Loading...
HomeMy WebLinkAboutSDP201400046 Review Comments Major Amendment, Final Site Plan 2014-07-14 `time .y ,..90-,'t:.-,,, '.1 i■ I# COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper,Virginia 22701 Charles A. Kilpatrick,P.E. Commissioner July 14,2014 Mr.Christopher Perez Senior Planner County of Albemarle Department of Community Development 401 McIntire Road Charlottesville,VA 22902 Re: SDP-2014-00046 Christian Aid Mission-Major Site Plan Amendment Dear Mr.Perez: We have reviewed the major site plan amendment for Christian Aid Mission dated 6'9'14 and the AM-E spacing exception dated 6'20.14 as submitted by Shimp Engineering,P.C.and offer the following comments: 1. At least a 2'shoulder should be provided along Broomley Road in the vicinity of the proposed riprap, 2. Turn lane warrants need to be provided for the proposed entrance onto Broomley Road. 3. While it is not anticipated that turn lanes will be warranted for the proposed entrance,an entrance radius larger than 25'should be provided for the radius on the south side of the proposed entrance onto Broomley Road to aid vehicles in turning out of the travel lane of Broomley into the new entrance. 4. Sight lines need to be provided on the proposed plan. Sight distance should be provided such that a driver in the entrance can see vehicles in the right turn lane along Route 250 at the intersection with Broomley Road. Vegetation removal and grading may be necessary to achieve this sight distance. 5. The existing entrance onto Route 250 needs to be modified such that left turns cannot be made out of the entrance onto Route 250. It is likely that a raised concrete island and appropriate signage will be necessary for this entrance. AM-E Comments I. Broomley Road has a functional classification as a Rural Minor Collector rather than as a Local Road. The collector spacing from a signalized intersection to a full access entrance is required instead of the corner clearance requirement. The required spacing is 440 feet rather than 225 feet. 2. A traffic engineering study documenting that left turn movements will not have a negative impact on highway operation or safety was not included with the AM-E. If you need additional information concerning this project,please do not hesitate to contact me at(434)589-5871. Sincerely, Cli Troy Austin,P.E. Area Land Use Engineer Culpeper District WE KEEP VIRGINIA MOVING Christopher Perez From: Christopher Perez Sent: Thursday, October 23, 2014 8:44 AM To: 'Justin Shimp, P.E.' Subject: RE: SDP2014-46 Major Amendment -Christian Aid Mission Justin, SDP2014-46 Major Amendment - Christian Aid Mission The plans cannot be approved yet as Engineering has not approved the plans. I offer the following comments from Engineering on your latest submittal: "1) Signs should reference MUTCD standards R4-7, R3-2 and R1-1. They should not be combined on the same post. Hardware should be break away posts to VDOT standard." Please revise the plans to meet Glenn's comments or contact Glenn and discuss the item if you disagree. Keep me posted. Thanks 'hristolahe P. Perez Senior Planner Department of Community Development 1County of Albemarle.Virginia 401 McIntire Road Charlottesville.VA 22902 434.296.5832 ext.3443 From: Justin Shimp, P.E. [mailto:justinOshimp-engineering.com] Sent: Monday, October 20, 2014 8:54 AM To: Christopher Perez Subject: Re: SDP2014-46 Major Amendment - Christian Aid Mission Hi Chris, My mistake on that one, I hadn't sent the revisions in before i went on vacation and it slipped my mind when i returned. I dropped the plans off Friday afternoon. Thanks! Justin Shimp, P.E. 434-953-6116 On Oct 16, 2014, at 10:00 AM, Christopher Perez<cperez @albemarle.org>wrote: Courtney and Justin, SDP2014-46 Major Amendment- Christian Aid Mission 1