From: Jeremy Lynn plynn @serviceauthority.org]
Sent: Wednesday, July 23, 2014 1:53 PM
To: Christopher Perez
Cc: Elaine Echols; Francis MacCall
Subject: RE: Water Tank
My notes indicated that we would need to have a public meeting prior to the Site Review Meeting. Then we would have a
meeting with the Planning Commission and another with the BOS. Those are the only three I was aware of when we last
met.
Elaine, do you recall the purpose of the meeting? You mentioned it was in response to the backlash from the firing range
project that is requiring additional meetings.
Jeremy M. Lynn, P.E.
Senior Civil Engineer
Albemarle County Service Authority
168 Spotnap Road, Charlottesville, VA 22911
(434) 977-4511 ext. 114
From: Christopher Perez [mailto:cperez @albemarle.org]
Sent: Wednesday, July 23, 2014 1:47 PM
To: Jeremy Lynn
Cc: Elaine Echols; Francis MacCall
Subject: RE: Water Tank
Jeremy,
I believe this entire proposal will have a couple of public meetings but which aspect of the
proposal are you asking the question about?
Christopher P. Perez;Senior Planner
Department of Community Development'County of Albemarle.Virginia
401 McIntire Road Charlottesville,VA 22902
434.296.5832 ext.3443
From: Jeremy Lynn [mailto:jlynn@ serviceauthority.orq]
Sent: Wednesday, July 23, 2014 11:23 AM
To: Christopher Perez
Cc: Elaine Echols; Francis MacCall
Subject: RE: Water Tank
Chris,
We submitted our Site Plan Application earlier this week. I recall in our meeting with Elaine that a public meeting was
necessary for this project. When should that be scheduled and how should we go about getting that going? I believe you
indicated that this should take place prior to the September Site Review Meeting. Please advise, thanks.
Jeremy M. Lynn, P.E.
Senior Civil Engineer
Albemarle County Service Authority
168 Spotnap Road, Charlottesville, VA 22911
(434) 977-4511 ext. 114
1
%nro. wee
From: Christopher Perez [mailto:cperez(a>albemarle.orq]
Sent: Thursday, July 10, 2014 4:33 PM
To: Jeremy Lynn
Cc: Elaine Echols; Francis MacCall
Subject: RE: Water Tank
Jeremy,
Yes, the fees can all be paid in one check. See below for a list of what is needed for submittal.
1) For the site plan you will need to submit the completed application (obtain application at the
link below), the application fee of$1500 shall be paid, and 16 copies of site plan shall be
provided.
http://www.albemarle.org/u_pload/images/forms center/departments/Community Development/
forms/applications/Site Plan_.. Amendment_Application.pdf
2) For the Special Exception it is a $425 fee and you need to submit the request for the special
exception request of Section 4.10.3.1(b) and (c) please try and make the finding in item C (see
below for the section of the ordinance in red)
3) For the public notification fees, these fee are not required for submittal of the site plan. The
front desk won't take them with the application. Rather staff calculates these fees after the plan
has been deemed complete and review can commence. The fee must be paid prior to Site
Review Committee (SRC) meeting, staff will contact you once this fee has been calculated.
The fee is calculated through the formula provided below in blue.
4) If you are also planning on submitting the 20' landscape easement that we previously
discussed to be located on the adjoining neighbors property, then you will need to submit an
easement plat for County review/ approval. To obtain application see link below. The review
fee is $200. You'll also need to submit the plat and any deed work associated with it.
http://www.albemarle.org/upload/images/forms_center/departments/Community Development/
forms/applications/Easement_Plat &_Checklist.pdf
5) Comprehensive Plan Compliance Application
http://www.albemarle.org/upload/images/forms_center/departments/Community_Development/
forms/applications/Comprehensive Plan_Compliance_Application.pdf
Notices required by Section 32.4.2.1 ( 1')
1're ar in.. and mailing or deliverin:_? up to fifty 50 notice; = S200.00 Preparimz and
mailing or delivering, per notice more than lil. f 50? . $1 . 10 plus the actual cost of
first class postage.
2
Name '4401
4.10.3.1 EXCEPTIONS--EXCLUDED FROM APPLICATION
The structures identified below shall be subject to height limitations as follows:
a. The height limitations of this chapter shall not apply to barns, silos, farm buildings,
agricultural museums designed to appear as traditional farm buildings, residential chimneys,
spires, flag poles, monuments, transmission towers and cables, smokestacks, water tanks, or
radio or television antennas or towers.
b. Any structure identified in subsection (a), other than one now or hereafter located on an
existing public utility easement, shall not: (1) be located closer in distance to any lot line than
the height of the structure; and (2) within a residential district, exceed one hundred (100) feet in
height, except for telecommunications facilities owned or operated in whole or in part by the
county, which shall not exceed one hundred fifteen (115) feet in height.
c. The commission may modify or waive either requirement of subsection (b) in an individual
case if it determines that the public health, safety or welfare would be equally or better served
by the modification or waiver. In granting such modification or waiver, the commission may
impose such conditions as it deems necessary to protect the public health, safety or welfare.
d. The board of supervisors shall consider a modification or waiver of this subsection only as
follows:
1. The denial of a modification or waiver, or the approval of a modification or waiver with
conditions objectionable to the developer may be appealed to the board of supervisors as an
appeal of a denial of the plat, as provided in section 14-226 of the Code, or the site plan, as
provided in sections 32.4.2.7 or 32.4.3.9, to which the modification or waiver pertains. A
modification or waiver considered by the commission in conjunction with an application for a
special use permit shall be subject to review by the board of supervisors.
2. In considering a modification or waiver, the board may grant or deny the modification or
waiver based upon the finding set forth in subsection (c), amend any condition imposed by the
commission, and impose any conditions it deems necessary for the reasons set forth in
subsection (c).
Christopher P, Perez!Senior Planner
Department of Community Development(County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
From: Jeremy Lynn [mailto:jlynn @serviceauthority.org]
Sent:Thursday, July 10, 2014 11:52 AM
To: Christopher Perez
Subject: FW: Water Tank
Chris,
Can you confirm the costs for our site plan submission? I need to request a check today. Can it all be on one check? yes
3
Nor
• Major Site Plan Amendment-$1,500 Yes that is the correct fee.
• Relief-$425 yes
• Costs for Public Meeting Notice-???????
Jeremy M. Lynn, P.E.
Senior Civil Engineer
Albemarle County Service Authority
168 Spotnap Road, Charlottesville, VA 22911
(434) 977-4511 ext. 114
From: Elaine Echols [mailto:EECHOLSCaalbemarle.orq]
Sent: Friday, June 27, 2014 3:32 PM
To: 'Jeremy Lynn'
Subject: RE: Water Tank
Hi Jeremy,
Not doing site plans in about 15 years, I'm a little rusty on this stuff so had to ask a bunch of questions of other staff.
You check the 2 boxes on the site plan application: Major Amendment and Relief from conditions/modification or
waiver of requirement on the application found here:
http://www.albemarle.org/upload/images/forms center/departments/Community Development/forms/applications/Si
to Plan - Amendment Application.pdf
FEES
El Major Amendment U Minor Amendment(alterations to parking.circulation,hi
SI501) size.location).$500
16 folded copies of pion are required 8 folded copies of plan are required
a Relief from conditions of approval;modification or waiver of requirements is S425
Notices required by Section 324..2.1 if)
Preparing and mailing or delivering up to fifty(50) notices=$200.01)
Preparing and mailing or delivering,per notice more than fifty(50)=$1.00 plus the actual cost of first class postage.
The$1500 fee plus the$425 fee plus the public notice costs apply. I'll need to ask you to coordinate on fees with Francis
or Christopher when you get back. I'm just way out of my element there!
Have a great vacation.
Elaine
From: Jeremy Lynn [mailto:jlynn@ serviceauthority.orq]
Sent: Friday,June 27, 2014 2:28 PM
To: Elaine Echols
Subject: RE: Water Tank
Elaine,
Thanks for meeting with me this afternoon. What is the name of the Exception form that I need? I wanted to download a
copy and send to Chip.
Jeremy M. Lynn, P.E.
