HomeMy WebLinkAboutWPO201400086 Review Comments 2015-07-17 •
COLLINS '✓ GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902
434.293.3719 PH 434.293.2813 FX
www.collins-engineering.com
July 17, 2015
Justin Deel
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
RE: SUB-2014-00166& WPO
Dear Justin:
Thank you for your comments dated July 2, 2015. Revised plans are hereby submitted
incorporating the following changes in response to the items in your letter:
Engineering VSMP Permit Plan Review Comments (WPO-2014-00086)
A. Stormwater Pollution Prevention Plan (SWPPP)
4. The LOD/registration statement exhibit was provided at an engineering meeting with
the reviewer and emailed to Mr. Deel on 7/10/15.
C. Stormwater Management Plan(SWMP)
10. The pond footprint has been reduced to keep out of the adjacent lots. The accessway
has been removed from the adjacent properties and grades are sloped at 3:1 above
the pond for safety/maintenance The new routing is provided on the SWM sheet
(the elevations of the 2/10/100 year storms changed very slightly).
11. The spillway has been revised as shown in the engineering meeting to be in cut.
D. Erosion and Sediment Control Plan (ESCP)
24. The ESC pond has been revised to fit the new smaller footprint.
ACSA
Sheet 1
1. The PE stamp with original signature on the first sheet will be provided prior to final
approval.
2. The water and sewer data sheets are revised with the hydraulic capacity from the water
model.
3. The applicant acknowledges this comment.
Sheet 4
1. The correct footages from the sewer laterals as measured from the downstream manhole
are now provided.
2. The sewer main now connects at Phase IV manhole 28 as requested.
w.r ..r+
Please contact me if you have any questions or require any further information.
Sincerely,
Scott Collins, PE