Loading...
HomeMy WebLinkAboutSDP201500013 Correspondence 2015-04-22 1 ' Michael Baker Innovation Done Right...We Make a Difference INTERNATIONAL April 22,2015 Ms. Ellie Carter Ray,CLA Senior Planner Planning Division Department of Community Development County of Albemarle 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 RE: SDP-201500013 ACSA Admin&Operations Center—Minor Site Plan Amendment ACSA Project 2012-05 Dear Ms.Ray: The following responses to County comments, dated April 7, 2015, are provided. Comments are included and our responses are provided in bold text below comment. Comments by Ellie Carter Ray, Senior Planner,Planning Division,Dept. of Community Development 1. [Comment] This application is now being processed as a Minor Amendment; revise the cover sheet to replace `major' with `minor'. RESPONSE: The cover sheet has been revised to indicate a Minor Amendment. 2. [Comment] Provide a list of all proposed changes on the Cover Sheet. RESPONSE: A listing of proposed changes has been added to the cover sheet. 3. [32.5.2(a)] Add Entrance Corridor(EC)to the Zoning note. RESPONSE: Entrance Corridor (EC) has been added to the cover sheet following the Zoning District designation. 4. [32.5.2(a)] Add a note indicating the source of the topography and boundary information. RESPONSE: The source of the survey information is found on Sheet 2 as note 7. 5. [32.5.2(d)] This property includes several areas of Managed Steep Slopes. Show all steep slope areas and label accordingly. RESPONSE: The steep slopes have been shown as requested on Sheet 2A and 3. Please note that no steep slope areas are being affected by this project. 6. [32.5.2(i)] Label the access road to this site, indicate if it is public or private, and provide its right- of-way and pavement widths. RESPONSE: Access roads are private with 28' pavement widths. Requested information is shown on Sheet 2A. 272 Bendix Road,Suite 4001 Virginia Beach,VA 23452 Ima - Llf► KAMAN ,/sALLYPORT MBAKERINTL.COM Office:757.463.87701 Fax:757.463.0503 . Michael Baker INTERNATIONAL Ms.Ellie Carter Ray April 22,2015 Page 2 of 6 7. [32.5.2(j,k,1)] Verify that the location(s) and dimensions of all existing or proposed utilities and utility easements including water, sewer, drainage, telephone, cable, electric and gas are shown on the plan.Provide the Deed Book and Page reference for any existing easements. Any proposed easements should be labeled with the intended owner. RESPONSE: There are no proposed easements. Existing easements have been shown on Sheet 2A. 8. [32.5.2(n)] Clarify the location of, and dimension,the proposed fuel canopy on the site plan sheet. RESPONSE: Note 3 on Sheet 3 provides the dimension of the canopy. For clarity, a canopy outline is depicted on Sheet 5. 9. [32.5.2(n)] Dimension the access aisles around the proposed fuel pumps. RESPONSE: Access aisles are shown on Sheet 5. 10. [32.5.2(n)] Dimension the areas of demolished asphalt and concrete and the replacement areas, if different. RESPONSE: Pavement demolition and restoration areas area shown on Sheet 3. In addition, pavement restoration limits for pipe trenches and drop inlets are required per the details on Sheet 10(as referenced on Note 2 of Sheet 3). 11. [32.5.2(n) & 5.1.20(b)] All fuel storage tanks in excess of 600 gallons, and their associated loading areas, must be at least 100' from all property lines. Provide dimensions on the site plan sheet to verify that this requirement is satisfied. RESPONSE: The dimension for the closest property line to the proposed tanks is shown on Sheet 3. 12. [32.6.2(k) & 4.17] Clarify which fixtures shown on the lighting plan are existing and which are proposed. RESPONSE: All existing fixtures on the site are being replaced (See Note 1 on Sheet EL 1). New fixtures are identified by Note 3 of Sheet EL 1. 13. [32.6.2(k) & 4.17] For all proposed fixtures, provide a luminaire schedule listing the number of each fixture proposed along with the manufacturer's catalog number. The cutsheets must include manufacturer information and match the catalog number listed in the luminaire schedule. RESPONSE: Lighting details have been removed and a lighting fixture schedule has been provided with quantity of fixtures,and manufacturer's model numbers as well as manufacturer cutsheets corresponding to the model number on the schedule. See Sheet2 and EL3. 