HomeMy WebLinkAboutSDP201400064 Review Comments 2014-10-07Short Review Comments Report for:
SDP201400064
SubApplication Type:
Free State Run - Initial
Initial Site Plan
Date Completed:10/07/2014
Reviewer:Johnathan Newberry Planning
Review Status:Requested Changes
Reviews Comments:
Division:
Date Completed:09/02/2014
Reviewer:Andrew Slack E911
Review Status:Requested Changes
Reviews Comments:The applicant should contact this department to submit three (3) road names for each 'Private Road
A' and 'Private Road B' for approval before the final plans are submitted.
Division:
Date Completed:09/03/2014
Reviewer:Jay Schlothauer Inspections
Review Status:No Objection
Reviews Comments:Based on plans dated August 25, 2014.
No comments or conditions.
Division:
Date Completed:10/07/2014
Reviewer:Robbie Gilmer Fire Rescue
Review Status:Requested Changes
Reviews Comments:Based on plans dated 8/25/14
1. Hydrant spacing shall be 500 ft per travelway.
2. Streets with parking on one side shall have one side marked "No Parking Fire Lane"
Division:
Date Completed:10/08/2014
Reviewer:Troy Austin VDOT
Review Status:Requested Changes
Reviews Comments:
Division:
Date Completed:10/14/2014
Reviewer:Alexander Morrison ACSA
Review Status:Requested Changes
Reviews Comments:•Show offsite water connection.
•Offsite easements may be required.
•Submit 3 copies of the final plan for construction review by the ACSA.
•Call out all fittings and line sizes.
•Show fire hydrants at 500' spacing on Free State Road and 400' spacing on Free State Court
and Private Road A.
•Show separate force mains for Lots 1-4.
•Investigate routing the force main closer to the preserved slopes area so they do not bisect
lots 5 and 6 and cross the domestic waterlines for these parcels.
•Include profiles for water and sewer.
I hereby recommend approval with the above stated requirements.
Alexander J. Morrison, EIT
Division:
Page:1of2 County of AlbemarlePrinted On:January 13, 2016
Civil Engineer
Date Completed:10/06/2014
Reviewer:Michelle Roberge Engineering
Review Status:Requested Changes
Reviews Comments:
Division:
Date Completed:01/07/2015
Reviewer:Johnathan Newberry Planning
Review Status:Administrative Approval
Reviews Comments:The applicant deferred action while sorting through many of the SRC issues.
On January 7th, Planning informed the applicant they could move forward to final site plan with
current design without revising their initial site plan.
Division:
Page:2of2 County of AlbemarlePrinted On:January 13, 2016