Senior Civil Engineer
Albemarle County Service Authority
4
•
168 Spotnap Road, Charlottesville, VA 22911 ,4110,
(434) 977-4511 ext. 114
From: Elaine Echols [mailto:EECHOLSOalbemarle.orq]
Sent: Thursday, June 26, 2014 2:53 PM
To: 'Jeremy Lynn'
Subject: RE: Water Tank
See you then.
Elaine
From: Jeremy Lynn [mailto lynn(aserviceauthoritv.orq]
Sent: Thursday,June 26, 2014 2:51 PM
To: Elaine Echols
Subject: RE: Water Tank
I'll try to come between 1:15 and 1:30. See you tomorrow.
Jeremy M. Lynn, P.E.
Senior Civil Engineer
Albemarle County Service Authority
168 Spotnap Road, Charlottesville, VA 22911
(434) 977-4511 ext. 114
From: Elaine Echols [mailto:EECHOLS(aalbemarle.orq]
Sent: Thursday, June 26, 2014 2:47 PM
To: 'Jeremy Lynn'
Subject: RE: Water Tank
1:30 will work. If you wanted to come at 1:15,we might have a little more time, if we need it, since I have a meeting at
2 p.m.
From: Jeremy Lynn [mailto:jlynnOserviceauthority.orq]
Sent: Thursday,June 26, 2014 2:45 PM
To: Elaine Echols
Subject: RE: Water Tank
Elaine,
If 1:30 pm will work for you, let me know and I will come over to the COB.
Jeremy M. Lynn, P.E.
Senior Civil Engineer
Albemarle County Service Authority
168 Spotnap Road, Charlottesville, VA 22911
(434) 977-4511 ext. 114
From: Elaine Echols [mailto:EECHOLSOalbemarle.orq]
Sent:Thursday, June 26, 2014 2:44 PM
To: 'Jeremy Lynn'
Subject: RE: Water Tank
Are you available some time between 11 a.m.and 2 p.m.tomorrow? If so, could you pick a time to meet and I can give
you answers to your questions and talk about any outstanding concerns.
Thanks.
5
•
Now
Elaine
From: Jeremy Lynn [mailto:jlynn@ serviceauthority.orq]
Sent: Wednesday, June 25, 2014 2:19 PM
To: Elaine Echols
Cc: Chip Votava
Subject: RE: Water Tank
Elaine,
There would be significant challenges in moving the tank. It would have an impact on our grading plan and significantly
impact the fire departments parking lot. This would also likely require retaining walls.
Jeremy M. Lynn, P.E.
Senior Civil Engineer
Albemarle County Service Authority
168 Spotnap Road, Charlottesville, VA 22911
(434) 977-4511 ext. 114
From: Elaine Echols [mailto:EECHOLS@albemarle.orq]
Sent: Wednesday, June 25, 2014 9:09 AM
To: 'Jeremy Lynn'
Subject: RE: Water Tank
Yes,we should have some answers by Friday and can meet. Out of curiosity, is there any ability for the tank to be
pushed back a little more from the south property line? Would there be major problems moving it back?
From: Jeremy Lynn [mailto:jlynn@serviceauthority.orq]
Sent: Wednesday, June 25, 2014 8:38 AM
To: Elaine Echols
Cc: cvotava@ mbakercorp.com; Christopher Perez
Subject: RE: Water Tank
Elaine,
I will be out of the office until at least Wednesday, July 9th and may not actually return until Monday, July 14th. Can you
meet this week or does that not provide you with enough time to discuss the items internally?
1. The 32.5 feet includes the room to the right-of-way. Specifically, here is the breakdown:
• 19.5 feet from the tank to the screening plant
• 5 feet from the screening plant to the sidewalk
• 5 feet of sidewalk
• 3 feet from the sidewalk to the property line (the tree was moved to the property line, which is also the
ROW)
• In addition, please note 3 feet from property line to the face of curb.
2. There is an email history regarding the 20' from the south property line with the County (see attached). Andrew
Boninti and Alan Franklin are aware of the setback issue. Andrew signed off on waiving the buffer requirement as
part of our contract with the County and their rezoning shows the location of the tank being close to that property
line.
Jeremy M. Lynn, P.E.
Senior Civil Engineer
Albemarle County Service Authority
168 Spotnap Road, Charlottesville, VA 22911
(434) 977-4511 ext. 114
6
. • From: Elaine Echols [mailto:EECHOLS(aalbemarle.orq]
Sent: Monday, June 23, 2014 5:06 PM
To: 'jlynn @serviceauthority.org'
Cc: 'cvotava @mbakercorp.com'; Christopher Perez
Subject: Water Tank
Hi Jeremy,
You, Chris,and I probably need to talk again, but, I don't think it is necessary for Chip to come from VA Beach to talk
with us. A few things have come up since Chris and I began discussing the answers we need to provide you.
First, I realize that I need to be clear on what is being proposed along the street frontage as well as between the tank
and the adjoining residential lots to the south. I don't know what was finally decided on or what you are proposing.
Does the 30'from the property line include room for additional street r.o.w that includes street trees and a sidewalk, in
addition to buffering vegetation? This is what I thought had been worked out, but, I really don't know.
In addition, I don't know that you and I have ever really talked about the setback to the lots to the south. One of the
early drawings showed about 32' between the tank and the southern lot line, but,with only 20', I worry that the future
residents may feel like the tank is right in their back yard. Has this situation been discussed with Andrew Boninti?
I also just found out when telling David Benish about this project,that on July 2 the Board will be reviewing a new
development review schedule for public projects for compliance with the comprehensive plan. The review period is
much longer than what I provided to you today. I need to talk to David and Wayne about how this might affect your
review schedule.
Chris and I will be back with you later this week with answers about schedules and whether this will qualify as a major or
minor amendment. Please let me know what you can about the expected street frontage components and anything
more you can share about the setback to the residential units.
Thanks.
Elaine
Elaine K. Echols, FAICP
Principal Planner—Albemarle County Community Development
401 Mclntire Road
Charlottesville, VA 22902
434-296-5823 x 3252
7
Michael Baker Innovation Done Right...We hake a Difference
INTERNATIONAL
September 12,2014
Mr.Christopher P.Perez
Senior Planner
Department of Community Development
County of Albemarle
401 McIntire Road,North Wing
Charlottesville,Virginia 22902-4596
RE: SDP-201400054 Glenmore Ground Storage Tank,Pump Station,and Water Main Project At East Rivanna Fire
Station--Major Site Plan Amendment
ACSA Project 2013-04
Dear Mr.Perez:
The following responses to County comments,dated September 3,2014,are provided.
Comments by Christopher P.Perez, Senior Planner,Dept. of Community Development
In order for the amended site plan to be approved the following revisions are required:
1. [Comment] The project requires a Comprehensive Plan Compliance review(CCP)by the Planning
Commission prior to final site plan approval.The revised Site Plan is anticipated to be used for this review
and taken to the Planning Commission as an exhibit. Prior to scheduling the CCP please revise the plan to
meet the following comments.
Response: Acknowledged
2. [32.5.2(a)]Setbacks. On the cover sheet of the plan assure that the setbacks for the water tank are listed as 1
to 1 based on the height of the tower.As proposed the site requires two special exceptions both to reduce the
required setbacks to property lines(rear and side). A request has been submitted and is being processed.
Prior to final site plan approval the special exceptions should be listed on the cover sheet of the site plan to
date.
iuciuuc i icu'&j:i17IGvhi uaw.
Response: The following notes have been added to Sheet 1:
Setbacks: 1 to 1 based on water tank structure height.
Special Exception approved on
3. [Comment]It does not appear that any of the previously approved items on the Fire Station Site Plan
(SDP92-4 and LOR#1 and LOR#2)are being modified with this plan.Thus for all items previously
approved on the Fire Station Site Plan which are not needed for access to the proposed storage tank facility,
please gray them out and subdue them,assure they are still legible. Also assure a note is provided on the
previously approved items which states: "Existing items previously approved on SDP1992-4 and
LOR#1 dated July 20, 2000 and LOR#2 dated February 20, 2004".
Also,please assure the improvement from LOR#2,a 14'x16'wooden deck at the edge of the travelway
behind the building,is depicted,labeled and subdued. The improvements which were subject of LOR
#1 are already depicted on the plan (lighting).
Response: As requested features and labels are shown on Sheets 3 and 5.A note has been added to
Sheet 3 stating "Existing items previously approved on SDP1992-4, LOR#1 dated July 20, 2000, and
LOR#2 dated February 20, 2004 are shown".
