Loading...
HomeMy WebLinkAboutARB201500149 Staff Report 2016-01-12ARCHITECTURAL REVIEW BOARD STAFF REPORT Project #/Name ARB- 2015 -66: Fifth Street Place Review Type Second review of the Final Site Development Plan with a third architectural review Parcel Identification 076000000054I0, 0760000000541A, 076000000054A, 076000000054A2, 076000000054A3, 076000000055B, 076000000055D Location At the southwest corner of the intersection of I64 and 5' Street Extended Zoned Residential (R2 and R I 0)/Entrance Corridor (EC) Owner /Applicant Gambit LLC, Snow Paws LLC et als /Dominion Realty Partners LLC (Michael M. Campbell) Magisterial District Scottsville Proposal To construct multi - family housing consisting of 200 apartment units in 5 buildings with associated site improvements. Context Multi- family housing is located to the west of the subject parcel. Single family residences are located across 5' Street to the south. I64 is located to the north, with the off -ramp to the north/northeast. Visibility The development fronts two Entrance Corridors —164 and 5t' Street Extended. The development is expected to be visible from both corridors, but existing wooded area to remain along the I64 corridor will limit some views. In the winter, intermittent views are available from 5t' Street to I64, and from I64 to 5t' Street. ARB Meeting Date January 21, 2016 Staff Contact Margaret Maliszewski PROJECT HISTORY March 16, 2015: ARB review of the Initial Site Plan, including architecture. July 20, 2015: ARB review of the Final Site Plan, including architecture (See Attachment A for the action letter from this meeting. Comments from this meeting are also included in the analysis section of this report.) November 16, 2015: Work session to review site sections, building profiles, topography, perspective views, and Building 5 elevations. (Comments from this work session are included in the analysis section of this report.) ANALYSIS REF GUIDELINE COMMENTS FROM ISSUE RECOMMENDATION THE 7/20/15 REVIEW and the 11/16/15 WORK SESSION Structure design 1 The goal of the regulation of the design of development 14.Provide site sections New perspective views have not been submitted, but site None. within the designated Entrance Corridors is to insure that showing the building profiles sections have been provided to describe the relationships new development within the corridors reflects the and topography at each between the apartment buildings and the topographic traditional architecture of the area. Therefore, it is the condition around the perimeter conditions around the site. Views from both ECs are down purpose of ARB review and of these Guidelines, that of the site that fronts on an into the site. Eye level is even with the club house roof and proposed development within the designated Entrance Entrance Corridor. Perspective upper stories of the apartment buildings. Trees will Corridors reflect elements of design characteristic of the views should be provided in eventually soften these views. The club house is situated significant historical landmarks, buildings, and structures order to more accurately closest to the EC at approximately 70' from the edge of of the Charlottesville and Albemarle area, and to promote describe the relationship of the pavement. Building 3 at the I64 off ramp is approximately orderly and attractive development within these corridors. buildings and landscape to the 110' to the edge of pavement. Applicants should note that replication of historic structures EC. is neither required nor desired. Building 5 elevations were discussed at the November 16, 2015 work session. At the time, there was confusion about 2 Visitors to the significant historical sites in the Charlottesville and Albemarle area experience these sites 15.Reconsider elevations of what changes, if any, had been made to the design. Building as ensembles of buildings, land, and vegetation. In order Building 5 to be more in 5 (building type 4) has been revised to include arched trim, to accomplish the integration of buildings, land, and keeping with the earlier color alternate roof forms, and reorganized towers. The level of vegetation characteristic of these sites, the Guidelines rendering presented at the detail appears to be consistent with the other buildings require attention to four primary factors: compatibility previous meeting. All building proposed in the development and with other approved with significant historic sites in the area; the character of elevations fronting on the EC designs in the ECs. The building generally appears the Entrance Corridor; site development and layout; and require the same appropriate appropriate for the EC. landscaping. level of detail. 