Loading...
HomeMy WebLinkAboutSDP201400020 Review Comments 2014-05-05Short Review Comments Report for: SDP201400020 SubApplication Type: Goodwill-Mill Creek Drive - Initial Initial Site Plan Date Completed:05/05/2014 Reviewer:Sarah Baldwin Planning Review Status:Approved Reviews Comments: Division: Date Completed:04/21/2014 Reviewer:Sarah Baldwin Planning Review Status:No Objection Reviews Comments:Plan is approved provided all reviewer comments are addressed. Division: Date Completed:03/11/2014 Reviewer:Max Greene Engineering Review Status:See Recommendations Reviews Comments:`No Objection to initial site plan submittal. `Erosion and Sediment Control Plan will be required for final site plan approval. Division: Date Completed:04/21/2014 Reviewer:Margaret Maliszewski ARB Review Status:Requested Changes Reviews Comments:•Regarding requirements to satisfy the design guidelines: As per § 32.4.2.2(b)(3) and 30.6.4(c)(2) and (3) and EC Guidelines #17 and 18, service areas and equipment are not sufficiently integrated into the development and visibility of service areas and equipment is not eliminated. •Regarding recommendations on the plan as it relates to the guidelines: None. •Regarding recommended conditions of initial plan approval: oA Certificate of Appropriateness is required prior to final site plan approval. oProvide additional landscaping on site, outside of utilities and easements, to help better integrate service areas and equipment into the corridor, and to eliminate visibility of service areas and equipment. •Regarding conditions to be satisfied prior to issuance of a grading permit: oRevise the plan to show accurate drip lines of all trees to remain. Maintain grading outside of the drip lines of trees to remain. oRevise the plan to show existing shrubs to remain along Avon Street and Mill Creek Drive. Division: Date Completed:03/07/2014 Reviewer:Andrew Slack E911 Review Status:Approved Reviews Comments:Approved. Division: Date Completed:03/12/2014 Reviewer:Jay Schlothauer Inspections Review Status:No Objection Reviews Comments:Based on plans dated February 21, 2014. No comments or conditions. Note: Due to the proximity of the east building wall to the property line, that wall must be of 1-hour firerated construction. Due to the proximity of a portion of the north building wall to the property line, Division: Page:1of2 County of AlbemarlePrinted On:January 13, 2016 that portion of the wall must be of 2-hour firerated construction. Date Completed:04/07/2014 Reviewer:Margaret Maliszewski ARB Review Status:Requested Changes Reviews Comments:ARB review has been deferred to April 21, 2014. Division: Date Completed:04/01/2014 Reviewer:Robbie Gilmer Fire Rescue Review Status:No Objection Reviews Comments:Based on plans 2/22/14 No Comments or Objections Division: Date Completed:08/06/2014 Reviewer:Robbie Gilmer Fire Rescue Review Status:See Recommendations Reviews Comments:Based on plans dated 7/11/14 1. Fire Flow test required prior to final approval. Fire flow requirements shall be 2250 gpm @20 psi without an approved sprinkler system. Fire flow requirements shall be 1500 gpm @20 psi with an approved sprinkler system. Division: Page:2of2 County of AlbemarlePrinted On:January 13, 2016 �cF A rap RGIN COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,Room 227 Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 April 22,2014 Kent O'Donahue Balzer and Associates, LLC. 1561 Commerce Road, Suite 401 Verona,VA. 24484 RE: SDP 201400020-Goodwill-Mill Creek Drive Dear Kent: The Site Review Committee has reviewed the development proposal referenced above. Preliminary comments for the following divisions of the Department of Community Development and other agencies, as applicable,are below: Albemarle County Division of Planning Services (Planner)— 1. No objection. Once comments from other reviewers are addressed the plan can be approved. Albemarle County Division of Zoning& Current Development(Engineer)— 1. See attached. Albemarle County Division of Planning(E911)— 1. Approved. Albemarle County Division of Planning(Architectural Review Board)— 1. See attached. Albemarle County Building Inspections- 1. No objection. Albemarle County Department of Fire Rescue- 1. No objection. Albemarle County Service Authority- 1. See attached. Virginia Department of Transportation- 1. No objection. See attached comments. Thomas Jefferson Soil and Water Conservation District- 1. See attached. Page 2 April 22, 2014 Comments reflect information available at the time the development proposal was reviewed,and should not be considered final. However,the Site Review Committee has attempted to identify all issues that will be required to be resolved prior to Final Site Plan approval.The Lead Reviewer will either approve with conditions or deny the Initial Site Plan within 15 days of the Site Review Meeting. Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, Sarah D. Baldwin Senior Planner