RBF
272 Bendix Road,Suite 4001 Virginia Beach,VA 23452
KASEMAN ESALLVPORT MBAKERINTL.COM Office:757.463.8770I Fax:757.463.0503
Michael Baker
INTERNATIONAL
Mr. Christopher P. Perez
September 12, 2014
Page 2
4. [32.5.2(a);32.5.2(e)]General information. Provide a separate sheet which depicts the existing
conditions of the site.Specifically with regard to the existing trees onsite.
Response: Existing conditions of the site provided as Sheets 3 and 4,including existing trees to be
utilized for screening.
5. [Comment] On sheet 1, under the title of the site plan is what appears to be an ACSA project
number:'project number 2013-04";however, Community Development (CD) also utilizes project numbers,
to avoid confusion, either omit the number entirely or specify that it's an ACSA project number and also
provide the CD project number: "SDP2014-54 Major Site Plan Amendment to SDP1992-4".
Response: Sheet 1 has been revised to include ACSA Project Number 2013-04 and the CD project
number SDP2014-54, Major Site Plan Amendment to SDP1992-4.
6. [Comment] Also,currently the title of the site plan is"Glenmore Ground Storage Tank, Pump Station and
Water Main Project"; however, the title should also reference the existing "East Rivanna Fire Station".
Revise.
Response: Title modified to Glenmore Ground Storage Tank,Pump Station and Water Main Project
at East Rivanna Fire Station on sheet 1.Additionally,all sheets have been revised to include the CD
project number.
7. [32.5.2(a)] General Information. On sheet 1,under Albemarle County Service Authority is
"Charlottevsille, VA" assure this item is replaced with "Albemarle County." As the site plan is taking
place in Albemarle County.
Response: Modified as requested.
8. [32.5.2(a)] General Information. On sheet 1,under Existing Use, Water Storage Tank and Pump Station is
listed;however the Fire Station is also on the property. Add 'Fire Station' use to existing uses.
Response:Modified as requested.
9. [32.5.2(01 General Information. On the plan provide the zoning districts and the uses of abutting properties.
Response: As requested the zoning districts and uses of properties abutting the site are listed on
sheets 3 and 4 as well as on sheet 5.
10. [32.5.2(a)] On the plan provide the parcel size(acreage).
Response: Parcel size for the existing property is 6.0 acres and has been shown on sheets 3 and 5.
11. [32.5.2(a)] Zoning.This property is zoned Neighborhood Model District (NMD). Also, the property is
subject to proffers associate with ZMA2001-8 Rivanna Village at Glenmore and a Code of
Development.Assure this information is noted on the plan's cover sheet.
Response: As requested,a note stating the zoning is Zoning of Neighborhood Model District(NMD)
and a note stating the property is subject to proffers associate with ZMA2001-8 Rivanna Village at
Glenmore and a Code of Development have been added to the Plan's cover sheet(sheet 1).
12. [32.5.2(i)]Provide the pavement width for both entrances to the site and their associated
accessways/travelways.
Response: As requested,the existing pavement widths for the entrances to the site and associated
accessways/travelways to the site(24' wide)have been shown on Sheet 5.
Michael Baker
INTERNATIONAL
Mr. Christopher P. Perez
September 12, 2014
Page 3
13. [32.5.2(i)] Dimension all travelways being used by the proposed use and provide directional arrows to
signify traffic flow throughout the site.Also, on page 8 the proposed 20' ingress and egress easement is in
an area where the approved travelway was 24' wide. Is the travelway still 24' wide?
Response: The travelway widths and traffic flow arrows have been shown on sheet 5. ACSA's standard
ingress/egress easement requirement is a width of 20'. A travelway of 24' is available; however,the
ingress/egress casement has remained at 20'.
14. [32,5.2(b)]Provide the maximum amount of impervious cover proposed on the site.
Response: The existing impervious area is 88,701 SF.The proposed impervious will be an additional
4,201 SF for a total impervious area of 92,902 SF. The following information has been included on
sheet 5:
Existing Impervious Area: 88,701 SF
Proposed Total Impervious Area: 92,902 SF.
15. [32.5.2(b)] Provide the maximum acreage occupied by each use.
Response: The existing and proposed acreage of the site occupied by each use has been provided on
sheet 5.
16. [32.5.2(b)] Clearly list the proposed structures' square footage as well as the overall square footage for
the site.
Response: As requested,the square footage for existing fire department building and the proposed
pump station,water tank and generator slab have been shown on sheet 5.
17. [32.6.2(h)] Signature panel. Provide a signature panel for all SRC reviewers to sign the site plan.
Response:A signature panel has been provided for all SRC reviewers as requested on Sheet 1.
18. [Comment] On the site plan provide the information as to whether the site is served by public water and
sewer.
Response: As requested. a note has been added to the site plan(sheet 5)that the site is not served by
public water or sewer.
19. [32.5.2(b)] Information regarding proposed use. Provide the maximum height of all proposed structures.
Response: The maximum heights of the proposed water tank and pump station have been provided
on sheet 5 as requested.
20. [32.5.2(a)] On sheet 1 under tax map parcel information assure all parcels involved in the proposal
are listed.
Response: Tax map parcel information for all parcels involved with the proposed project has been
listed on sheet 1.
21. [32.5.2(a), 32.5.2(d)] Provide the source of topography.
Response: As provided by note 1 on Sheet 2,topography was provided by Rinker Design Associates,
P.C.using conventional survey methods.
22. [32.5.2(b), 4.12.7]Parking. Provide information regarding parking for the proposed use, including how
much is required for the proposed use.If shared parking is to be utilized, a shared parking agreement shall be
furnished and an explanation as to how the two uses would overlap to accommodate the parking agreement.
See 4.12.7 of the Albemarle County Code for explanation of parking for unscheduled uses.
Response: There are no delineated(painted)parking spaces in front of the proposed pump station(to
err
Michael Baker
INTERNATIONAL
Mr. Christopher P. Perez
September 12, 2014
Page 4
prevent public use of the parking area).Typically,short duration unscheduled maintenance visits by
a single ACSA vehicle will occur daily.There is space provided for two vehicles.
A sign will be placed in front of the parking area stating"Authorized Vehicles Only".This signage
requirement has been included as a note on sheet 5.
23. [32.5.2(b)] Provide the maximum amount of impervious cover on the site.
Response: See response to number 14 above.
24. [32 5.2(d)] Show/label areas of the site with managed and/or preserved steep slopes.
Response: As requested,Areas of managed and/or steep slopes have been shown on sheets 5,7,8,9,
and 10. Refer to the legend on Sheet 2 to identify the symbology.
25. [32.5.2(n)] Label blank areas around the water tank with the intended ground cover/surface
treatment.
Response: Ground areas around the proposed water tank and pump station will have a grass cover.
Sheets 5 and 6 have been revised to clarify this requirement.
26. [32.5.2(j,k,l)] Verify that the location(s) of all existing or proposed utilities and utility easements including
water, sewer, drainage, telephone, cable, electric and gas are shown on the plan. Label any existing
easements with the Deed Book and Page Number.
Response: Information available for existing utilities and easements are depicted on Sheets 3 and 4,
as well as on the respective sheets for proposed work.Proposed easements are shown on sheets 5,6,
7,8,9, 10, 11 with"DB ,PG. " until recordation is complete.
27. [32.6.2(j) & Comment] Please show utilities and associated easements on the landscape plan to verify
that no conflicts exist with planting locations.
Response: Utilities and associated easements have been shown on the Landscape Plan (sheet 6)to
show no conflicts exist with the planting locations.
LM. [32.5.2(n)j Label and provide the dimensions or all proposed improvements.
Response: The dimensions of proposed improvements have been shown on sheet 5.
29. [Comment] As proposed off-site easements are required, easement plats must be submitted,reviewed,
approved and recorded prior to Site Plan approval. Deed Book and Page reference information of each
recorded easement shall be listed on the site plan. Specifically for: "Proposed 20'Permanent
Easement", "Proposed Variable Width Permanent Easement", "Proposed 10' Tempora:y Easement",
and "Proposed 20'Landscaping Easement"on TMP 093A1-00-00-00400. Please submit easement
plat(s) to the County to facilitate these items. Also, for the landscape easement provide a maintenance
agreement which shall be reviewed/approved by the.County Attorney and will be set to record with the
plat.