3 New structures and substantial additions to existing structures should respect the traditions of the architecture 17.Revised drawings of historically significant buildings in the Charlottesville addressing #s 14 and 15 may and Albemarle area. Photographs of historic buildings in return for a work session. the area, as well as drawings of architectural features, which provide important examples of this tradition are WS: Include a list of changes contained in Appendix A. that were made to the architectural elevations that 4 The examples contained in Appendix A should be used as a guide for building design: the standard of compatibility were displayed at the with the area's historic structures is not intended to November 16 meeting. impose a rigid design solution for new development. Replication of the design of the important historic sites in the area is neither intended nor desired. The Guideline's standard of compatibility can be met through building scale, materials, and forms which may be embodied in architecture which is contemporary as well as traditional. The Guidelines allow individuality in design to accommodate varying tastes as well as special functional requirements. 9 Building forms and features, including roofs, windows, doors, materials, colors and textures should be compatible with the forms and features of the significant historic buildings in the area, exemplified by (but not limited to) the buildings described in Appendix A [of the design guidelines]. The standard of compatibility can be met through scale, materials, and forms which may be embodied in architecture which is contemporary as well as traditional. The replication of important historic sites in Albemarle County is not the objective of these guidelines. 11 The overall design of buildings should have human scale. Scale should be integral to the building and site design. 13 Any appearance of "blankness" resulting from building design should be relieved using design detail or vegetation, or both. 5 It is also an important objective of the Guidelines to None. The form, materials and detailing of the proposed apartment None. establish a pattern of compatible architectural buildings are compatible with those of the apartment characteristics throughout the Entrance Corridor in order complex to the west. The materials are also compatible with to achieve unity and coherence. Building designs should the single family residences in the area. The Building 5 demonstrate sensitivity to other nearby structures within elevations are consistent with the other proposed buildings the Entrance Corridor. Where a designated corridor is in the development. substantially developed, these Guidelines require striking a careful balance between harmonizing new development with the existing character of the corridor and achieving compatibility with the significant historic sites in the area. 10 Buildings should relate to their site and the surrounding context of buildings. 12 Architecture proposed within the Entrance Corridor should use forms, shapes, scale, and materials to create a cohesive whole. 14 Arcades, colonnades, or other architectural connecting None. The proposed buildings are not physically connected but are None. devices should be used to unify groups of buildings within visually connected through the use of similar forms, a development. materials, and design details. 15 Trademark buildings and related features should be None. Buildings may have been constructed according to the None. modified to meet the requirements of the Guidelines. proposed designs in other locations, but the buildings are not expected to have the appearance of trademark designs. 16 Window glass in the Entrance Corridors should not be None. The window glass note has been added to the architectural None. highly tinted or highly reflective. Window glass in the drawings. Entrance Corridors should meet the following criteria: Visible light transmittance (VLT) shall not drop below 40 %. Visible light reflectance (VLR) shall not exceed 30 %. Specifications on the proposed window glass should be submitted with the application forfinal review. Accessory structures and equipment 17 Accessory structures and equipment should be integrated l .Note the height of the Mechanical units are located at the base of each building, Revise the plant schedule to into the overall plan of development and shall, to the mechanical equipment located surrounded by an evergreen hedge. Equipment height is 4'. identify the planting height extent possible, be compatible with the building designs at each building. Revise the A note on the color elevations says that plants are meant to of screening shrubs, not the used on the site. landscape plan and schedule to identify the screening plants completely screen the mechanical equipment. Proposed screening shrubs include yew and cherry laurel, with container size. Planting height of shrubs intended to 18 The following should be located to eliminate