Loading...
HomeMy WebLinkAboutSDP201500049 Checklist - Project Closeout (Administrative) 2015-11-20 SUBDIVISION/SITE PLAN FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS CHECKLIST Please complete this form within 30 days of final action,place in folder and forward to CDA FOR QC : 1 . 'tatus label. CDA will forward to the Imaging Center for digital closeout. SDP SUB# 46 I S - PROJECT TITLE I,v s 5, s,,,� f t�'t LL NAME OF LEAD REVIEWED,,/,) 1,0, ,1-- ,,re.Z FINAL ACTION DATE: ✓/r--o-is Cou tyView — ❑Application,Page 2 Data Entered . -epo , roun. 'Y a er • - - , . . •. - • . • - - I- Hardcopy— File Folder Closeout: All items listed should be placed in project folder,in reverse 1 chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file,place an"N/A" next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide clarity to the file,please indicate that item on the"Other" lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or, if the document is already in digital format, can be saved to LaserFiche. Please provide the digital location(path/name)of the document in the space provided. ngineerm older Information/documentation i_12 Scan ❑ Saved location (;❑-Application(signature copy) -Er Scan ❑ Saved location El—Public Notification records/Abutting Owner correspondence Scan ❑ Saved location AD Applicant orrespondence(to/from, memos/emails) Scan ❑ Saved location Complete set of printed Review Comments „Er-Scan ❑ Saved location Approved n/pla (sige , n or stamped"Approved"with Planner/Engineer name) '.❑i'�Scan ❑ Saved location Action Letter(Administrative Approval) i . ❑J Scan ❑ Saved location IiiiiiillOMOWIMVIMPIMIMPRINPS Other(Please explain—i.e. Studies) So Is i -1 )y `%l.,.)., s '7 « r.,,,,,--x--1 ,J Scan ❑ Saved location ❑ Scan ❑ Saved location - if itaiiiiiimmedabiligt st. •• . . . y should be clearl arked • . . • . . 1 :in a note c an ying w y i was in '1 1 ed. e oca ion Additional Information on this project: I