Response: As discussed with Mr.Perez,easements plats will be provided to Albemarle County when
acquired.The plans have been revised to show a DB,PG reference that can be updated when
recordation process is complete.
Also,if any work or easements are taking place on TMP 07900-00-00-025B0,which is owned by Robert and
Carolyn Livengood, such easements shall be recorded as well.
Response: There is no proposed work or proposed easement on TMP 07900-00-00-025B0.
30. [32.5.2 (lb)]Scale. Pages 6, 7, 8,9,and 10 all utilize a scale of 1" =25'; however, this is not an acceptable
scale.Please revise to provide an appropriate scale of either 1" =20' or 1" =40'. Revise.
Michael Baker
Mr. Christopher P. Perez
September 12, 2014
Page 5
Response: As requested,scales have been changed to 1"=20' for sheets 7,8,9, 10 and 11 (previously
sheets 6-10).
31. [32.5.2(a)] General Information. Throughout the plan there are notes which reference various sheets for
details to tank,pump, and altitude and pressure sustaining valve vault assembly (see sheet 8);however,
none of these sheets or details are provided in the site plan. Either provide the sheets or omit the notes on
sheet 8.
Also, in total the cover sheet lists 32 pages; however, only 15 pages are provided in the site plan set.
Please explain why these pages are omitted from the plan.If the pages are to be provided,please add them
to the set.If they are not to be provided, omit them from the sheet 1 index of drawings and re-number
pages appropriately.
Response: As requested,only sheets for the Site Plan are included.A total of 15 sheets comprise the
submittal.
32. [32.6.2(g)] All water facilities to be dedicated to public use and the easements for those facilities shall be
identified by a statement that the facilities are to be dedicated to the Albemarle County Service Authority.
Response: Acknowledged.A note has been added to sheet 2(#22)stating that"All water facilities and
water line easements are to be dedicated to the Albemarle County Service Authority".The utilities
and easements are shown on Sheets 5-11.
33. [32.5.2e,32.5.2p,32.6.2(j)], 32.7.9.4] Landscape plan. A landscape plan that complies with section 32.7.9
is required prior to the Major Site Plan Amendment approval. The landscape plan shall verify that the site
satisfies the minimum landscaping and screening requirements of Section 32. See comments below.
Response: The Landscape Plan has been revised based upon discussion with the Albemarle County.
34. [32.6.2(j) & 32.7.9.4(b), 32.7.9.7] Screening. Existing trees may be preserved in lieu of planting new plant
materials in order to satisfy the landscaping and screening requirements of section 32.7.9 subject to the
agent's approval. Specifically some of the existing trees within the proposed 20' landscaping easement
are between 20' -6U' tall and nave a mix of deciduous and evergreen trees present. Please verify die above
on the site plan on the existing conditions page and landscape plan. Upon verification, it may be
appropriate for the existing trees to be preserved as undisturbed buffer area, as mature trees will provide
superior screening of the tower from day one. If the existing mature trees within the 20' landscape
easement are determined by the Agent to be adequate to screen the facility the following shall be
followed:
Response: Existing tree information is provided for the 20' landscaping easement on the existing
conditions sheet and the landscaping plan Sheets 3 and 6.
The landscape plan should show the trees to be preserved, the limits of clearing, the location and type of
protective fencing, grade changes requiring tree wells or walls, and trenching or tunneling proposed beyond
the limits of clearing.In addition, the applicant shall sign a conservation checklist approved by the agent to
insure that the specified trees will be protected during construction. Except as otherwise expressly approved
by the agent in a particular case, such checklist shall conform to specifications contained in the Virginia
Erosion and Sediment Control Handbook, pp ill-284 through ill-297, and as hereafter amended. This
checklist must be signed,dated and included on the plans.
Response: The checklist has been signed and included on sheet 6.
35. [32.6.2(j) &32.7.9.4(b), 32.7.9.7(d)] Minimum depth and spacing requirements for a planting strip or
existing vegetation. Ifonly a planting strip or existing vegetation is provided as screening, the planting
strip or the existing vegetation shall not be less than twenty (20)feet in depth. Ifa planting strip is
Michael Baker
INTERNATIONAL
Mr. Christopher P. Perez
September 12, 2014
Page 6
provided, the plant materials shall consist of a double staggered row of evergreen trees planted fifteen
(15)feet on center, or a double staggered row of evergreen shrubs planted ten (10)feet on center, or an
alternative vegetative screening approved by the agent.
To meet the above requirement the landscape plan shall be revised as follows:
e Within the side yard,replace all the 'Nellie Stevens Holly' with evergreen trees, it may be appropriate
to continue utilizing 'Leyland cypress' in place of the 'Nellie Stevens Holly' or the applicant may
choose to utilize some other approved evergreen tree. Revise to assure double staggered row of
evergreen trees planted 15' on center. Also, assure that this planting strip is a minimum of 20'deep,
currently its only 14' deep. Also continue the planting strip another 25 feet to the other side of the
'Altitude and Pressure Sustaining Valve Vault Assembly' to completely screen the tower from the
road. Revise.
Response: The plan has a 20-foot wide planting strip along the property line. The landscaping
has been revised to provide two rows of Leyland Cypress at 15' on center. The rows of tress
have been extended as requested to provide further screening of the tank. No trees are planted
over the water main.
• Within the proposed 20' landscape easement, if the existing trees are determined not to be adequate or
the applicant is unable to preserve them and instead goes with new plantings assure the following is
met. Provide another row of evergreen tree in addition to the row depicted to meet the minimum
screening, it may be appropriate to continue utilizing 'Leyland cypress' in the second row or the
applicant may choose to utilize some other approved evergreen tree. Revise to assure double staggered
row of evergreen trees planted 15' on center.
Response: The landscape plan(sheet 6) has been revised describe the existing trees and provide a
tree save area to provide a natural buffer.
36. [32.6.2(j) & 32.7.9.4(b), 32.7.9.7(d)] Screening. The proposal includes a detention pond towards the
southernmost boundary of the property. This feature is required to be screened from residentially zoned
parcels per 32.7.9(a)3. Also, with the proposal, clearing is taking place to the property line adjaeent LO
residentially zoned land, this clearing causes the parking lot to be visible from the residentially zoned land.
For both of these items provide screening which meets the requirements of32.7.9.7.
Response: As discussed with Mr.Perez,the alignment of the water main on sheet 10 has been
revised to provide a natural wooded buffer to screen the biodetention facility.
37. [32.5.2(n),32.6.2(k)& 4.17] Lighting. Is any outdoor lighting proposed with the site plan?If so, all
lighting (including building mounted fixtures)must be shown on a lighting plan that includes a
photometric plan, luminaire schedule and cut sheets for each proposed fixture.
Response: A lighting plan has been provided on sheet 15 of the Site Plan submittal.
38. [32.5.6(a)] When revisions are submitted,provide a date and description of revision specific to
submittal to the County.
Response: A revision block has been added to all sheets that were revised from the previous
submittal and detailed descriptions of comment responses are included in this letter.
39. In accord with the provisions of Section 32.4.3.5 of Chapter 18 of the Code if the developer fails to
submit a revised final site plan to address all of the requirements within six (6) months after the date of
this letter the application shall be deemed to have been voluntarily withdrawn by the developer.
Response: Acknowledged
Michael Baker
INTERNATIONAL
Mr. Christopher P. Perez
September 12, 2014
Page 7
Comments from John Anderson,Albemarle County Engineering
(A site plan is a record of zoning compliance on the property. It should not include VSMP plans.)
Response: Per discussion with Mr.Anderson on September 9,2014,all erosion and sediment control
and stormwater management information and related sheets have been removed from the Site Plan
submittal.
Code Chapter 18 section 32,part of the Zoning Ordinance.
1. Title pg.-Label major roads on Location Map to help orient project.
Response: Major roads have been identified on sheet 1 in the Location Map.
2. Label existing parking,East Rivanna VFD,sheet 4 and across site plan sheets.
Response: Existing parking lot has been labeled on sheets 3 and 5.
3. Revise Legend,sheet 2,to include SAF,TS,MU, and TP(VESCH symbols).
Response: VESCH symbols have been removed from the Site Plan submittal.
