Loading...
HomeMy WebLinkAboutWPO201500001 Correspondence 2015-07-21 s.....,�.r IMP PROJECT MANAGEMENT CIVIL ENGINEERING LAND PLANNING ENGINEERING July 21, 2015 Max Greene Albemarle County Department of Community Development 401 McIntire Road, Room 227 Charlottesville, VA 22902 Regarding: Northside Drive Stockpile VSMP Permit Plan Review Comments Dear Mr. Greene, We have reviewed the comments dated July 15, 2015 from the city and have amended the plans for this site. A. Stormwater Pollution Prevention Plan 1. A SWPPP is required for all commercial grading projects over 10,000 sf of disturbance: The Albemarle County SWPPP was filled out to meet this requirement and has been added to the current submission. B. Pollution Prevention Plan 1. The PPP was filled out as part of the SWPPP. C. Stormwater Management Plan 1. Please submit"tab A"and the "summary tab"from the VRRM spread sheet: These have been added to the SWMP 2. Detailed"to scale"plan is required for SWM structure:A to scale drawing of the detention pond has been added to the SWMP. D. Erosion and Sediment Control Plan 1. Aerial photography appears to show a parking lot and possible wall. Please show and label all existing structures and impervious areas on this project: The aerials were reviewed and the plan has been updated to show these offsite areas. 2. Paved construction entrance detail is required for plan approval: The stone CE detail was replaced with a paved CE detail. 3. Plan appears to show partial information for both a sediment trap and a basin with riser: The sediment trap will be converted to a basin with riser after construction, this has been cleared up and detailed on the current submission. 4. The CIP's with a drainage area of 1-3 acres are to be designed as sediment traps: The Inlet Protections outside of the area of disturbance were erroneously added in the first plan, these have since been removed because no sediment will enter these IP's due to site topography. 5. Cleanwater diversions need to be stabilized to prevent erosion: This diversion was stabilized with a VDOT standard LD-268 diversion culvert with EC-2 matting. This clarifying description has been added to the E&S narrative. Attached with this letter are 2 sets of the VSMP permit package with the application dated 7/21/15 that shows these changes. If you have any questions please do not hesitate to contact Justin Shimp, P.E. He may be reached at: Justinshimp- engineering.com or by phone at 434-953-6116. Best Regards, Keane Rucker Shimp Engineering, P.C. 2 SHIMP PROJECT MANAGEMENT CIVIL ENGINEERING LAND PLANNING ENGINEERING October 9, 2015 Max Greene Albemarle County Department of Community Development 401 McIntire Road, Room 227 Charlottesville, VA 22902 Regarding: Northside Drive Stockpile VSMP Permit Plan Review Comments Dear Mr. Greene, We have reviewed the comments revised on September 30, 2015 from the county and have amended the plans for this site. A. Pollution Prevention Plan 1. PPP:A plan sheet showing the locations is required by the State. A 11"x17" plan showing this has been 0 included for the PPP. B. Stormwater Management Plan � til 1. Project requires phosphorous removal of 0.23 lb,/pr proposed as nutrient credit purchase Please submit �' / j ^ �� documentation fur the nutrient credit purchase in accordance with State criteria, 4iia Kilmer `\ L (management Analyst) may he able to help address the requirements to prove purchase meets the State yl requirements. Documentation will be attached with this submittal. C. Erosion and Sediment Control Plan 1. Plan appears to show partial information for both a sediment trap and a basin with riser: This comment appears adequately addressed at this time, however the conversion to permanent structure will not be allowed until the site is completely stabilized due to the proposed evisceration of the structure for conversion. It ii'ould be better to install the riser and outfall barrel as a basin with the initial construction of the dam. To avoid clogging the riser with sediment . d causing and a maintenance issues, the riser and outfall barrel will be installed after site stabilization. ® I�� Pik e 2. Cleanwater diversions need to be stabilized to prevent erosion:Please show the liner on the detail to yL match the description in "Sediment Control"note #3 on page C'2 of 4. The liner was added and labelled on the appropriate detail. a c,�fiWYE Attached with this letter are 2 sets of the E&S Control Plan dated 10/9/15 that shows these changes, the nutrient credit documentation, and the PPP site map. If you have any questions please do not hesitate to contact Justin Shimp, P.E. He may be reached at: JustinO.shimp- engineering.com or by phone at 434-953-6116. Best Regards, Keane Rucker Shimp Engineering, P.C. 2