easement.
28. [32.5.2(n)] Proposed Improvements. On the final site plan clarify what is happening with the land between Lot 43 and
Sun Valley Drive (54 foot private right-of-way). Is it to be open space? Is it to be added to Lot 43?
29. 132.5.2(n), 4.12.61 Parking. On the plan provide parking calculations for the multifamily units to include the number of
bedrooms/units in each townhouse. This information is required in order to calculate the required parking for the use. If
each unit is planned to have 2 bedrooms or more, then 2 spaces are required per unit. Additionally, ifparking is
provided on each lot then one guest space shall be required per 4 units (27 units /4 = 7 spaces).
30. 14.12.16, 4.12.16(d)] Minimum design requirements for parking. Parallel parking spaces shall be a minimum of 9 foot
wide by 20 foot long. Revise the eight guest spaces to meet the minimum length requirements. Also, provide the guest
spaces with some type of identification (sign or paint striping).
31. [32.5.2(n)] Existing and proposed improvements. Clearly depict and label limits of disturbance and show areas where
existing vegetation will be removed.
32. [32.5.2(n)] Existing and proposed improvements. Dimension the full width of the retaining walls required for
construction. Also, list the type of retaining wall used in the development (i.e., Geogrid, block/redi-rock walls).
33. [32.5.2(a)] Add Entrance Corridor (EC) to the Zoning information on sheet 1. Approval from the Architectural Review
Board (ARB) is required prior to final site plan approval. See attached ARB comments from Ellie Ray.
34. [32.5.1(c)] All required off-site easements must be approved and recorded prior to site plan approval. It appears there
are off-site sight distance easements required over TMP 76-52E and 52D. Prior to final site plan approval any required
easements will need to be plated. The DB page information of this action shall be provided on the final site plan.
35. [14-317] Instrument evidencing maintenance of certain improvements. Submit with the final plat an instrument
assuring the perpetual maintenance of street trees, private streets and alleys, open space and any other improvements
that are to be maintained in perpetuity.
36. [14-311] Infrastructure improvement plans. Road Plans and WPO application must be approved, all required
improvements must be built or bonded, and all required Deeds and Declarations must be reviewed and approved prior
to Final Plat approval.
37. [32.6.20)] Landscape plan. A landscape plan that complies with section 32.7.9 is required with the final site plan.
38. [32.7.9.4(b)] Existing trees maybe preserved in lieu of planting new plant materials in order to satisfy the landscaping
and screening requirements of section 32.7.9, subject to the agent's approval. If you intend to use existing trees to
satisfy any of the landscape plan requirements, please include the following:
1. Areas and other features shown on landscape plan. The landscape plan shall show the trees to be preserved,
the limits of clearing, the location and type of protective fencing, grade changes requiring tree wells or walls,
and trenching or tunneling proposed beyond the limits of clearing.
2. Conservation checklist. The applicant shall sign a conservation checklist approved by the agent to ensure that
the specified trees will be protected during construction. Except as otherwise expressly approved by the agent
in a particular case, the checklist shall conform to the specifications in the Virginia Erosion and Sediment
Control Handbook, pages III -393 through III -413, and as hereafter amended.
39. [32.7.9.4(c)] Existing landscape features. On the landscape plan identify whether existing wooded areas are evergreen,
deciduous, or a mix thereof.
40. [32.7.9.5] Street Trees. Street trees are required along all existing and proposed streets; provide street trees on the
Sunset Avenue Extended frontage and along both sides of Sun Valley Drive.
41. [32.7.9.8] Tree canopy. The minimum required tree canopy for the site is 20 percent. It appears the majority of the tree
canopy requirement will be met with existing trees. Provide calculations on the final site plan to show this requirement
has been met.
42. [32.5.2(p) & 32.7.9.7] Screening. All of the proposed SWM Facilities shall be screened from the adjacent residential
lots. Provide the required screening.
Please contact Christopher P. Perez in the Planning Division by using cperez a,albemarle. of or 434-296-5832
ext. 3443 for further information.
0
County of Albemarle
Department of Community Development
Memorandum
To: Christopher Perez, Planning
From: Justin Deel, Engineering
Date: 4 December 2015
Subject: Sunset Overlook Initial Site Plan (SDP201500055)
The initial site plan for Sunset Overlook has been reviewed. The following concerns should be addressed;
1. Slopes within the preserved slopes overlay district that are proven to be less than 25% based on
new topographic information do not become managed slopes, as indicated by the "existing
managed slopes" labels in these areas. These labels should be removed. A note may be added
indicating that these areas are less than 25% based on new aerial topography to be confirmed by
field survey prior to final site plan. While the uses allowed by right or by special use permit in the
underlying district may be permitted if new topographic information (field survey) proves that the
slopes in questions are less than 25% [30.7.4.b.l.h], this does not change the preserved slope
designation. Note that if a field survey does not show that the areas in question are less and 25%,
all disturbance in those areas must be removed.