visibility from the Entrance Corridor street. If, after appropriate siting, proposed for the equipment. planting size identified as 3 gallons. The mature height of screen equipment visible these features will still have a negative visual impact on the Ensure that the plants will the screening shrubs ranges from 3' to 6'. Consequently, the from the EC should be 4' Entrance Corridor street, screening should be provided to fully screen the equipment equipment is not likely to be fully screened at planting, and minimum. Revise plant eliminate visibility. a. Loading areas, b. Service areas, c. from view. possibly may not be fully screened at maturity. choices accordingly. Refuse areas, d. Storage areas, e. Mechanical equipment, f. Above - ground utilities, and g. Chain link fence, barbed 16.Applicant has indicated that Chain link fence is proposed around the pool and the back of Replace chain link fence wire, razor wire, and similar security fencing devices. satellite dishes will not be allowed on the building. the club house. The chain link may be visible from the 5t' Street EC. Chain link is also proposed around the tot lot with a more decorative fence in locations visible 19 Screening devices should be compatible with the design of the buildings and surrounding natural vegetation and may located between Buildings 3 and 4. This fence would be from the ECs. Identify the consist of: a. Walls, b. Plantings, and c. Fencing. visible from the 5t1i Street EC. A chain link fence detail is fence on the plan and provided on C -02, as are details for guard rail and a provide a fence detail in the decorative fence. plan. 21 The following note should be added to the site plan and the 2.Add the standard mechanical The note has been added to L1.03 and Al -00. None. architectural plan: "Visibility of all mechanical equipment equipment note to both the from the Entrance Corridor shall be eliminated." architectural and site plans. Lighting 22 Light should be contained on the site and not spill over None. Spillover does not exceed .5 fc. None. onto adjacent properties or streets; 23 Light should be shielded, recessed or flush - mounted to 3.If exterior building - mounted Wall- mounted sconce style building lights are proposed. None. eliminate glare. All fixtures with lamps emitting 3000 lights are proposed, include They are LED fixtures emitting 1000 lumens. lumens or more must be full cutoff fixtures. them in the lighting drawings. 24 Light levels exceeding 30 footcandles are not appropriate None. Light levels are not excessive. The maximum light level is None. for display lots in the Entrance Corridors. Lower light under 12.5 fc. levels will apply to most other uses in the Entrance Corridors. 25 Light should have the appearance of white light with a None. LED fixtures are proposed throughout the development. None. warm soft glow; however, a consistent appearance throughout a site or development is required. Consequently, if existing lamps that emit non -white light are to remain, new lamps may be required to match them. 26 Dark brown, dark bronze, or black are appropriate colors None. Bronze poles and fixtures are proposed. None. for free - standing pole mounted light fixtures in the Entrance Corridors. 27 The height and scale of freestanding, pole- mounted light None. The pole detail shows a 16' pole on a 3.5' base. None. fixtures should be compatible with the height and scale of the buildings and the sites they are illuminating, and with the use of the site. Typically, the height of freestanding pole - mounted light fixtures in the Entrance Corridors should not exceed 20 feet, including the base. Fixtures that exceed 20 feet in height will typically require additional screening to achieve an appropriate appearance from the Entrance Corridor. 28 In determining the appropriateness of lighting fixtures for None. The proposed fixtures appear appropriate for the site. None. the Entrance Corridors, the individual context of the site will be taken into consideration on a case by case basis. 29 The following note should be included on the lighting None. The note is on the plan. None. plan: "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle." Guidelines for the Use of Decorative Landscape Lighting None. No decorative landscape lighting is proposed. None. Landscaping 7 The requirements of the Guidelines regarding landscaping 4.Provide the 20 scale 20 scale landscape plans have been provided. Overall site Shift the one UP located are intended to reflect the landscaping characteristic of landscape plans to cover the planting and landscaping at each building is detailed. along the 5t' Street frontage many of the area's significant historic sites which is entire development. Be sure all in the vicinity of Buildings characterized by large shade trees and lawns. Landscaping utilities and easements are Most utility conflicts have been resolved. One UP along the 3 and 4 to avoid the water should promote visual order within the Entrance Corridor shown on the landscape plan. 5' Street frontage in the vicinity of Buildings 3 and 4 is in line easement. and help to integrate buildings into the existing the water line easement. Two BN at the north end of the environment of the corridor. 