4. Show Managed Steep Slopes on TMP 79-25A on sheets 4,9. Ref.County GIS,Overlay District, and §8-
30.7.5.d.-Re-establish existing grade;do not construct fill or cut slopes on Managed Steep Slopes(none are
proposed).
Response: As requested,Areas of managed and/or steep slopes have been shown on sheets 3,4, 5,7,
8,9,and 10. Refer to the legend on Sheet 2 to identify the symbology.
5. Provide pipe end wall and revised surface contours for proposed 42' L pipe,sheets 5/22, #19, below, Covering
exposed pipe(with riprap)is an unorthodox approach. Propose final contours that accommodate pipe with end
wall design. Eliminate need to partially embed,leaving exposed,28 LF± of 18" DIA concrete pipe.
Response: The 18"storm drainage outfall on sheet 5 has been revised to include an end wall.
Additionally,the alignment has been changed to allow the outfall to be directed to the existing site
drainage swale. Sheet 13 provides a profile of the storm pipe and associated structures.
6. Sheet 5:It appears that Ex.pavement(VFD) will be cut to install two 18"DIA storm pipes (124', 42'). Furnish
pavement cut,repair,depth details. Provide accompanying pavement notes.
Response: As requested,a pavement repair details have been included for repairs to Steamer Drive
and Glenmore Way.A pavement repair has also been included for the parking lot on the site that will
be affected by the installation of the 18"diameter storm pipes. These details are shown on sheet 14.
7. If new easement is required between Glenmore Way(inbound/outbound)in the area north of Steamer Drive
(sheet 6), show proposed new temporary and permanent ACSA utility easements.
Response: No easements are required between Glenmore Way(inbound/outbound)in the area north
of Steamer Drive as this area is right-of-way(ROW).The ROW in this area is now clearly noted.
New temporary and permanent ACSA utility easements are shown on sheets 5-11.
8. Sheet 7:Locate drain field on TMP 093A1-00-00-00400 if drain field boundaries known.
Response: The approximate location of the drainfields for TMP 093A1-00-00-00400 has been shown
on sheets 3 and 7 as requested.
9. Sheet 9/10:Confirm variable width permanent easement is proposed between bracketing,20' wide proposed
permanent easements.
Response: The depiction of easements has been modified with ACSA's concurrence. Permanent
water line easements are now 20'wide.
Michael Baker
INTERNATIONAL
Mr. Christopher P. Perez
September 12, 2014
Page 8
10. Edit notes,sheet 18,to remove reference to"Station X+XX,""Sheet XX," and"XX-inch culvert."
Response: Sheet 18 has been removed from the Site Plan submittal.The sheet will be
provided with the VSMP and the references will be corrected.
11. Sheet 18:Revise note to meet VAR10 inspection frequency requirements(VAR10,Part II,F.). Link:
iittn: '1i\lli.dccl 4ituilita girl DItI<_!rain, \iafLift ',torlil\tafeiiilalia.letnenu l,,rilDnerlllikc c,n,tructineetietai
perm it.aspx
Response: Sheet 18 has been removed from the Site Plan submittal.The sheet will be
provided with the VSMP and the note will be corrected.
12. Sheet 19:Label Glenmore Way(cul-de-sac).
Response: Sheet 19 has been removed from the Site Plan submittal.Glenmore Way(cul-de-sac)is
labeled and shown on sheet 11 of the Site Plan submittal.
Comments below pertain to required VSMP application:
Response: Comments 13-32 will be addressed in VSMP Submittal.
13. Submit VSMP Application,ref.§17-401, 17-402.
14. Label feature that appears to be a stone entrance,sheet 5. Feature does not appear to be a CE or
generator pad(S end of Ex.parking lot).
15. Sheet 7:provide CIP at Ex. 18"RCP storm drain,Inv.388.80,sta.+48,after 12"water line installation is
complete.
16. Confirm that project limits of disturbance=1.497 Ac(total Area of Disturbance across all plan sheets. Ref. sheet
18,Existing Site Conditions).
17. Provide orange safety fence(SAF)between project limits and areas accessible to the public:Fire Station,
Glenmore Way(including cul-de-sac),and Steamer Drive,per detail,sheet 20.
18. Provide L x W for riprap outfall protection at 62'D1A, 35'Hwatertank,across plan sheets.
19. Provide L x W for revised riprap outfall protection at proposed 42'L @ 2.2%slope 18"DIA concrete storm pipe
(sheet 5,22).-see #5,above
20. Show on-site stockpiles,if any.
21. Identify off-site stockpile,waste,or borrow areas.
22. Revise Management Strategy,Note 6,sheet 18,to reference plan authority authorization and approval
needed to remove ESC measures. See Sequence of Construction Note 10,sheet 23,as template.
23. Sheet 18:ACDSM General Construction Notes for ESC plans now number 1-20;please replace 1-22. Link:
http://www.albemarle.org/departrnent.asp?departrnent=cdd&relpage=4447
24. ESC:Revise CE labels across plan sheets consistent with Project Narrative,Structural Practices Narrative. Revise
CE label to:temporary paved wash rack(PCB). -see sheet 18.
25. Replace or supplement CE detail,sheet 20,with paved wash rack detail,per ACDSM,below. -see #24
26. Sheet 22 appears to provide sufficient information to evaluate SWM plans against Virginia Runoff Reduction
Method Redevelopment Worksheet,but reserve comment on SWM plan not yet submitted.
27. Sheet 22:Show bioretention bed W x L dimensions in plan view: 13' x 26'.
28. Sheet 22:Provide 1.1 CFS 100-yr storm event calculation/s.
29. Sheet 22:Specify frequency for 0.5' depth of water above the bioretention area.
30. Sheet 22:Provide sizing calculations or design summary for grass swales leading to bioretention bed.
31. Submit SWPPP for project,ref. §17-405. LOD,item#16, VPDES Registration statement should match LOD
shown on plans.
32. SWM and ESC plans may not include site plan. Remove site plan sheets from SWM/ESC plans. A site
plan(Amendment)cannot be approved as part of SWM/ESC Plans.
lirmr *me
Michael Baker
INTERNATIONAL
Mr. Christopher P. Perez
September 12, 2014
Page 9
Comments from Troy Austin,P.E.,VDOT Land Use Engineer—Culpeper District
1. Details for appurtenances that will be located within dedicated right-of-way need to be included on the site plan.
More specifically,the details forPRV vault and the air release assembly need to be shown on the site plan.
Response:As requested,details for the PRV vault and air release assembly have been included on
sheets 12 and 14,respectively.
2. The preference is that the wet-tap to the existing 16"DIP waterline in the cul-de-sac of Glenmore Way be made in
the shoulder rather than under the asphalt of the cul-de-sac.
Response: Performing the wet-tap connection outside of the pavement limits was examined
during design.However,there are existing water service connections that required the wet-tap to
be performed in the pavement.The approximate locations of existing water service connection
have been shown on sheet 11 for clarity. During construction,ACSA will oversee the work and
evaluate if actual field conditions allow the wet tap to be moved to the shoulder.
3. A Land Use Permit will need to be obtained from this office for all construction activity occurring within dedicated
right-of-way. This permit should be obtained prior to commencement of construction activity.
Response: Acknowledged
Building Inspections-Jay Schlothauer
1) No comments or conditions.
Response: Acknowledged
Fire and Rescue-Robbie Gilmer
1) No comments or conditions.
Response: Acknowledged
E911-Andrew Slack
1) Approved
Response: Acknowledged
ACSA
No comments provided as they are the applicant.
Response: Acknowledged
Thank you for assistance in this project.If you have any questions or require additional information,please do
hesitate to contact me.
Sincerely,
MICHAEL BAKER JR. INC.
f
Chip Votava,P.E.
Project Manager
CFV/rfg
innovation Done F1Glii...VVc Make o Difference
INTERNATIONAL
November 5,2014
Mr. Christopher P.Perez
Senior Planner
Department of Community Development
County of Albemarle
401 McIntire Road,North Wing
Charlottesville,Virginia 22902-4596
P1 SDP-201400054 Glenmore Ground Storage Tank, Pump Station,and Water Mai-I Pre . :r fit. ?a- Rivanna F ire
Station- Major Site Plan :Amendment
ACS.A Project 2013-04
Dear Mr. Perez:
re Following responses to County comments,dated September 30 and October 3, 2014,are provid '. All former
,mmcnts and responses are included in our response letter. New comments are italicized and ies;:)nres.:re
p,-,-, ided in hold text.
