Loading...
HomeMy WebLinkAboutWPO201400095 Inspection 2016-01-11�J �r IjIgA a Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 EROSION CONTROL RE—INSPECTION INVOICE #1 DATE: 1/12/2016 INVOICE TO: Piedmont Neighborhoods LP 11111 Sunset Hill Rd. Suite 200 Reston, VA 20190 RE: Notice To Comply Glenmore, K2C W P0201400095 DATE OF RE -INSPECTION: November 12, 2015 RE -INSPECTION FEE: $250.00 By February 12, 2015 you should forward the re -inspection fee of $250.00 to continue your project. To pay the re -inspection fee, please send a check payable to the County of Albemarle to my attention along with the enclosed copy of this invoice. If you should have any questions, please do not hesitate to contact me. Sincerely 11;V/J l Todd Shifflett Engineering Division TS/ Enclosure /k 12 -/5- COUNTY OF ALBEMARLE Department of Community Development ��[,c C•zi� 401 McIntire Road Charlottesville, Virginia 22902 NOTICE TO COMPLY Hand delivered Project: C. ija-).2C,14-l7tXArj Date:�S- Under section 17-900 of the Albemarle County Code, this is your NOTICE TO COMPLY with the ' . requirements of the VSMP Permit for the referenced project and to immediately take corrective measures that address the deficiencies on this property. The specific deficiencies are circled below: Mud on road Shovel and sweep all mud and dirt from the road. Install adequate wash - ac ce for cleaning. easnres stall Items not been installed per the approved plan, or have been removed. Install them, or obtain a plan amendment. Cla,,r iek 5S i:Q 3 4 s Pie/ lok-1 SS Measures failing Measures have failed more than once. Build larger, more effective ones, or amend the plan to better protect the site. eA,'#Utd t f.; Pkm + '5jV'Opr 4, X„c 4:re& 5s L, 4 "&M6eab,"t n Pk,,4A%t,J.K�f 4 Off% Site abandoned and repairs needed The site is not stabilized and erosion is occurring. lkd+ /V Repair all measures and stabilize.44s,e ECIC PtigC.lk 1.'$ A No inlet protection Inlet protection has not been installed. Install inlet protection per the plans. Site does not match plans The site has deviated too much from the approved plan, or the plan was not buildable. A plan amendment is required. SWPPP documents deficient Correct document deficiencies. Pollution prevention practices not followed Install, maintain practices per SWPPP and CGP. Washout facilities not provided or used Install and/or properly use washout facilities per SWPPP. Unless subsequently amended in writing by this off, it is expected all of these corrective measures will be completed by: Date:—117 1 I Re -inspection of this notice to verify corrective measures will incur a $250 fee (17-207/8, $150 for SF). Failure to take effective corrective measures will result in a Stop Work Order upon re -inspection. County Inspector Receipt Signature: