HomeMy WebLinkAboutWPO201400095 Inspection 2016-01-11 (2)Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
EROSION CONTROL RE -INSPECTION INVOICE #2
DATE: 1/12/2016
INVOICE TO: Piedmont Neighborhoods LP
11111 Sunset Hill Rd. Suite 200
Reston, VA 20190
RE: Notice To Comply
Glenmore, K2C
WP0201400095
DATE OF RE -INSPECTION: November 12, 2015
RE -INSPECTION FEE: $250.00
By February 12, 2015 you should forward the re -inspection fee of $250.00 to continue your
project. To pay the re -inspection fee, please send a check payable to the County of Albemarle
to my attention along with the enclosed copy of this invoice.
If you should have any questions, please do not hesitate to contact me.
Sincerely
r
Todd Shiffiett
Engineering Division
TS/
Enclosure
� A
Nrq�iNt�'
,2
rr� 2�c— ►�
NOTICE TO COMPLY
Hand delivered
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
Project: 67 4 Date: I /%5 -
Under section 17-900 of the Albemarle County Code, this is your NOTICE TO COMPLY with the
requirements of the V SMP Permit for the referenced project and to immediately take corrective measures
that address the deficiencies on this property. The specific deficiencies are circled below:
Mud on road Shovel and sweep all mud and dirt from the road. Install adequate wash -
rack and construction entrance for cleaning.
Measures not installed ems not been installed per the approved plan, or have been
tall them, or obtain a plan amendment. 4a&2�n,9 P fs PPS, f .50#YP ,4 e\,ic(e exv
iGloca, ec.Y 5antM V StWe.,It,Lkc C) C1Wd:*
Measures failing Measures have failed more than once. Build larger, more effective ones, or &5?4, PD
amend the plan to better protect the site.
Site abandoned and repairs needed The site is not stabilized and erosion is occurring.
Repair all measures and stabilize. V -Z s ,
No inlet protection Inlet protection has not been installed. Install inlet protection per the plans..
Site does not match plans The site has deviated too much from the approved plan, or the
plan was not buildable. A plan amendment is required.
SWPPP documents deficient Correct document deficiencies.
Pollution prevention practices not followed Install, maintain practices per SWPPP and CGP_
Washout facilities not provided or used Install and/or properly use washout facilities per
SWPPP.
Unless subsequently amended in writing by this office, it is expected all of these corrective
measures will be completed by: Date: -
Re -inspection of this notice to verify corrective measures will incur a $250 fee (17-207/8, $150 for SF).
Failure to take effective corrective measures will result in a Stop Work Order upon re -inspection.
County Inspector Signature: - s 1 ' ./ .
Receipt Si
DEQ site inspection 10/29/15
Corrective punch list
% Mud in Roadway -remove sediment tracked in roadway and ensure proper sediment removal measures
\/ are installed and functional.
Diversion Dike installed behind lots 5-9 need to be maintained and stabilized with straw/seed to ensure
IV water has a clear path
Regrade/stabilize slopes around the outlet structure for SB#1 adding additional layers of SF on crest of
J slope
J Correct Storm Structure in SB#3 restore to a water tight state
/ Complete installation of the riser structure in SB#2; ensuring the main drain orifice's elevation, mounted
V and the debris rack placed on the riser structure all per plan
/ Rework DD design with site engineer leading to SB#1 to prevent sediment buildup behind baffles and
around structure
Amend the SWPPP and the approved county site plan to show new location of sanitary sewer line
accounting for the additional disturbance
Contact the site engineer to evaluate the placement of the diversions shown on the plans leading into
V both sides of sediment basin #3