14. [32.6.2(k)&4.17] Verify that the photometric plan includes all existing and proposed lighting. RESPONSE: All existing fixtures are being replaced with new fixtures. Therefore all lighting on the site is included in the calculations.Notes added to the drawings to clarify(see Sheet EL1). Michael Baker INTERNATIONAL Ms. Ellie Carter Ray April 22,2015 Page 3 of 6 15. [Comment] This amendment cannot be approved until VDOT completes their review and grants their approval; comments will be forwarded upon receipt. ACSA, Fire/Rescue, and Inspections have reviewed the plan and have no objection. Engineering and ARB comments have been provided. RESPONSE: Acknowledged. Comments from John Anderson,Albemarle County Engineering 1. Estimated area to be disturbed =0.1 Ac; or 4,356 SF, approx. (sheetl 1; Existing site conditions Note). Project is exempt from the VSMP (17-303.D.), is not subject to the VESCP (17-300.A.) since disturbance <10,000 SF. Alb. Co. Engineering will not review ESC measures, inspect ESC measures, issue a VSMP, or schedule pre-construction since project is not subject to VESCP and is exempt from VSMP requirements. Comments below relate to site plan amendment. RESPONSE: Acknowledged. Please note that Planning Division is processing the application as a Minor Amendment. 2. Sheet 2A: Furnish Ex. Str. 6 storm sewer (MH?) data. Show outfall pipe leading away from structure; include DIA of outfall pipe, if known. RESPONSE: Information has been added to Sheet 2A as requested. 3. Sheet 2A: Above ground fuel tanks near timber retaining wall an. existing shed do not appear on sheet 3. Clarify for consistency. RESPONSE: Please note the label for above ground fuel tanks was in reference to the base fuel tanks built into the generators. The labels on sheets 2A and 3 have been modified to reflect the diesel generators with base fuel tanks. 4. Sheet 3: New drop inlet and drain valve(normally Open) -Add reference to detail on sheet 10. RESPONSE: Information is shown on Sheet 5 in lieu of Sheet 3 for clarity. 5. Sheet 3, 6: Show pavement replacement for new 4".PVC from wash area. RESPONSE: Trench detail on Sheet 10 has been revised to clarify pavement requirements. Pavement replacement areas for new 4"and 12" pipes are shown on Sheets 3 and 6. 6. Sheet 4: Notes 1 & 3: -Alb. County encourages Applicant to coordinate existing petroleum storage tank removal/site closure requirements with Mike Asma, DEQ, Valley Regional Office, 540.574-7803. RESPONSE: Acknowledged. 7. Sheet 5: Recommend note re. depth of cover over new 4,000 and 3,000 gal underground fuel storage tanks: 4.3.3.2.2 Underground tanks shall be covered with not less than 600 mm (24in.) of earth, or with not less than 300 mm(12 in.)of earth on top of which shall be placed a slab of reinforced concrete not less than 100 mm (4 in.)thick. Where the tanks are, or are likely to be subjected to Michael Baker INTERNATIONAL Ms. Ellie Carter Ray April 22,2015 Page 4 of 6 traffic,they shall be protected against damage from vehicles passing over them 900 mm(36 in.) of earth cover,or 450 mm(18 in.)of well-tamped earth plus either 150 mm(6 in.)of reinforced concrete or 200 mm (8 in.) of asphaltic concrete. When asphaltic or reinforced concrete paving is used as part of the protection, it shall extend at least 300 mm (12 in.) horizontal beyond the outline of the tank in all directions. RESPONSE: The tanks are provided with a 10" thick reinforce concrete slab. A note has been added to Sheet 5 to require the top of the tanks to be placed a minimum of 15 inches below the bottom of the concrete slab.This requirement provides 25 inches of total depth. 8. Sheet 5: Label new bollards. RESPONSE: The new bollards have been labeled on Sheet 5. 9. Sheet 5: Extend leader line to containment valve at new 4'X 4'precast drop inlet. RESPONSE: The leader line has been revised to extend to the valve on Sheet 5. 10. Recommend that 113-ft,12" DIA line "A" be revised to 15" DIA (ref ACDSM, 6.A.1.d.1). 15" is default minimum pipe DIA for use with standard VDOT storm system drop inlets, VDOT Dl-1, for example. Link: http://www.albemarle;org/upload/images/forms enter/departments/community development/forms/design standards manual/Albemarle County Design Standards Manual 02Dec2014.pdf. RESPONSE: It is recognized that under normal storm water design criteria that the minimum desirable diameter is 15". The new line "A" will only collect a small area of the parking lot that was previously sheet drained. The new line is designed to be 12" diameter in order to facilitate the connection of the piping associated with the fuel pad and canopy. Please note that Drain "C"is connecting to an existing 12" pipe. 11. Recommend New 4" PVC 118'line@ 0.37%be revised to 0.5%Min. (0.5 -16%, acceptable). RESPONSE: In order to connect to the existing sewer, the new drain line must be installed at 0.37% as shown. 