Loading...
HomeMy WebLinkAboutWPO201400086 Review Comments 2015-07-17 • COLLINS '✓ GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 434.293.3719 PH 434.293.2813 FX www.collins-engineering.com July 17, 2015 Justin Deel County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 RE: SUB-2014-00166& WPO Dear Justin: Thank you for your comments dated July 2, 2015. Revised plans are hereby submitted incorporating the following changes in response to the items in your letter: Engineering VSMP Permit Plan Review Comments (WPO-2014-00086) A. Stormwater Pollution Prevention Plan (SWPPP) 4. The LOD/registration statement exhibit was provided at an engineering meeting with the reviewer and emailed to Mr. Deel on 7/10/15. C. Stormwater Management Plan(SWMP) 10. The pond footprint has been reduced to keep out of the adjacent lots. The accessway has been removed from the adjacent properties and grades are sloped at 3:1 above the pond for safety/maintenance The new routing is provided on the SWM sheet (the elevations of the 2/10/100 year storms changed very slightly). 11. The spillway has been revised as shown in the engineering meeting to be in cut. D. Erosion and Sediment Control Plan (ESCP) 24. The ESC pond has been revised to fit the new smaller footprint. ACSA Sheet 1 1. The PE stamp with original signature on the first sheet will be provided prior to final approval. 2. The water and sewer data sheets are revised with the hydraulic capacity from the water model. 3. The applicant acknowledges this comment. Sheet 4 1. The correct footages from the sewer laterals as measured from the downstream manhole are now provided. 2. The sewer main now connects at Phase IV manhole 28 as requested. w.r ..r+ Please contact me if you have any questions or require any further information. Sincerely, Scott Collins, PE