Comments by Christopher P.Perez, Senior Planner,Dept. of Community Development
In order for the amended site plan to be approved the following revisions are required:
I. [Comment] The project requires a Comprehensive Plan Compliance review(CCP)by the Planning
Commission prior to final site plan approval.The revised Site Plan is anticipated to be used for this review
and taken to the Planning Conunission as an exhibit. Prior to scheduling the CCP please revise the plan to
meet the following comments.
Response: Acknowledged
Rev 1 Comment still valid. Claudette 6:int is the Planner working this item through the Planning
Commission. If you have questions about u'l:f.n this is ti go to the PC please contact '.er i't '34.290.:i8J.
I>113'50„r
Response: Acknowledged
2. 132.5.2(a)]Setbacks. On the cover sheet of the plan assure that the setbacks for the water tank are listed as I
to l based on the height of the tower.As proposed the site requires two special exceptions both to reduce the
required setbacks to property lines(rear and side). A request has been submitted and is being processed
Prior to final site plan approval the special exceptions should be listed on the cover sheet of the site plan to
include their approval date.
Response: The following notes have been added to Sheet 1:
Setbacks: 1 to 1 based on water tank structure height.
Special Exception _approved on
Rev I. Comment partially addressed with the note on sheet 1, once the special exceptions are approved,
the plan shall be revised to assure the BOS approval date of the special exceptions are provided on the
plan, also provide the approved setbacks on the plan and any conditions associated with it. Staff plans to
take the special exceptions to the BOS at their December meeting due to the.CCP's schedule.
Response: Acknowledged
3. [Comment]It does not appear that any of the previously approved items on the Fire Station Site Plan
(SDP92-4 and LOR#1 and LOR#2)are being modified with this plan.Thus for all items previously
272 Bendix Road,Suite 400 I Virginia Beach,VA 23452
jma �!?4. Y,ASMUN /ysAuYPORT MBAKERINTL.COM
Office:757.463.8770 I Fax:757.463.0503
*.11111V VW,
ii a�,
INTERNATIONAL
Mr. Christopher P. Perez
November 5, 2014
Page 2 of 11
approved on the Fire Station Site Plan which are not needed for access to the proposed storage tank facility,
please gray them out and subdue them,assure they are still legible.Also assure a note is provided on the
previously approved items which states: "Existing items previously approved on SDP1992-4 and
LOR#1 dated July 20, 2000 and LOR#2 dated February 20, 2004".
Also,please assure the improvement from LOR#2,a 14'x16'wooden deck at the edge of the travelway
behind the building,is depicted, labeled and subdued. The improvements which were subject of LOR
#1 are already depicted on the plan (lighting).
Response: As requested features and labels are shown on Sheets 3 and 5.A note has been added to Sheet 3
stating "Existing items previously approved on SDP1992-4, LOR#1 dated July 20, 2000, and LOR#2
dated February 20, 2004 are shown".
4. [32.5.2(a); 32.5.2(e)]General information. Provide a separate sheet which depicts the existing
conditions of the site.Specifically with regard to the existing trees onsite.
Response:Existing conditions of the site provided as Sheets 3 and 4, including existing trees to be utilized
for screening.
5. [Comment] On sheet 1, under the title of the site plan is what appears to be an ACSA project number:
"r"n, !.,ct nwn wer_"70 _2_0..4", h_owever, D—evelopment (CD) also utilizes project n mher
s.to avoid
confusion, either omit the number entirely or specify that it's an ACSA project number and also provide the
CD project number: "SDP2014-54 Major Site Plan Amendment to SDP1992-4".
Response: Sheet 1 has been revised to include ACSA Project Number 2013-04 and the CD project number
SDP2014-54, Major Site Plan Amendment to SDP1992-4,
6. [Comment] Also,currently the title of the site plan is"Glenmore Ground Storage Tank, Pump Station and
Water Main Project"; however, the title should also reference the existing "East Rivanna Fire Station''.
Revise
Response: Title modified to Glenmore Giound Storage Tank,Pump Station and Water Main Prject at East
Rivanna Fire Station on sheet 1. Additionally,all sheets have been revised to include the CD project
number.
7. [32.5.2(a)] General Information. On sheet 1,under Albemarle County Service Authority is
"Charlottevsille, VA" assure this item is replaced with "Albemarle County." As the site plan is taking
place in Albemarle County.
Response: Modified as requested.
8. [32.5.2(a)] General Information. On sheet 1, under Existing Use, Water Storage Tank and Pump Station is
listed;however the Fire Station is also on the property. Add 'Fire Station' use to existing uses.
Response: Modified as requested.
9. [32.5.2(a)] General Information. On the plan provide the zoning districts and the uses of abutting properties.
Response: As requested the zoning districts and uses of properties abutting the site are listed on sheets 3
and 4 as well as on sheet 5.
10. [32.5.2(a)] On the plan provide the parcel size(acreage).
Response: Parcel size for the existing property is 6.0 acres and has been shown on sheets 3 and 5.
11. [32.5.2(a)] Zoning.This property is zoned Neighborhood Model District (NMD). Also, the property is
subject to proffers associate with ZMA2001-8 Rivanna Village at Glenmore and a Code of
wove
ael er,
INTERNATIONAL
Mr. Christopher P. Perez
November 5, 2014
Page 3 of 11
Development.Assure this information is noted on the plan's cover sheet.
Response: As requested,a note stating the zoning is Zoning of Neighborhood Model District(NMD)and a
note stating the property is subject to proffers associate with ZMA2001-8 Rivanna Village at Glenmore
and a Code of Development have been added to the Plan's cover sheet(sheet 1).
12. [32.5.2(i)]Provide the pavement width for both entrances to the site and their associated
ac ce ssways/travelways.
Response: As requested,the existing pavement widths for the entrances to the site and associated
accessways/travelways to the site(24' wide)have been shown on Sheet 5.
13. [32.5.2(i)] Dimension all travelways being used by the proposed use and provide directional arrows to
signify traffic flow throughout the site. Also, on page 8 the proposed 20' ingress and egress easement is in
an area where the approved travelway was 24' wide. Is the travelway still 24' wide?
Response: The travelway widths and traffic flow arrows have been shown on sheet 5. ACSA's standard
ingress/egress easement requirement is a width of 20'. A travelway of 24' is available;however,the
ingress/egress easement has remained at 20'.
14. [32.5.2(b)]Provide the maximum amount of impervious cover proposed on the site.
Response: The existing impervious area is 88,701 SF. The proposed impervious will be an additional 4.201
SF for a total impervious area of 92,902 SF, The following information has been included on sheet 5:
Existing Impervious Area: 88,701 SF
Proposed Total Impervious Area: 92,902 SF.
15. [32.5.2(b)] Provide the maximum acreage occupied by each use.
Response: The existing and proposed acreage of the site occupied by each use has been provided on sheet
5.
16. [32.5.2(b)] Clearly list the proposed structures' square footage as well as the rnµara oot
overall sq _g_
overall f tacrP for
the site,
Response: As requested,the square footage for existing tire department building and the proposed pump
station,water tank and generator slab have been shown on sheet 5.
17. [32.6.2(h)] Signature panel. Provide a signature panel for all SRC reviewers to sign the site plan.
Response: A signature panel has been provided for all SRC reviewers as requested on Sheet 1.
18. [Comment] On the site plan provide the information as to whether the site is served by public water and
sewer.
Response: As requested,a note has been added to the site plan(sheet 5)that the site is not served by public
water or sewer.
19. [32.5.2(b)] Information regarding proposed use. Provide the maximum height of all proposed structures.
Response: The maximum heights of the proposed water tank and pump station have been provided on sheet
5 as requested.
20. [32.5.2(a)] On sheet 1 under tax map parcel information assure all parcels involved in the proposal
are listed.
Response: Tax map parcel information for all parcels involved with the proposed project has been listed on
sheet 1.
NIINW` Noel
>tchael -aker
INTERNATIONAL
Mr. Christopher P. Perez
November 5, 2014
Page 4 of 11
21. [32.5.2(a), 32.5.2(d)] Provide the source of topography.
