HomeMy WebLinkAboutWPO201200081 Review Comments As-Built Reviews 2015-12-16Al
vr�N1Q
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project:
Plan preparer:
Owner or rep.:
Plan received date;
Date of comments:
Reviewer:
Greyrock West
Dominion Engineering
Southern Development Group, Inc.
10 December 2015
16 December 2015
Max Greene
WP0201200081
[mmyers @dominioneng.com]
Thank you for submitting the revised as -built plans for the Greyrock West Subdivision Storm
Water Management Facility. The SWM (VSMP) plans from the original water protection plan
WP0201200081 have been compared to the as -built plan and appears to agree with the
requirements of the approved plan. The calculation for the as -built condition of the basin appear
to address the discrepancies in construction due to bedrock. I have added the trash rack to the
profile view to complete the "as -built plan" portion of the SWM requirements. However, the
debris cage does not have a bottom and is open to the basin. In addition, the stormwater system
leading into the basin needs to be cleaned due to the amount of debris and inlet protection stone
blocking portions of the pipe and manhole structures. A copy of a receipt from 30 July 2015 was
submitted from "RKM Enviroclean, Inc." but the pipes have not been cleared of debris at this
time. No SWM bond release is approved at this time.
Please contact this office for clarification on the SWM as -built plan requirements.
File: VSMP as -built review letter #2.doc