12. Sheet 7: Identify(storm inlet) Str. 7 inlet type. Identify pipe DIA downstream of inlet 7. RESPONSE: Structure 7 is an existing structure(specifications unknown).The downstream diameter has been shown. 13. Sheet 9: Concrete box#4 does not fully drain, which may cause nuisance. It appears that existing downstream Elev. affects design. Recommend Alt. design to ensure wash area catchment (concrete box) empties fully, without held storage, There is less than 03' of space between top of 4" PVC drain line and the lower side of the concrete box lid, which may complicate connection between line and box. RESPONSE: The intent of the design is for the structure not to fully drain in order to serve as a settling basin and collect sand and grit. The structure will be periodically cleaned of debris and sediment. Michael Baker INTERNATIONAL Ms.Ellie Carter Ray April 22,2015 Page 5 of 6 Comments from ARB -Margaret Maliszewski 1. Supplemental information in your application suggests that the proposed color of the canopy fascia is white. White is an approvable color. Please identify the color of the fascia on the drawings. RESPONSE: The plans have been revised to indicate the color white for the canopy fascia. (See Sheet 4 of ARB submittal and Sheet 12 of Site Plan submittal.) 2. Illumination levels under the fuel pump canopy reach 29.2 fc; however, the Architectural Review Board regularly limits this type of illumination to a maximum of 20 fc. RESPONSE: Lumen output of fixtures reduced to reduce the maximum FC level under the canopy to 18.7fc(Sheet EL1). 3. Please confirm that the light levels shown beyond the canopy footprint account for any illumination from canopy lights that may"spill"beyond the canopy footprint. RESPONSE: Light levels shown beyond the canopy include the canopy lights. Note added to the drawings to clarify. 4. The word "initial" is missing from the lighting note on Sheet EL1. The note should read: "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be...." RESPONSE: Sheet EL-1 has been revised to indicate the proper wording in the note. 5. Clarify the abbreviation"BCM"used on Sheet 4. RESPONSE: The plans have been revised to include the abbreviation PECM = Pre- Engineered Canopy Manufacturer in lieu of BCM. (See Sheet 4 of ARB submittal and Sheet 12 of Site Plan submittal.) Comments from Fire and Rescue-Robbie Gilmer No comments or conditions. Response: Acknowledged Comments from ACSA—Alex Morrison No comment. Response: Acknowledged Comments from Building Inspections-Jay Schlothauer No comments or conditions. Response: Acknowledged Comments from VDOT No comments or conditions. Response: Acknowledged Michael Baker INTERNATIONAL Ms.Ellie Carter Ray April 22,2015 Page 6 of 6 Thank you for assistance in this project. If you have any questions or require additional information, please do hesitate to contact me. Sincerely, MICHAEL BAKER JR. INC. /(//4/7 ip Votava,P.E. Project Manager CFV/rfg Michael Baker Innovation Done Right...We Make a Difference INTERNATIONAL June 3,2015 Ms. Ellie Carter Ray, CLA Senior Planner Planning Division Department of Community Development County of Albemarle 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 RE: SDP-201500013 ACSA Admin&Operations Center—Minor Site Plan Amendment ACSA Project 2012-05 Dear Ms. Ray: The following responses to County comments, dated April 7, 2015, revised May 6, 2015, are provided. Comments are included and our responses are provided in bold text below comment. Comments by Ellie Carter Ray, Senior Planner, Planning Division, Dept. of Community Development 1. [Comment] This application is now being processed as a Minor Amendment; revise the cover sheet to replace `major' with `minor'. Rev 1: Comment not fully addressed. Replace "SDP201500013" (the current application) with "SDP199300001"(the site plan that's being amended) in the title. RESPONSE: Revision made to replace "SDP201500013" (the current application) with "SDP199300001" (the site plan that's being amended)in the title. 2. [Comment] Provide a list of all proposed changes on the Cover Sheet. Revl: Comment addressed. 3. [32.5.2(a)] Add Entrance Corridor(EC)to the Zoning note. Revl: Comment addressed. 4. [32.5.2(a)] Add a note indicating the source of the topography and boundary information. Revl: Comment addressed. 5. [32.5.2(d)] This property includes several areas of Managed Steep Slopes. Show all steep slope areas and label accordingly. Revl: Comment addressed. 6. [32.5.2(i)] Label the access road to this site, indicate if it is public or private, and provide its right-of- way and pavement widths. Revl: Comment addressed. 