Response: As provided by note 1 on Sheet 2,topography was provided by Rinker Design Associates,P,C.
using conventional survey methods.
22. [32.5.2(b), 4.12.7]Parking. Provide information regarding parking for the proposed use, including how
much is required for the proposed use.If shared parking is to be utilized, a shared parking agreement shall be
furnished and an explanation as to how the two uses would overlap to accommodate the parking agreement.
See 4.12. 7 of the Albemarle County Code for explanation of parking for unscheduled uses.
Response:There are no delineated(painted)parking spaces in front of the proposed pump station(to
prevent public use of the parking area).Typically,short duration unscheduled maintenance visits by a
single ACSA vehicle will occur daily. There is space provided for two vehicles.
A sign will be placed in front of the parking area stating"Authorized Vehicles Only". This signage
requirement has been included as a note on sheet 5,
23. [32.5.2(b)] Provide the maximum amount of impervious cover on the site.
Response: See response to number 14 above.
24. [32 5.2(d)] Show/label areas of the site with managed and/or preserved steep slopes.
Response: As requested Areas of managed and/or steep slopes have been shown on sheets 5. 7. 8. 9. and
10. Refer to the legend on Sheet 2 to identify the symbology.
Rev I. Comment partially addressed. On sheet 2 the legends lists "managed and,/or preserved steep
slopes";however, there are no preserved slopes onsite. Revise the note on sheet 2 to only state "managed
slopes".
Response: Legend modified to state managed slopes only.
25. [32.5.2(n)] Label blank areas around the water tank with the intended ground cover/surface
treatment.
Response: Ground areas around the proposed water tank and pump station will have a grass cover. Sheets 5
and 6 have been revised to clarify this requirement.
26. [32.5.2(j,k,1)] Verify that the location(s) of all existing or proposed utilities and utility easements including
water, sewer, drainage, telephone, cable, electric and gas are shown on the plan. Label any existing
easements with the Deed Book and Page Number.
Response: Information available for existing utilities and easements are depicted on Sheets 3 and 4,as well
as on the respective sheets for proposed work. Proposed easements are shown on sheets 5, 6,7,8,9, 10, 11
with"DB , PG. "until recordation is complete.
Number.Rev 1. Comment partially addressed, once the proposed offsite easements are recorded please
revise the plan to provide the DB page information.
Response: Acknowledged,information will be provided when obtained.
27. [32.6.2(j) & Comment] Please show utilities and associated easements on the landscape plan to verify
that no conflicts exist with planting locations,
Response: Utilities and associated easements have been shown on the Landscape Plan(sheet 6)to
show no conflicts exist with the planting locations.
28. [32.5.2(n)] Label and provide the dimensions of all proposed improvements.
Response: The dimensions of proposed improvements have been shown on sheet 5.
NOW °elle
aka T r
INTERNATIONAL
Mr. Christopher P. Perez
November 5, 2014
Page 5 of 11
29. [Comment] As proposed off-site easements are required, easement plats must be submitted,reviewed,
approved and recorded prior to Site Plan approval. Deed Book and Page reference information of each
recorded easement shall be listed on the site plan. Specifically for: "Proposed 20'Permanent
Easement", "Proposed Variable Width Permanent Easement" "Proposed 10' Temporary Easement",
and "Proposed 20'Landscaping Easement"on TMP 093A1-00-00-00400. Please submit easement
plat(s) to the County to facilitate these items. Also, for the landscape easement provide a maintenance
agreement which shall be reviewed/approved by the.County Attorney and will be set to record with the
plat.
Response: As discussed with Mr.Perez,easements plats will be provided to Albemarle County when
acquired. The plans have been revised to show a DB,PG reference that can be updated when recordation
process is complete.
Also,if any work or easements are taking place on TMP 07900-00-00-025B0, which is owned by Robert and
Carolyn L1 V crUgood,such easements shall be recorded as v✓ell.
Response: There is no proposed work or proposed easement on TMP 07900-00-00-025B0.
Rev 1. Comment partially addressed, once the proposed offsite easements are submitted, reviewed, and
recorded please revise the plan to provide the DB page information.
Response: Acknowledged,information will be provided when obtained,
30. [32.5.2 (lb)]Scale. Pages 6, 7, 8,9,and 10 all utilize a scale of 1" =25'; however, this is not an acceptable
scale.Please revise to provide an appropriate scale of either 1" =20' or 1" =40'. Revise.
Response: As requested, scales have been changed to 1"=20' for sheets 7, 8, 9, 10 and 11 (previously
sheets 6-10).
31. [3 2.5,2(a)] General Information. Throughout the plan there are notes which reference various sheets for
details to tank,pump, and altitude and pressure sustaining valve vault assembly (see sheet 8);however,
none of these sheets or details are provided in the site plan. Either pros idc the sheets or omit the notes on
sheet 8.
Also, in total the cover sheet lists 32 pages; however, only 15 pages are provided in the site plan set.
Please explain why these pages are omitted from the plan.If the pages are to be provided,please add them
to the set.If they are not to be provided, omit them from the sheet 1 index of drawings and re-number
pages appropriately.
Response: As requested,only sheets for the Site Plan are included. A total of 15 sheets comprise the
submittal.
32, [32.6.2(g)] All water facilities to be dedicated to public use and the easements for those facilities shall be
identified by a statement that the facilities are to be dedicated to the Albemarle County Service Authority,
Response:Acknowledged. A note has been added to sheet 2(#22)stating that"All water facilities and
water line easements are to be dedicated to the Albemarle County Service Authority". The utilities and
easements are shown on Sheets 5-11.
33. [32.5.2e,32.5.2p, 32.6.2(j)], 32.7.9.4] Landscape plan. A landscape plan that complies with section 32.7.9
is required prior to the Major Site Plan Amendment approval. The landscape plan shall verify that the site
satisfies the minimum landscaping and screening requirements of Section 32. See comments below.
Response: The Landscape Plan has been revised based upon discussion with the Albemarle County.
Rev 1. Comment acknowledged, See the following comments.
Response: See Responses below
'Vow wri
I N T E R N A T I O N A L
Mr. Christopher P. Perez
November 5, 2014
Page 6 of 11
34. [32.6.2(j) & 32.7.9.4(b), 32.7.9.7] Screening. Existing trees may be preserved in lieu of planting new plant
materials in order to satisfy the landscaping and screening requirements of section 32.7.9 subject to the
agent's approval. Specifically some of the existing trees within the proposed 20' landscaping easement
are between 20' -80' tall and have a mix of deciduous and evergreen trees present. Please verify the above
on the site plan on the existing conditions page and landscape plan. Upon verification, it may be
appropriate for the existing trees to be preserved as undisturbed buffer area, as mature trees will provide
superior screening of the tower from day one. If the existing mature trees within the 20' landscape
easement are determined by the Agent to be adequate to screen the facility the following shall be
followed:
Response: Existing tree information is provided for the 20' landscaping easement on the existing
conditions sheet and the landscaping plan Sheets 3 and 6.
The landscape plan should show the trees to be preserved, the limits of clearing, the location and type of
protective fencing, grade changes requiring tree wells or walls, and trenching Cr turn l ing proposed beyond
the limits of clearing.In addition, the applicant shall sign a conservation checklist approved by the agent to
insure that the specified trees will be protected during construction. Except as otherwise expressly approved
by the agent in a particular case, such checklist shall conform to specifications contained in the Virginia
Erosion and Sediment Control Handbook, pp i11-284 through ill-297, and as hereafter amended. This
checklist must be signed,dated and included on the plans.
Response: The checklist has been signed and included on sheet 6.
Rev 1. The existing mature trees are adequate for screening purposes and shall be preserved in the off site 20
foot landscape easement area for screening purposes. Due to the planned grading of the adjacent lot, this site
plan shall provide a note on the landscape plan that states, "If the existing preserved trees within the 20 foot off
site landscape easement are cut down or die, the easement holder(ACSA)shall he required to revise the site
plan to plant the required ed sc,eening per section n 37. 7. 9. 7 of the 4lhemnr-le("twill,ordinance,"
4l.cn, it is udvi.cable that the existing preserved trees canopy's be depicted more accurately on the site plan. This
,,,;11 t,.,m aranxint of v,r-oorairra whorl'nr1'ielori,1c tlto ,^o,"ifrl
exception request.