2. Alleys are required to intersect streets at two locations; however, dead-end alleys with turnarounds
may be permitted by waiver by the County Engineer [Design Standards Manual]. Please request
that the applicant submit a waiver request to the County Engineer for the proposed dead-end alley.
3. The grading on the proposed alley is unclear. There are no shown proposed contours between
512' and 522'. Proposed topography should be shown at 2' contour intervals. Note that alley
grades must not exceed 20% [Design Standards Manual].
4. Drainage easements for drainage passing through the site from offsite should extend to the
property line or ROW. See proposed 20' drainage easements located just off alley cul-de-sac and
at the private street entrance on to Sunset Ave. Ext.
5. Much of the proposed slopes in and around the SWM facilities are 2:1. Slopes greater than 3:1
require low -maintenance ground cover (not grass); this should be specified on plans.
6. There does not appear to be adequate vehicle access to the proposed SWM facilities. SWM
facilities must have a 10' wide access path graded at less than 20%. Grades exceeding 20% must
be graveled or paved [Design Standards Manual].
7. While it is important that proposed SWM facilities be shown on the site plan to review grading,
access, and treatment feasibility, etc., the actual SWM plan is not reviewed with the site plan but
with the VSMP. Therefore, the SWM plan sheet (5) should be removed from the site plan.
8. It is unclear whether the proposed sidewalks along Sunset Ave. Ext. are within the ROW. Please
request clarification. It is preferable that sidewalks be within street ROW.
9. Adequate sight distance on Sunset Ave. Ext. at the entrance to the proposed subdivision is not
demonstrated with this plan. Please request that the applicant include such an exhibit in the plan.
10. A safety fence should be provided for the retaining wall on lots 1 & 2.
11. VSMP and Road Plan approvals are prerequisites to Final Site Plan approval.
12. VDOT approval of the proposed entrance on to Sunset Ave. Ext. is required.
Project Name:
Date Completed:
Reviewer:
Department/Divisiori/Agency:
Reviews Comments:
Approved_
Re. iew Comments
SDP201500055
unset Overlook - 'nitial
Tuesday, November 10, 2015 Initial Site Plan
4ndrew Slack
E911
L
Re,, iew Comments
S D P201500055
Project Name_ unset Overlook - `nit4
Date Completed:
Reviewer:
Department/Division/Agency-
Reviews Comments:
No objections
vlonday, November 16, 2015
Jay Schlothauer
Inspections
L__.._..._
Initial Site Plan
Project Name:
Date Completed:
RevieA comments
SDP201500055
unset Overlook - 4nitial
e Tuesday. December 08 2015
Reviewer: Ellie Ray
Department/Division/Agency: ARB
Reviews Comments:
Initial Site Plan
Motion: Mr. Missel moved to approve the consent agenda and forward the recommendations outlined in the
staff report to the Agent for the Site Review Committee, as follows:
-Regarding requirements to satisfy the design guidelines as per § 18-30.6.4(2), (3) and (5):
1_ Preserve existing trees within the proposed open space along Rt. 631- In areas where existing trees are
used to meet tree requirements along Rt. 631, identify existing individual large shade and ornamental trees on
the plan by size and species to show that the minimum requirement can be met_ If the requirement can't be
met; show additional new trees to be planted to meet the requirement.
-Regarding recommendations on the plan as it relates to the guidelines- t lone_
Regarding recommended conditions of initial plan approval:
Certificate of Appropriateness is required prior to final site plan approval.
2_ Show mechanical equipment on the plan. Show how visibility of the equipment will be eliminated.
3_ Include the standard mechanical equipment note on the site plan: '', isibility of all mechanical equipment
from the Entrance Corridor shall be eliminated_`
4_ Preserve existing trees within the proposed open space along Rt. 631. in areas where existing trees are
used to meet tree requirements along Rt. 631, identify existing individual large shade and ornamental trees on
the plan by size and species to show that the minimum requirement can be met. If the requirement can't be
met, show additional new trees to be planted to meet the requirement. Add the standard plant health note to
the plan: 'All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height;.
the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to supp,art the overall
health of the plant.'
5_ Show the existing asphalt path on the plans_
6_ Provide a conservation checklist on the pian.
