Loading...
HomeMy WebLinkAboutWPO201500019 Correspondence 2015-05-15 , , cty *ow w P.O.Box 387 312 West Main Street Luray,Virginia 22835 Phone (540)743-9227 1 Fax(540)743-6118 contact @raceyengineering.com www.raceyengineering.com Civil, tructural,Mechanical Engineering and Surveying SWaM#666281 - HUBZone#28486 May 15, 2015 Racey Project #5502 Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 RE: Wetsel Property Disposal Area Plan SUBJECT: Comment Response Letter Mr. Greene, Please find our responses to your Review Comments dated 05/14/15 for the Wetsel Waste Area As-Built plans. Below is a summary of the comments with the Engineer's response following each comment in Italics: 1. Tie in contours at roadside. Response: The contours have now been shown to tie on the roadside area of the project. 2. Include CE in Disturbance. Response: The construction entrance has now been shown in the limits of disturbance 3. Extend the riprap on spillway to bottom of slope. Response: The riprap on the spillway has been extended to the bottom of the sediment trap slope. 4. Clean channel diversion detail. Response: The clean channel diversion detail has been added and the diversion dike on the ESC plan sheets has been amended to reference the clean channel diversion detail. 5. Put a RWD at CE Response: A right-of-way diversion has been added to the construction entrance. Patrick B.Racey,PE,Senior Manager and Principal Gary L.Shirley,PE,Associate Engineering Manager Tyler Austin,PE,Project Engineer, Kevin Shreiner,LS,PS,CFM,Resident Surveyor Page 1 of 2 r Now Albemarle County Department of Public Works, Comment Response Letter Wetsel Waste Area 05/15/15 6. Note/show a washbay at CE. Response: A washbay has been shown at the construction entrance. Please find attached three (3) copies of the site plan, second submittal for your review. If you have any questions regarding the responses of these comments, please feel free to contact me personally. Thank you. Sincerely, Racey Engineering, PLLC Tyler Austin, P.E. Operations Manager Attachment: Three (3) - Plan Sets dated 05/15/15 Cc: Project File #5502 GEY Page 2 of 2