HomeMy WebLinkAboutSDP201400066 Correspondence 2014-10-24 f r✓ `r..„ SHIMP PROJECT MANAGEMENT CIVIL ENGINEERING LAND PLANNING ENGINEERING October 24, 2014 Ms. Megan Yaniglos Regarding: SDP 2014-00066—University of Virginia Employees Credit Union Minor Site Plan Amendment Dear Ms. Yaniglos, I have attached 5 copies of the revised Minor Site Plan Amendment addressing your comments dated October 9, 2014. They also include engineering comments dated 10/23/14. The specific changes are outlined below. Planning Comments: 1. The existing shrubs along the right of way of Berkmar Drive are now shown along with 10 new shrubs of the same species planted at the required spacing. We also made sure not to have any shrubs planted overtop of the water service line connections. 2. Landscaping calculations identifying what is required and what is proposed is now shown on sheet C4.A new area is now shown on sheet C2 identifying the total area of the amendment which is separate from the total area of disturbance.All landscaping requirements shown are based on the total amendment area shown on sheet C2. 3. Tree canopy calculations are now shown on sheet C4.The required canopy is based on the total amendment area which is shown on sheet C2. 4. All proposed parking lot shade trees are within the total amendment area shown on sheet C2. Due to the location of existing underground utilities there are limited areas suitable for planting. 3 trees are proposed to meet the requirement based on the 21 new parking spaces. These trees are to replace the ones that are to be removed. Engineering Comments: 1. CG-6 is now provided on the low side of the parking lot as requested. A note has been provided detailing that the CG-6 at the downhill ingress/egress is to be reversed to allow water to flow across the travelway into existing storm inlet X1. 2. Storm sewer calculations and a drainage area detail are now shown on sheet C5 as details 6, 7, &8. If you have any questions please do not hesitate to contact me at your earliest opportunity at chris @shimp- engineering.com. Justin Shimp, P.E. may be reached at:justin @ shimp-engineering.com or by phone at 434-207-8086. Best Regards, al A Chris Norvelle Shimp Engineering, P.C. M✓ � SHIMP PROJECT MANAGEMENT CIVIL ENGINEERING LAND PLANNING ENGINEERING November 24, 2014 Ms. Michelle Roberge Regarding: SDP 2014.00066—University of Virginia Employees Credit Union Minor Site Plan Amendment Dear Ms. Roberge, I have attached 5 copies of the revised Minor Site Plan Amendment addressing your comments dated November 18, 2014. The specific changes are outlined below. Engineering Comments: 1. A new blow up detail has been added to sheet C4 as detail#1. This detail includes additional spot elevations depicting how the concrete shall be properly sloped to allow water to flow out of the gutter and across the road to inlet X1. 2. Per the conversation between you and Justin Shimp we have left the proposed storm sewer pipes to be a diameter of 12"to match the existing 12" RCP that runs down the proposed parking lot. The storm sewer calculations remain unchanged on sheet C5. 3. The VDOT standard MH-1 detail is now shown on sheet C5. Planning Comments: - No further comments If you have any questions please do not hesitate to contact me at your earliest opportunity at chris @shimp- engineering.com. Justin Shimp, P.E. may be reached at:justin @shimp-engineering.com or by phone at 434-207-8086. Best Regards, (zil C ris Norvelle Shimp Engineering, P.C.