7. Show tree protection fencing on the plan
-Regarding conditions to be satisfied prior to issuance of a grading permit-
1_ Provide a conservation checklist on the pian. Show tree protection fencing on the plan_
Mr. Lebo seconded the motion.
The motion carried by a vote of 4::0_
Review Status: Requested Changes F__1
Page: `1 County of Albemarle Printed On: J1210W2015
Albemarle County
Service Auth ob rity
TO: Chris Perez
FROM: Alexander J. Morrison, P.E., Civil Engineer
DATE: December 8, 2015
RE: Site Plan Technical Review for: SDP201500055: Sunset Overlook — Initial Site Plan
The below checked items apply to this site.
✓ 1. This site plan is within the Authority's jurisdictional area for:
✓ A. Water and sewer
B. Water only
C. Water only to existing structure
D. Limited service
✓ 2. A RWSA 20 inch water line is located approximately 30' distant.
3. Fire flow from, nearest public hydrant, located distant from this site plan, is
Gpm + at 20 psi residual.
✓ 4. An 8 inch sewer line is located approximately 675' distant.
5. An Industrial Waste Ordinance survey form must be completed.
✓ 6. No improvements or obstructions shall be placed within existing or future
easements.
7. and plans are currently under review.
8. and plans have been received and approved.
9. No plans are required.
✓ 10. Final and plans are required for our review and approval prior to
granting tentative approval.
11. Final site plan may/may not be signed.
✓ 12. RWSA approval for water and/or sewer connections.
13. City of Charlottesville approval for sewer.
✓ Comments:
Submit 3 copies of the final utility plan, a water data sheet and a sewer data sheet to the
ACSA for review and approval. The submission shall be directed to the attention of
Michael Vieira, PE.
The ACSA is currently coordinating with the Department of Fire/Rescue on the final
locations for fire hydrants. This information will be provided to the applicant once it is
finalized.
RWSA review and approval for the nwater main connection is required.
168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977-4511 • Fax (434) 979-0698
www.serviceauthority.org
Review Comments
SDP201500055
Project Mame: unset Overlook - 'nitial
Date Completed: Tuesday, December 018, 2015 [Initial Site Plan
Reviewer: Bobbie Gilmer
DepartmentiDivision./Agency: Fire RescueELI
Reviews Comments:
Comments based on plans dated 10126/15
1. Streets 29' or less shall be marked No Parking per Albemarle County Code on one side.
2. Fire flow test required before final approva'i.
3. Hydrant locations shall be at the EJ4wing locations.
1. Cul-de-sac on Sun Valley Drive.
2. North side of the intersection for private alley and Sun Valley Drive.
3. Located between Lot 23 and Lot 24 on the Sunset Ave Extended side of the townhomes.
COMMONWEALTH of VIRCJ MITA
DEPARTMENT OF TRANSPORTATION
1601 Orange Road
Culpeper, Virginia 22701
Charles A. Kilpatrick, P.E.
Commissioner
December 7, 2015
Mr, Christopher Perez
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Re: SDP -2015-00055 Sunset Overlook Initial Site Plan
Dear Mr. Perez:
We have reviewed the initial site plan for Sunset Overlook, dated October 26, 2015, as submitted by
Collins Engineering and offer the following comments;
1, Right and left tum lane warrants should be provided.
2. Sheet 1:
a. Line of sight easements should be shown.
b. Line of sight profiles should be provided.
c. The private alley should be shifted further east on Sun Valley Drive. The minimum
corner clearance is 225'.
d. CG -12 ramps should be provided at the Sun Valley Drive/Sunset Ave. Ext. intersection.
e. The limits of the Public/Private right-of-way lines should be clearly identified.
3. The 18" DIP waterline connection should be jack and bored under the existing section of Sunset
Ave. Extended.
4. Guardrail is not recommended where curb and gutter is used. Modifications/new installation of
guardrail shall be designed in accordance with the VDOT Road Design Manual, Appendix I -
"Traffic Barrier Installation Criteria". Ie. What is the adjusted length of need, curb type, offsets
from face of curb etc.
5. Storm sewer profiles and storm sewer calculations shall be provided during the Road Plan/Final
Site plan submittal.
6. The typical section for the widening of Sunset Ave. should be provided.
7. The entrance/ widening pavement section shall meet or exceed Sunset Ave. Extended.
If you need additional information concerning this project, please do not hesitate to contact me at
(434) 422-9894.
Sincerely,
Shelly Plaster
Land Development Engineer
Culpeper District WE KEEP VIRGINIA MOVING