Loading...
HomeMy WebLinkAboutSDP201500001 Correspondence 2015-03-04 COLLINS Nw'' 200 GATT ST, SUITE K CHARLOTTESVILLE VA 22902 434.293.3719 PH 434.293.2813 FX www.collins-engineering.com March 4,2015 Christopher Perez Senior Planner Department of Community Development 401 McIntire Road Charlottesville,VA 22902 RE: SDP-2015-01-Charlottesville Catholic School-Minor Amendment Thank you for your comments dated February 13, 2015 on the above-referenced project. The updated plans reflect changes to address your comments as described below: Planning 1. 2nd entrance and the full frontage improvements will be constructed at the time of the High School addition. 2nd entrance has been shown as a part of Phase Ill on Sheet 2. 2. Parking calculations have been revised to match the plans. Approved parking requirements from SDP-1999-130 have been added to Sheet 1. 3. Proposed Phase III parking has been shown on Sheet 2. 4. Approved landscaping from SDP-1999-130 included with this plan set. 5. Limits of tree clearing and protective tree fencing shown on the landscaping plan. Conservation checklist has been included on the landscaping plan,Sheet 8. 6. No outdoor lighting is proposed with this site plan amendment. 7. Site plan number"SDP2015-00001" provided on Sheet 1. Zoning 1. Parking calculations corrected. Approved parking requirements from SDP-1999-130 have been added to Sheet 1. 2. Approved parking requirements from SDP-1999-130 shown on Sheet 1. 3. Comment acknowledged. 4. 2nd entrance and the full frontage improvements will be constructed at the time of the High School addition. 2nd entrance has been shown as a part of Phase III on Sheet 2. Engineering 1. CE relocated to parking lot area,shown on E&S plan. 2. Typical detail for transition from CG-7 to CG-6 shown on Sheet 6. 3. VDOT inlet shaping detail provided on Sheet 6. 4. Proposed pedestrian asphalt trailway has been revised to VDOT standard sidewalk. Label updated on Sheet 2;detail updated on Sheet 6. 5. Beginning and end points shown on all vertical curves. 6. Storm profiles, drainage areas,and calculations shown on Sheet 7. 7. Comment acknowledged. 8. E&S and SWM sheets removed from this set of plans and submitted as a VSMP application. 9. Comment no longer relevant to this site plan. 10. Comment no longer relevant to this site plan. 11. Comment no longer relevant to this site plan. Nomie Noe 12. Comment no longer relevant to this site plan. 13. Comment no longer relevant to this site plan. VDOT 1. No increased enrollment is proposed with this phase of the site plan (Phase II). 2nd entrance,frontage improvements, and construction of the high school shall be a part of Phase Ill. 2. Construction entrance relocated to the parking lot. No traffic shall enter or leave the site via Rio Road East. Should you have any questions, please feel free to contact me at 434-293-3719. Sincerely, Adam Long, PE Collins Engineering