HomeMy WebLinkAboutSUB201500095 Checklist - Project Closeout (Administrative) 2015-12-18 SUBDIVISION/SITE PLAN FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS CHECKLIST Please complete this form within 30 days of final action,place in folder and forward to CDA FOR QC and stat : bel. CDA will forward to the Imaging Center for digital closeout. SDP UB a° 1 S - 5 PROJEC1 TITLE 7"mn 3 — 7 — 'J 4 FULL E OF LEAD REVIEWER 7 FINAL ACTION DATE: 4-`/Gf---/5 Cou View— pplication,Page 2 Data Entered . Hardcopy— File Folder Closeout: All items listed should be placed in project folder, in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file,place an"N/A" next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide clarity to the file,please indicate that item on the"Other" lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document;or, if the document is already in digital format, can be saved to LaserFiche. Please provide the digital location(path/name)of the document in the space provided. taimimmiummi Applicati (signature copy) Scan ❑ Saved location '111111."1110111.11M.1.11111.111111111111.4=r1.111111 ence •pplican orrespondence(to/from,memos/emails) Scan ❑ Saved location omplete t of printed Review Comments Scan ❑ Saved location I Approved an/plat(signed,or stamped"Approved"with Planner/Engineer name) Scan ❑ Saved location glinsinimowlea D ° ii•Pk lln:wwir: • tion copies of unapproved plans/plats may be placed in the file if it is referenced in the staff report or minutes and lends clarity to the review at a later date. If such plans are included,they should be clearly marked as unapproved and contain a note clarifying why it was included. tion Additional Information on this project: