Loading...
HomeMy WebLinkAboutWPO201400087 Inspection 2016-01-11COUNTY OF ALBEMARLE Department of Community Development 481 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 EROSION CONTROL RE -INSPECTION INVOICE #1 DATE: 1/12/2016 INVOICE TO: Bluestone Land, LLC 1821 Avon Street, Suite 200 Charlottesville, VA 22902 RE: Notice To Comply Lofts at Meadowcreek W P0201400087 DATE OF RE -INSPECTION: November 24, 2015 RE -INSPECTION FEE: $250.00 By February 12, 2015 you should forward the re -inspection fee of $250.00 to continue your project. To pay the re -inspection fee, please send a check payable to the County of Albemarle to my attention along with the enclosed copy of this invoice. If you should have any questions, please do not hesitate to contact me. Sincerely Todd Shifflett Engineering Division TS/ Enclosure Hand delivered sf Z Sn oukt NOTICE TO COMPLY COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 Project: ;j)�z.a Cl �r t.�P�bi �� Date / 9 S Under section 17-900 of the Albemarle County Code, this is your NOTICE TO COMPLY with the requirements of the VSMP Permit for the referenced project and to immediately take corrective measures that address the deficiencies on this property. The specific deficiencies are circled below: Mud on road Shovel and sweep all mud and dirt from the road. Install adequate wash- nstruction entrance for cleaning. Measures not installed It not been installed per the approved plan, or have been removed. 1 them, or obtain a plan amendment.. n it ST c,3 a P -sIv4, /in, grekr'&Vl s42C Measures failing Measures have failed more than once. Build larger, more effective ones, or amend the plan to better protect the site. Site abandoned and repairs needed The site is not stabilized and erosion is occurring. Repair all measures and stabilize. No inlet protection Inlet protection has not been installed. Install inlet protection per the plans. Site does not match plans The site has deviated too much from the approved plan, or the plan was not buildable. A plan amendment is required. SWPPP documents deficient Correct document deficiencies. Pollution prevention practices not followed Install, maintain practices per SWPPP and CGP. Washout facilities not provided or used Install and/or properly use washout facilities per SWPPP. Unless subsequently amended in writing by this office, it is expected all of these corrective measures will be completed by: Date: // - / � Re -inspection of this notice to verify corrective measures will incur a $250 fee (17-207/8, $150 for SF). Failure to take effective corrective measures will result in a Stop Work Order upon re -inspection. County Inspector Signature: %�,t,.., `�3 U - 991 Receipt Signature: