Loading...
HomeMy WebLinkAboutSDP201500055 Calculations 2015-10-26 Nrow Now Virginia Runoff Reduction Method New Development Worksheet-v2.8 -June 2014 To be used w/2011 BMP Standards and Specifications Site Data Project Name:Sunset Overlook-Land Cover Area defined by Parcels Legal Limits Date: 10/26/15 . , 1 �2',2:/^� � ���`.:22,2 1 data input cells calculation cells constant values 1. Post-Development Project& Land Cover Information Constants { Annual nammn(mcheo) ^e^� ��`� Target Rainfall Event(inches) 1.00 Phosphorus EMC(mg/L) 026 Nitrogen EMC(mg/L) 1.86 Target Phosphorus Target Load(Ib/acre/yr) 0.41 Pi 0.90 Land Cover (acres) A soils B Soils C Soils D Soils Totals Forest/Open Space(acres)--undisturbed, ' protected forest/open space reforested land �.99 Managed Turf(acres) disturbed graded for yards or other turf to be mowed/managed ' $.08 Impervious Cover(acres) Total 10.40 Rv Coefficients xovn" ouvny cavoe ouons Forest/Open Space 0.02 0.03 0.04 0.05 Managed Turf 0.15 020 022 025 impervious Cover 0.85 0.95 0.85 0.95 Land Cover Summary Forest/Open Space Cover(acres) 1.89 we/ohmmnv(mreut) 0.03 %Forest 19% Managed Turf Cov r(acres) 6.08 wo/noumnv(turf) 0.20 %Managed Turf 58% Impervious Cover(acres) 2.33 Rv(impervious) 0.95 %/mnommu 22% Total Site Area acres 10.40 Site Rv 0.34 Post-Development Treatment Volume(acre-ft) 0.29 'ou ^evoonmon rea men 'oumo nu^/c feet) 12,666 po*_oovomnmvnt Load(Tp)(/mv,) 7.86 puoLoo,o/ovmont Load(Tw)(m/y, 56.9 Total Load(TP)Reduction Required(Ib/yr) 3.69 1 ' , Virginia Runoff Reduction Method Worksheet Virginia Runoff Reduction Method New Development Worksheet-v2.8-June 2014 Site Data Summary Total Rainfall=43 inches Site Land Cover Summary A Soils B Soils C Soils D Soils Total %of Total Forest(acres) 0.00 1.99 0.00 0.00 1.99 19.13 Turf(acres) 0.00 6.08 0.00 0.00 6.08 58.46 Impervious(acres) 0.00 2.33 0.00 0.00 2.33 22.40 10.40 100.00 Site Rv 0.34 Post Development Treatment Volume(ft3) 12666 Post Development TP Load(Ib/yr) 7.96 Post Development TN Load(Ib/yr) 56.93 Total TP Load Reduction Required(Ib/yr) 3.69 Total Runoff Volume Reduction(ft') 4408 Total TP Load Reduction Achieved(Ib/yr) 4 Total TN Load Reduction Achieved(Ib/yr) 49.47 Adjusted Post Development TP Load(Ib/yr) 4.15 Remaining Phosphorous Load Reduction(Lb/yr)Required 0.00 Drainage Area Summary D.A.A D.A.B D.A.C D.A.D D.A.E Total Forest(acres) 0.00 0.00 0.00 0.00 0.00 0.00 Turf(acres) 1.30 2.43 0.00 0.00 0.00 3.73 Impervious(acres) 1.45 0.96 0.00 0.00 0.00 2.41 6.14 Drainage Area Compliance Summary D.A.A D.A.B D.A.C D.A.D D.A.E Total TP Load Red.(Ib/yr) 2.05 1.75 0.00 0.00 0.00, 3.80 TN Load Red.(Ib/yr) 26.69 22.78 0.00 0.00 0.00 49.47 Summary Print e Virginia Runoff Reduction Method Worksheet Drainage Area A Summary Land Cover Summary A Soils B Soils C Soils D Soils Total %of Total Forest(acres) 0.00 0.00 0.00 0.00 0.00 0.00 Turf(acres) 0.00 1.30 0.00 0.00 1.30 47.27 Impervious(acres) 0.00 1.45 0.00 0.00 1.45 52.73 2.75 BMP Selections Practice Credit Area(acres) Downstream Practice 6.a.Bioretention#1 or Urban Bioretention(Spec#9) Impervious: I 1.45 Turf(Pervious): 1.3 Total Impervious Cover Treated(acres) 1.45 Total Turf Area Treated(acres) 1.30 Total TP Load Reduction Achieved in D.A.A(Ib/yr) 2.05 Total TN Load Reduction Achieved in D.A.A(Ib/yr) 26.69 Summary Print NOW Virginia Runoff Reduction Method Worksheet Drainage Area B Summary Land Cover Summary A Soils B Soils C Soils D Soils Total %of Total Forest(acres) 0.00 0.00 0.00 0.00 0.00 0.00 Turf(acres) 0.00 2.43 0.00 0.00 2.43 71.68 Impervious(acres) 0.00_ 0.96 0.00 0.00 0.96 28.32 3.39 BMP Selections Practice Credit Area(acres) Downstream Practice 6.a.Bioretention#1 or Urban Bioretention(Spec#9) Impervious: I 0.96 Turf(Pervious): 2.43 Total Impervious Cover Treated(acres) 0.96 Total Turf Area Treated(acres) 2.43 Total TP Load Reduction Achieved in D.A.A(Ib/yr) 1.75 Total TN Load Reduction Achieved in D.A.A(Ib/yr) 22.78 Summary Print