5.Check and correct the quantity of CK and PL in the parking island located between Buildings 2 and 3 look too close to the storm pipe. One JV at the east end of the Shift the two BN at the north end of the parking 8 Continuity within the Entrance Corridor should be obtained by planting different types of plant materials that plant schedule and on the plan. staggered row located south of Building 4 is located on top island located between share similar characteristics. Such common elements of a storm pipe. Buildings 2 and 3 to allow for more flexibility in the design of structures 6.Clarify the reason for the maintain 2' from the storm because common landscape features will help to off -site CK located at the west Plant quantities in the schedule appear to be accurate. pipe. harmonize the appearance of development as seen from end of the 5' Street frontage. the street upon which the Corridor is centered. Off -site grading and planting require easements. The off -site tree issue has been resolved. Shift the one JV at the east end of the staggered row 32 Landscaping along the frontage of Entrance Corridor streets should include the following: Two trees have been added along 5' Street near the area located south of Building 4 a. Large shade trees should be planted parallel to the 7.Shift utilities to eliminate between Buildings 3 and 4. The row now appears more to maintain 2' from the Entrance Corridor Street. Such trees should be at least 3'/2 conflicts between landscaping consistent. storm pipe. inches caliper (measured 6 inches above the ground) and and utilities /easements without should be of a plant species common to the area. Such reducing the quantity of The slopes down to the apartment buildings from the ECs trees should be located at least every 35 feet on center. proposed plants. face away from the EC streets and are to be seeded with a b. Flowering ornamental trees of a species common to the native warm season grass mix. With the proposed EC area should be interspersed among the trees required by the 8.Add a large shade tree to fill frontage trees, this treatment is expected to have an preceding paragraph. The ornamental trees need not the gap in street trees between appropriate appearance. alternate one for one with the large shade trees. They may be buildings 3 and 4, or clarify planted among the large shade trees in a less regular spacing why the gap is required. pattern. c. In situations where appropriate, a three or four board 9.Indicate how the landscape fence or low stone wall, typical of the area, should align on the slope down to buildings the frontage of the Entrance Corridor street. 3, 4 and 5 from the EC will be d. An area of sufficient width to accommodate the handled. foregoing plantings and fencing should be reserved parallel to the Entrance Corridor street, and exclusive of road right-of-way and utility easements. 33 Landscaping along interior roads: 7.Shift utilities to eliminate The tree /utility conflict at the northern end of the entrance None. a. Large trees should be planted parallel to all interior conflicts between landscaping drive has been resolved. roads. Such trees should be at least 2%2 inches caliper and utilities /easements without (measured six inches above the ground) and should be of a reducing the quantity of plant species common to the area. Such trees should be proposed plants. located at least every 40 feet on center. 34 Landscaping along interior pedestrian ways: None. Most sidewalks in the development run along the parking None. a. Medium trees should be planted parallel to all interior lots, where perimeter trees are provided. A few sidewalks pedestrian ways. Such trees should be at least 2'/2 inches run along buildings where trees are not provided, but there caliper (measured six inches above the ground) and should are sufficient trees elsewhere on site to compensate. be of a species common to the area. Such trees should be located at least every 25 feet on center. 