HomeMy WebLinkAboutSDP201500009 Letter of Revision 1 2016-01-14�illl
•�zQ
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5532 Fax (434) 972 -4176
January 14, 2016
Daniel Hines
28 Blackwell Park Lane, Suite 201
Warrenton, VA 20186
RE: LOR# 1for SDP 2015- 09 5" Street Station -Phase 11
Dear Rob:
This letter is to approve as a Letter of Revision to the above site plan to show
adjustments as shown on correspondence dated November 20, 2015 which is attached.
This is the 1 st Letter of Revision for this site. A total of three (3) Letters of Revision are
allowed before all changes to the plan are required to be submitted in the form of a site
plan amendment.
Sincerely,
A/'_�
Sarah D. Baldwin
Senior Planner
Attachments: Letter of Revision for Fifth Street Station Phase II dated 11/20/15
Plans entitled Letter of Revision Phase 11 last revised 117/16
{
BOHLER
E N G I N E E R I N G
November 20, 2015
Via Hand Delivery
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
(434) 296 -5832
Attn: Glenn Brooks
28 Blackwell Park Lane, Suite 201
Warrenton, VA 20186
PHONE 540.349.4500
Re: SDP - 2015 -009
Overall Phase II — Letter of Revision
5t' Street Station
AIbemarle County, VA
BE #V122001
Dear Mr. Brooks:
Bohler Engineering is pleased to submit on behalf of, SJ Collins Enterprises, a Letter of Revision for Phase II at the
5' Street Station project in Albemarle County, Virginia. The changes at the rear of the building along with updated
building elevations were previously presented to the ARB and have been approved.
The following revisions have been made to the approved Overall Phase II Final Site Plan, dated 2/20115, last revised
11/20/15.
■ Modified loading areas for Buildings 200, 300, and 400
• Modified building pad elevations so that Building 200 and 300 are at the same elevation
• Grading modifications in parking field in front of Buildings 200 and 300 due to leveling of pad
• Updated rim elevations for storm and sanitary structures where applicable
• Optimized sanitary line for MH -18 and MH -19
• Revised utility tie ins for Buildings 400 and 500 per tenant request
• Added dumpster and enclosure behind Building 400 per tenant request
• Revised landscaping around Buildings 400 and 500
• Added fire hydrant in front of Building 400
• Added ADA spaces to the east of Building 500 per tenant request
• Net loss of three (3) parking spaces overall
Should you have any questions regarding this project or require additional information, please do not hesitate to
contact me at (540) 349 -4500.
Sincerely,
Bob ngineer '
Hines, P.E.
DRH/ls
H:1121V122001 \Administrative \Letters\151008 Phase 1I Plan Amendment Revisions Letter.doc
CIVIL AND CONSULTING ENGINEERS • PROJECT MANAGERS • SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS
WWW.BOHLERENGINEERING.COM