Loading...
HomeMy WebLinkAboutWPO201200081 Review Comments As-Built Reviews 2015-12-16Al vr�N1Q COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Plan preparer: Owner or rep.: Plan received date; Date of comments: Reviewer: Greyrock West Dominion Engineering Southern Development Group, Inc. 10 December 2015 16 December 2015 Max Greene WP0201200081 [mmyers @dominioneng.com] Thank you for submitting the revised as -built plans for the Greyrock West Subdivision Storm Water Management Facility. The SWM (VSMP) plans from the original water protection plan WP0201200081 have been compared to the as -built plan and appears to agree with the requirements of the approved plan. The calculation for the as -built condition of the basin appear to address the discrepancies in construction due to bedrock. I have added the trash rack to the profile view to complete the "as -built plan" portion of the SWM requirements. However, the debris cage does not have a bottom and is open to the basin. In addition, the stormwater system leading into the basin needs to be cleaned due to the amount of debris and inlet protection stone blocking portions of the pipe and manhole structures. A copy of a receipt from 30 July 2015 was submitted from "RKM Enviroclean, Inc." but the pipes have not been cleared of debris at this time. No SWM bond release is approved at this time. Please contact this office for clarification on the SWM as -built plan requirements. File: VSMP as -built review letter #2.doc