35 Landscaping of parking areas: 7.Shift utilities to eliminate See #7, 8 and 32. See #7, 8 and 32. a. Large trees should align the perimeter of parking areas, conflicts between landscaping located 40 feet on center. Trees should be planted in the and utilities /easements without interior of parking areas at the rate of one tree for every 10 reducing the quantity of parking spaces provided and should be evenly distributed proposed plants. throughout the interior of the parking area. b. Trees required by the preceding paragraph should measure 2'/2 inches caliper (measured six inches above the ground); should be evenly spaced; and should be of a species common to the area. Such trees should be planted in planters or medians sufficiently large to maintain the health of the tree and shall be protected by curbing. c. Shrubs should be provided as necessary to minimize the parking area's impact on Entrance Corridor streets. Shrubs should measure 24 inches in height. 36 Landscaping of buildings and other structures: 1.Note the height of the See #17 -19, above. See #17 -19, above. a. Trees or other vegetation should be planted along the mechanical equipment located front of long buildings as necessary to soften the at each building. Revise the appearance of exterior walls. The spacing, size, and type landscape plan and schedule to of such trees or vegetation should be determined by the identify the screening plants length, height, and blankness of such walls. proposed for the equipment. b. Shrubs should be used to integrate the site, buildings, Ensure that the plants will and other structures; dumpsters, accessory buildings and fully screen the equipment structures; "drive thru" windows; service areas; and signs. from view. Shrubs should measure at least 24 inches in height. 37 Plant species: a. Plant species required should be as None. The plants are in the various lists, except for the vitex None. approved by the Staff based upon but not limited to the agnus - castus. This plant is not native, but only four are Generic Landscape Plan Recommended Species List and proposed, so the impact is not expected to be significant. Native Plants for Virginia Landscapes (Appendix D). 38 Plant health: The following note should be added to the l O.Limit the number of The quantity of overall site shrubs meets the 25% rule. Add a few more shrub landscape plan: "All site plantings of trees and shrubs shall proposed plants for any one Some foundation shrubs do not, including the yew, cherry types to further diversify be allowed to reach, and be maintained at, mature height; species to 25% of the total laurel, and Gro -low sumac. Diversifying these selections the large numbers of yew, the topping of trees is prohibited. Shrubs and trees shall proposed for that plant type would better support the health of the overall landscape. cherry laurel, and Gro -low be pruned minimally and only to support the overall health (tree, shrub). sumac proposed as of the plant." foundation shrubs. Development paftern and site grading 6 Site development should be sensitive to the existing 11.Provide retaining wall A dry stack masonry unit retaining wall is proposed. A basic Identify on the plan the natural landscape and should contribute to the creation of details on the plans. retaining wall section has been provided on sheet C -02. manufacturer and color an organized development plan. This may be Manufacturer and color have not been identified. proposed for the retaining accomplished, to the extent practical, by preserving the 12.1dentify on the plan top -of- walls. trees and rolling terrain typical of the area; planting new wall and bottom -of -wall Top of wall and bottom of wall elevations are indicated for trees along streets and pedestrian ways and choosing elevations for the retaining retaining walls, but many have two top of wall heights and Correct top of wall and species that reflect native forest elements; insuring that walls. those in the vicinity of the clubhouse seem inaccurate. bottom of wall elevations any grading will blend into the surrounding topography for the retaining walls. thereby creating a continuous landscape; preserving, to the l O.Limit the number of extent practical, existing significant river and stream proposed plants for any one valleys which may be located on the site and integrating species to 25% of the total these features into the design of surrounding development; proposed for that plant type and limiting the building mass and height to a scale that (tree, shrub). does not overpower the natural settings of the site, or the Entrance Corridor. 