7. [32.5.2(j,k,l)] Verify that the location(s) and dimensions of all existing or proposed utilities and utility easements including water, sewer, drainage, telephone, cable, electric and gas are shown on the plan. Provide the Deed Book and Page reference for any existing easements. Any proposed easements 272 Bendix Road,Suite 400 Virginia Beach,VA 23452 Tr. Ima - IPA KAMAN ffSALLYPORT MBAKERINTL.COM Office:757.463.8770 I Fax:757.463.0503 Michael Baker INTERNATIONAL Ms.Ellie Carter Ray June 3,2015 Page 2 of 3 should be labeled with the intended owner. Revl: Comment addressed. 8. [32.5.2(n)] Clarify the location of, and dimension,the proposed fuel canopy on the site plan sheet. Revl: Comment addressed. 9. [32.5.2(n)] Dimension the access aisles around the proposed fuel pumps. Revl: Comment addressed. 10. [32.5.2(n)] Dimension the areas of demolished asphalt and concrete and the replacement areas, if different. Revl: Comment addressed. 11. [32.5.2(n) & 5.1.20(b)] All fuel storage tanks in excess of 600 gallons, and their associated loading areas, must be at least 100' from all property lines. Provide dimensions on the site plan sheet to verify that this requirement is satisfied. Revl: Comment addressed. 12. [32.6.2(k) & 4.17] Clarify which fixtures shown on the lighting plan are existing and which are proposed. Revl: Comment addressed. 13. [32.6.2(k) & 4.17] For all proposed fixtures, provide a luminaire schedule listing the number of each fixture proposed along with the manufacturer's catalog number. The cutsheets must include manufacturer information and match the catalog number listed in the luminaire schedule. Revl: Comment not fully addressed. The fixture count provided for fixture A4 in the luminaire schedule appears to be incorrect; the schedule lists 8 but there are 9 shown on the plan, please verify and revise. RESPONSE: Fixture count updated to 9 on Sheet EL-3. The Model# for fixture B is inconsistent between the cut-sheet and the luminaire schedule; the model #s must match. RESPONSE: Detail updated to reflect"WHT"color to match fixture schedule on Sheet EL-2. Two wall-mounted fixtures on the warehouse building are not clearly labeled; provide the appropriate label or indicate that the"D" label applies to more than one fixture, if that's the case. RESPONSE: Drawing updated to clarify both fixtures are type D on Sheet EL-1 14. [32.6.2(k) &4.17] Verify that the photometric plan includes all existing and proposed lighting. Revl: Comment addressed. 15. [Comment] This amendment cannot be approved until VDOT completes their review and grants their approval; comments will be forwarded upon receipt. ACSA, Fire/Rescue, and Inspections have reviewed the plan and have no objection. Engineering and ARB comments have been provided. Revl: Comment not fully addressed. This amendment cannot be approved until Engineering and ARB complete their reviews and grant their approval. Comments will be provided upon receipt. RESPONSE: Acknowledged; see below. Michael Baker INTERNATIONAL Ms. Ellie Carter Ray June 3,2015 Page 3 of 3 ARB comments were addressed on 5/13/15 as follows: The following responses to Albemarle County e-mail comments, dated May 6, 2015, are provided for your review. All comments are included in this response letter in italics and responses are provided in bold text. Comments: 1. The underside of the canopy is at 14'6", but the `B" canopy fixture is listed at 30' AFG in the Lighting Fixture Schedule on sheet EL3. Can you explain? RESPONSE: This is a typo. Fixture schedule was revised to reflect height of 14'6" AFG on Sheet EL-3. 2. The Lighting Fixture Schedule identifies the A2 and A4 fixtures at 30' AFG. The previous set of plans had a detail showing a 20' pole on a 3' base. Are new 30' poles proposed? RESPONSE: This is a typo.Fixture schedule was revised to reflect height of 23'-0"AFG on Sheet EL-3. The resubmittal form and one set of folded revised plan sheets (Cover sheet, EL-1, El-2 and EL-3) are included. Please note the Albemarle County Planning Division requested the cover sheet to be revised to replace "SDP201500013" (the current application) with "SDP199300001" (the site plan that's being amended) in the title. Changes were also requested to Sheets EL-1 and EL-2 by the Albemarle County Planning Division. Engineering had no comments per e-mail, dated 5/22/15. Thank you for assistance in this project. If you have any questions or require additional information, please do hesitate to contact me. Sincerely, MICHAEL BAKER JR. INC. 10, lor r/ Chip Votava, '.E. Project Manager CFV/rfg