Pm following up regarding our conversation last week about the Minor SPA now under review for Covenant
Church, 1025 East Rio Rd.
On August 29, 2011, a preliminary meeting was held at the Albemarle County Community Development office.
In attendance were Jim Smith and Clif Coleman of Coleman-Adams,the general contractor we are working
with, Tim Miller, our engineer with Meridian Planning Group, LLC, Pastor Harold L Bare, Sr., Covenant
Church (my father), and me. I regret that I failed to catch the last names of the county's representatives, but one
was Gerald, who I understood to be a permit reviewer, and the other was Phil, who I understood to be an
engineer.
During the course of the meeting we presented a concept drawing of our project, showing the location, and
general use of the new building to be constructed between our existing buildings.
In review of my notes from that day, the following items were raised by the county representatives:
i 1) Architectural Review Board - Question was raised whether we would be affected ARB,particularly the 500'
rule. Phil stepped out during our meeting and spoke to Marjorie Maliszewski, the principal planner for ARB.
She advised that the 500' rule only applies if the property itself is located in the ARB district, and since the
Church is not in the ARB district, ARB requirements do not apply to our project.
2) Erosion and Sediment- We were advised plan will be needed if over 10,000sf of soil is disturbed. We
currently do not believe this will occur, but will have our contractor review and submit E&S plan if necessary.
3) Parking - We were advised parking requirements should be reviewed. After the meeting,I followed up with
Ron Higgins, Chief of Zoning. He thoroughly reviewed parking requirements for our facility and advised that
the "assembly" area of our existing buildings only requires 155 parking spaces. We currently have 251 parking
spaces, well in excess of the required amount. While the submitted Minor SPA includes a reduction to 237
parking spaces, we will still have 82 spaces more than is required after completion of the proposed project. I am
forwarding the email correspondence I had with Mr. Higgins to you separately.
4) Site Plan Amendment- We were advised that submission of a Minor Site Plan Amendment would be
appropriate for our proposed project and use, i.e., assembly area is not increasing, no new driveway entrances to
be constructed, no infringement on setback requirements, minimal changes to parking lot will not affect Fire
and Rescue access, etc.
I trust this information will be useful for your review and coordination regarding our amendment. Please feel
free to contact me by email or on my cell,434-409-2114, if I can be helpful in any way.
Sincerely,
Danny Bare
Facilities Coordinator, Covenant Church
1
' d.bare _,covenantchurch.net `."
434-409-2114
2
Johnathan Newberry
From: Danny Bare [dannybfour @gmail.com]
Sent: Monday, April 29, 2013 3:54 PM
To: Johnathan Newberry
Cc: Danny Bare
Subject: Fwd: Re: Covenant Church -parking
JT,
Please see following info regarding parking at Covenant Church.
Thanks,
Danny Bare
Facilities Coordinator, Covenant Church
d.bare@covenantchurch.net
434-409-2114
Forwarded message
From: "Danny Bare" <dannybfour @gmail.com>
Date: Sep 13, 2011 1:06 PM
Subject: Re: Covenant Church-parking
To: "Ron Higgins" <rhiggins@,albemarle.org>
Cc: "Gerald Gatobu" <ggatobu a,albemarle.org>, "Bill Fritz" <BFRITZ(a,albemarle.org>, "Stewart Wright"
<swright2(a,albemarle.org>
Good afternoon Ron,
Thanks for reviewing and providing the clarification. I assume the previous plans show the sanctuary footage
including stage etc as part of assembly square footage, whereas I had measured actual seating area. It is good to
know the specific information you have provided and that parking will not present a problem with the proposed
addition.
Hope you have a good week.
Danny
On Tue, Sep 13, 2011 at 10:33 AM, Ron Higgins <rhiggins @albemarle.org>wrote:
Good morning, Danny:
1 have checked the original and subsequent site plans for the Covenant Church complex and found that the existing
parking is sufficient for the existing use and the addition.
As a matter of correction,your sanctuary is actually shown on previous site plans as having 9,608 sq. ft.plus a additional
"classroom"assembly area of 2,000 sq. ft. At I space per 75 sq. ft.this works out to 155 spaces. Your existing parking
1
is 251 spaces, so the additional 96 spaces should more than cover the new addition even if it were to become some type
of"assembly area".
I hope this helps you in planning for the addition/connection site plan amendment.
Ron Higgins
From: Danny Bare [mailto:dannybfour @gmail.com]
Sent: Monday, September 12,2011 1:54 PM
To: Ron Higgins
Subject: Re: Covenant Church-parking
Thanks for the update Ron. Hope your day is going well.
Danny
On Mon, Sep 12, 2011 at 1:51 PM, Ron Higgins <rhigginsna,albemarle.org> wrote:
Hello, Danny:
I have not forgotten you. I have not had a chance to check out the approved site plan and talk to the planner reviewing
your amendment. I am in meetings all afternoon, but hope to get this done this evening or tomorrow morning.
Ron H.
From: Danny Bare [mailto:dannybfour @umail.com]
Sent: Friday, September 02,2011 11:47 AM
To: Ron Higgins
Subject: Covenant Church-parking
Ron,
Just wanted to follow-up on our discussion earlier this week regarding Section 4.12.6 of the Albemarle County
Code that deals with parking for churches. Thank you for taking the time to talk with me.
My question particularly regarded the interpretation of"assembly". As I understood your response, assembly
relates to the main sanctuary of our facilities, and other areas such as classrooms, restrooms, lobbies, offices etc
2
are'considered accessory to the use of the sanctuary.
The seating area of our sanctuary is approximately 6200sf. At the required rate of 1 parking space per 75sf, this
would require us to have 83 spaces. As shown on our last submitted SPA#2010-089, we currently have 251
spaces.
Thus, since our proposed building will be accessory, and the size of our sanctuary will not be increased, we will
not need to address parking in the scope of this project.
Please verify this information at your earliest convenience.
Have a blessed long weekend.
Danny