39 The relationship of buildings and other structures to the Entrance Corridor street and to other development within the corridor should be as follows: a. An organized pattern of roads, service lanes, bike paths, and pedestrian walks should guide the layout of the site. b. In general, buildings fronting the Entrance Corridor street should be parallel to the street. Building groupings should be arranged to parallel the Entrance Corridor street. c. Provisions should be made for connections to adjacent pedestrian and vehicular circulation systems. d. Open spaces should be tied into surrounding areas to provide continuity within the Entrance Corridor. e. If significant natural features exist on the site (including creek valleys, steep slopes, significant trees or rock outcroppings), to the extent practical, then such natural features should be reflected in the site layout. If the provisions of Section 32.5.6.n of the Albemarle County Zoning Ordinance apply, then improvements required by that section should be located so as to maximize the use of existing features in screening such improvements from Entrance Corridor streets. f. The placement of structures on the site should respect existing views and vistas on and around the site. 40 Site grading should maintain the basic relationship of the site to surrounding conditions by limiting the use of retaining walls and by shaping the terrain through the use of smooth, rounded land forms that blend with the existing terrain. Steep cut or fill sections are generally unacceptable. Proposed contours on the grading plan shall be rounded with a ten foot minimum radius where they meet the adjacent condition. Final grading should achieve a natural, rather than engineered, appearance. Retaining walls 6 feet in height and taller, when necessary, shall be terraced and planted to blend with the landscape. 41 No grading, trenching, or tunneling should occur within the 13.Coordinate the tree save The tree save /grading conflict has been resolved by None. drip line of any trees or other existing features designated and grading shown south of eliminating the trees in question. for preservation in the final Certificate of Appropriateness. the clubhouse. Adequate tree protection fencing should be shown on, and coordinated throughout, the grading, landscaping and erosion and sediment control plans. 42 Areas designated for preservation in the final Certificate of Appropriateness should be clearly delineated and protected on the site prior to any grading activity on the site. This protection should remain in place until completion of the development of the site. 43 Preservation areas should be protected from storage or movement of heavy equipment within this area. 20 Surface runoff structures and detention ponds should be None. The development will use the stormwater facility that exists None. designed to fit into the natural topography to avoid the need at the west end of the property. for screening. When visible from the Entrance Corridor street, these features must be fully integrated into the landscape. They should not have the appearance of engineered features. 44 Natural drainage patterns (or to the extent required, new drainage patterns) should be incorporated into the finished site to the extent possible. Staff recommends the following as the primary points of discussion: 1. The appearance and level of detail of Building 5 2. Chain link fence proposed in the vicinity of the clubhouse and Buildings 3 and 4 3. Screening shrubs /mechanical equipment Staff recommends approval of a Certificate of Appropriateness, pending staff administrative approval of the following conditions: 1. Revise the plant schedule to identify the planting height of screening shrubs, not the container size. Planting height of shrubs intended to screen equipment visible from the EC.should be 4' minimum. 2. Replace chain link fence with a more decorative fence in locations visible from the ECs. Identify the fence on the plan and provide a fence detail in the plan. 3. Shift the one UP located along the 5t1i Street frontage in the vicinity of Buildings 3 and 4 to avoid the water line easement. 4. Shift the two BN at the north end of the parking island located between Buildings 2 and 3 to maintain 2' from the storm pipe. 5. Shift the one JV at the east end of the staggered row located south of Building 4 to maintain 2'from the storm pipe. 6. Add a few more shrub types to further diversify the large numbers of yew, cherry laurel, and Gro -low sumac proposed as foundation shrubs. 7. Identify on the plan the manufacturer and color proposed for the retaining walls. 8. Correct top of wall and bottom of wall elevations for the retaining walls. 10 TABLE A This report is based on the following submittal items: Sheet # Drawing Name Drawing Date Sheet # Drawing Name Drawing Date C -02 of 34 General Notes & Typical Details 7/31/2015 L3.03 Parking Lot Lighting Plan 12/7/15 C -02C of 34 Dumpster and Recycle Center 7/31/2015 L3.04 Lighting Cut Sheets 12/7/15 C -02C of 34 Dumpster and recycle Center 7/31/2015 Al -00 Architectural Site Plan 12/7/15 C -09A of 34 Grading and Drainage Plan 7/31/2015 Al -01 Building Type 1 — First Floor Plan 12/7/15 C -09B of 34 Grading and Drainage Plan 7/31/2015 Al -05 Building Type 3 — First Floor Plan 12/7/15 C -09C of 34 Grading and Drainage Plan 7/31/2015 Al -09 Building Type 3 — First Floor Plan 12/7/15 C -09D of 34 Grading and Drainage Plan 7/31/2015 Al -14 Building #5 — Type 4 LVL 1 Plan 12/7/15 L0.0 Site Context 12/7/15 A5 -01 Elev - Building Type 1 12/7/15 L1.01 Overall Planting Plan 12/7/15 A5 -02 Elevations — Building Type 2 (900 & 1100) 12/7/15 L1.02 Site Planting Plan 12/7/15 A5 -03A Elevations — Building Type 3 12/7/15 L1.03 Site Planting Plan 12/7/15 A5 -03B Elevations — Building Type 3 12/7/15 L1.04 Site Planting Plan 12/7/15 A5 -04A Elevations — Building Type 4 12/7/15 L1.05 Site Planting Plan 12/7/15 A5 -04B Elevations — Building Type 4 12/7/15 L1.06 Site Planting Plan 12/7/15 A5 -04C Elevations — Building Type 4 12/7/15 L1.07 Clubhouse Planting Plan 12/7/15 A5 -04D Elevations — Building Type 4 12/7/15 L1.08 Building 1 Planting Plan 12/7/15 A5 -05 Elevs — Bldg. Type 1 & 2 12/7/15 L1.09 Building 2 and Bioretention Planting Plan 12/7/15 EL -01 Building #1 — Type 3 — North Elevation (color) 12/7/15 L1.10 Building 3 Planting Plan 12/7/15 EL -02 Building #2 — type 2 — North Elevation (color) 12/7/15 L1.11 Building 4 Planting Plan 12/7/15 EL -03 Building #3 and 4 — Type 1 — Street Elevation (color) 12/7/15 L1.12 Building 5 Planting Plan 12/7/15 EL -04 Building #5 — Type 4 — Southwest Elevation (color) 12/7/15 L1.13 Building 5 Planting Plan 12/7/15 EL -05 Building #5 — Type 4 — South Elevation (color) 12/7/15 L2.01 Plant Schedule, Calculations, & Details 12/7/15 EL -06 Building #5 — Type 4 — Southeast Elevation (color) 12/7/15 L3.01 Overall Lighting Plan 12/7/15 L0.00 Site Context (color) 12/7/15 L3.02 Parking Lot Lighting Plan 12/7/15 11 ATTACHMENT A COUNTY OFALBEM.A.RLE Depai imea I of Comoro pity DeTelDpm Ent 4 D 131 1IMIXe Ru ed. NaTth Wmg CberIoItesvj0e.1jFZL11LB 1-li (134) 29d-8831 FBI (434) 4 12-1126 July22.2015 Michael M Cam pbelVDom iniom Realty Partners 109 N 5th Street, Suite B RichnnDnd Va23219 RE:ARB2015O.DH r;ft• St•eet Place Dear Mr. Ca') eb= . T h a Albe Y, zle --.- - n:p mrch :ect- f 9 R =v =t; 5o rd a: its ­ ae7in ; - n , j', 2 :. =1` cc r: le:ed re,, c�, - [:he above •o7ad - =qi 7o cc- =_:r.:: i- 17 If A Si I r sis I -; c' 2:: a - = r­e 1: 1 - Is I L d •;s "im h z -- =:, - t_ - M7a r :,*,. a Y - - t= _T 1- Boa•: o`e : 71- e •; - - r, i- e 17- `c-:he : ="e' 7 ` I -__app cam s next - . -1- 71 = 1. = lea -- - --:e 71)a7 71- e`.: :-t;ir g : - ­ r- e i7s as t- ose 71ha: - b- = r r 7if =d z: :h, i 7ii- C !,: is dial cc n r e Iss mays addE : -_ r slim I eta: ba me, on f. al- a ­E, s i, a i ang :c t- a pla -. 1. Note the •eig6t-f:henrecharioal equipnnenlloaa:e, Bleach build irp. Re jis,e the landsc=ape plan and E, I ed_ln7c screening plants proposed for the equipment. lEAsurelhatilreplants willfully 711- -:L :'1 =n: NDM VFeW. 2 -7ai:-J, Y-- ­.in ca e:uipii an: "ote !c :V• ts 9,-1-itact.ral 39 = 7e pia•s. I Ex 7a' :' :u I - g­1 - L Te its a — *fo: --< ed r olu, = : i = ­ •:r : t 7ir g d "g i 4. P--, --e I -e -0 scale p z-s 7c ao•ar the entire davalo:inaw. 311 LAit ss end are Jo.,i o- 711-_ z• -_ :lan. 5. ChE- Bi- -re,- 71h- _-i7: c=0, and PL in the plant schedule and on Ire plan. D. Gla-I.- - im ­s_-- :-- -1-e _­--i =-­ --a ted at the west end uF the 6' Street frontage. Dif-site gradin- a -d pa-I-; re.- ire ea==r­e--s. T. S11117. it III == --- e ri •3-- -r'liotm between Landscaping and uhli Jeasements without reducing the qj-rti.- :f : -op­—d3- :s S. Ad: E -rg- si--e tree to the gap in stri trees between buildings 3and 4, or clarify why the gap -­L =1 P. I rdica-e I) : •,. the landscape on the slope down to buildings 3. 4 and 5 from the EG will be handled. 10 L m : 1•m ru ii_n- ol pnapD5ed plants For anyone 5piecksto 25% of the total proposed For that plant t, = =_ 1 P-:,:erE73--gr;-Ildeia'son the pans. 3 Coo- ­iio z -1-e ueE save 3-: gra❑ rg cl-own soil -h _dlc L-e. P--, -e 31= =m--io­ sh- .,. -a the buildirg p,--r t-po,ra_-�y 37 m3oh --Ond' t-e p•ire-e- --f 1-e sii= I ^at r•onts on an Err-ia•,­ Co _-c- : =-5pec7P;= -.0 c oe 'Ed in d­^_- be t•a ip c s :L I -n, 'e EC Feo­ :0 :e T"a - :C-� -2 ev-.ton�o- __ild-� Z 171­eez, =,-: :,rand=­: pcee-7edz7 inaedrig.Allbu d-:a . 15 --plkBm has indicated That satellite dishes will no: be all"E- on the building 17 P evisad drawings addressing k 14 and 15 may return for a work sesaaon. You may submit your application for conlin. ad ARE] ffiVieW at Your earliest convenience. Application forrins, checklists and schedules are available on-1 i= -t wwwalbemarle.orgiARD. Rsv:Ee' d-aVirgs ad: reEsing t-e oommanu ad a:ce z­ requ:­'. include u:dated AR revi=:c" '3tsE on =-.011 p a ­e T.: I . ri j:irg :e7a rd :a:-: ):­ a 9�) -I- T­ I Fqs -Een add- aces:, .1-coangem :,L-ai dhar trose have _ ae- rad=. zarlfy L-_=a -_ iaryes it Lia ri air o a So. HUhlignting the cnange5 in the draviing Ymh 'cloud in g' or Dy ctner mean E will fac_ilitatE . -_w.siv and app rova I. IF you have any questions concerning any of the above, please FEEA free to call me. Sincerely. li Vlaliszewski Pdnc*al Planner Cc: Gambit LLC & Snow Pam LLC Po Box W4a Charlottesville Va 22905 File 12