Response: Note added as requested and the tree canopy has been modified to more realistic
dimensions.
35. [32.6.2(j) &32.7.9.4(b), 32.7.9.7(d)] Minimum depth and spacing requirements for a planting strip or
existing vegetation. Ifonly a planting strip or existing vegetation is provided as screening, the planting
strip or the existing vegetation shall not be less than twenty (20) feet in depth. Ifa planting strip is
provided, the plant materials shall consist of a double staggered row of evergreen trees planted fifteen
(15) feet on center, or a double staggered row of evergreen shrubs planted ten(10) feet on center, or an
alternative vegetative screening approved by the agent.
To meet the above requirement the landscape plan shall be revised as follows:
• Within the side yard,replace all the 'Nellie Stevens Holly' with evergreen trees, it may be appropriate
to continue utilizing 'Leyland cypress' in place of the 'Nellie Stevens Holly' or the applicant may
choose to utilize some other approved evergreen tree. Revise to assure double staggered row of
evergreen trees planted 15' on center. Also, assure that this planting strip is a minimum of 20'deep,
currently its only 14' deep. Also continue the planting strip another 25 feet to the other side of the
'Altitude and Pressure Sustaining Valve Vault Assembly' to completely screen the tower from the
r.re NMI
I N T E R N A T I O N A L
Mr. Christopher P. Perez
November 5, 2014
Page 7 of 11
road. Revise.
Response: The plan has a 20-foot wide planting strip along the property line. The landscaping has
been revised to provide two rows of Leyland Cypress at 15' on center. The rows of tress have been
extended as requested to provide further screening of the tank. No trees are planted over the water
main.
Rev 1. Comment addressed, staff can approve the Leyland Cypress plantings as depicted;however,per
discussions with Elaine Echols and Ellie Ray(Landscape Architect)they recommend that the double
staggered row of Leyland Cypress be replaced with a mix of(Pinus Strobus Eastern White Pine)and
(Cryptomeria japonica &cvs), at a min of 4 foot tall at time of planting. This is being recommended as
Leyland's are known to fall down due to wind and are known to sustain substantial damage due to ice.Also
the mix of the two evergreen tree types is being recommended to aid in the appearance of a more natural
look. Staff expects that the suggested plantings are expected to be looked upon more favorably by the BOS
during consideration of the special exception than the Leyland Cypress. Please advise staff how you wish to
proceed. Revise if appropriate
Response: Revised as noted
• Within the proposed 20' landscape easement, if the existing trees are determined not to be adequate or
the applicant is unable to preserve them and instead goes with new plantings assure the following is
met. Provide another row of evergreen tree in addition to the row depicted to meet the minimum
screening, it may be appropriate to continue utilizing 'Leyland cypress' in the second row or the
applicant may choose to utilize some other approved evergreen tree. Revise to assure double staggered
row of evergreen trees planted 15' on center.
Response: The landscape plan(sheet 6)has been revised describe the existing trees and provide a tree save
area to provide a natural buffer.
36. [32.6.2(j) & 32.7.9.4(b), 32.7,9,7(u)] Screening. The proposal includes a detentaon pond towards the
southernmost boundary of the property This feature is required to be screened from residentially zoned
parGCt, 3� 9( )3 Also, with the p ,l clearing is taking place to the property line adjacent to
an pGr✓._.1./�UJJ. �1aJV� 'vv . �..,pr:;�:vo .. ....:.b i., .... ..b Y property __.
residentially zoned laud, tins k.,leatin8 I.AUJGJ illc 1l ai iilaib' lot to be visible fro-m uic, .'.a.v......u..y �..,...... .........
For both of these items provide screening which meets the requirements of32.7.9.7.
Response: As discussed with Mr. Perez,the alignment of the water main on sheet 10 has been revised to
provide a natural wooded buffer to screen the bioretention facility.
Rev 1. The minimum depth for existing vegetation, if only a planting strip or existing vegetation is provided as
screening is 20'deep. In order to meet the requirements of the ordinance the applicant can either provide 20'
deep area of existing vegetation, or provide the 10 feet of existing vegetation as depicted and then add a 4'- 6'
tall slightly opaque wall or fence to this area.
Response: The site layout has been revised to provide a 20' deep area of existing vegetation
37. [32.5.2(n),32.6.2(k)& 4.17] Lighting. Is any outdoor lighting proposed with the site plan? If so, all
lighting (including building mounted fixtures)must be shown on a lighting plan that includes a
photometric plan, luminaire schedule and cut sheets for each proposed fixture.
Response: A lighting plan has been provided on sheet 15 of the Site Plan submittal.
Rev 1. Comment partially addressed.
On the lighting plan provide the tilt of the fixture, which must be 0 for full cutoff.
Also, on the plan provide the required lighting note: "Each outdoor luminaire equipped with a lamp that emits
3,000 or more lumens shall be a full cutoff luminare and shall be arranged or shielded to reflect light away
Michad 13a
INTERNATIONAL
Mr. Christopher P. Perez
November 5, 2014
Page 8 of 11
from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires
onto public roads and property in residential or rural areas zoning districts shall not exceed one half
footcandle."
Also, on the plan provide the light's maintenance factor, which must= 1.0(also known as a light loss factor of
1.0)
Response: Comments addressed as requested.
38. [32.5.6(a)] When revisions are submitted,provide a date and description of revision specific to
submittal to the County.
Response: A revision block has been added to all sheets that were revised from the previous submittal and
detailed descriptions of comment responses are included in this letter.
39, In accord with the provisions of Section 32.4.3.5 of Chapter 18 of the Code if the developer fails to
submit a revised final site plan to address all of the requirements within six (6) months after the date of
this letter the application shall be deemed to have been voluntarily withdrawn by the developer.
Response: Acknowledged
7‘3.77 cnr r rFAvT
40. [Comment)Does the applicant plan on installing a permanent security fence on the property of the new facility?
If so,please depict and label it on the plan. If a fence is proposed, staff suggests that it be located as to not be visible
from the road and from adjacent property owners. For example on the rear yard it should be located on the property
line where the temporary protective,fencing is shown.And for the side yard the fence should be located in_front of
the double staggered row of evergreen trees(closest to the tower).Also, if the fence is to be chain link, staff suggests
it be a green fence.A wooden board fence is preferred but not required
Response: No security fence is proposed.
41 /C'oin;nentJ Once revised please submit 4 hard copies of the revised plan and an electronic PDF copy of the p an
for use by Ciauae£te Grant during the CCP review by the Planning Commission.
Response: Acknowledged
Comments from John Anderson,Albemarle County Engineering
(A site plan is a record of zoning compliance on the property. It should not include VSMP plans.)
Response: Per discussion with Mr.Anderson on September 9,2014,all erosion and sediment control and
stormwater management information and related sheets have been removed from the Site Plan submittal,
Code Chapter 18 section 32,part of the Zoning Ordinance.
1, Title pg.-Label major roads on Location Map to help orient project.
Response:Major roads have been identified on sheet 1 in the Location Map.
2. Label existing parking,East Rivanna VFD. sheet 4 and across site plan sheets.
Response: Existing parking lot has been labeled on sheets 3 and 5.
3. Revise Legend,sheet 2,to include SAF,TS,MU, and TP(VESCH symbols).
Response:VESCH symbols have been removed from the Site Plan submittal.
4, Show Managed Steep Slopes on TMP 79-25A on sheets 4,9. Ref.County GIS,Overlay District, and §8-
30.7.5.d.-Re-establish existing grade;do not construct fill or cut slopes on Managed Steep Slopes(none are
proposed).
at haet.Ba er
INTERNATIONAL
Mr. Christopher P. Perez
November 5, 2014
Page 9 of 11
Response: As requested,Areas of managed and/or steep slopes have been shown on sheets 3,4, 5, 7,8,9,
and 10. Refer to the legend on Sheet 2 to identify the symbology.
5. Provide pipe end wall and revised surface contours for proposed 42'L pipe,sheets 5/22, #19, below. Covering
exposed pipe(with riprap)is an unorthodox approach. Propose final contours that accommodate pipe with end
wall design. Eliminate need to partially embed,leaving exposed,28 LF± of 18" DIA concrete pipe.
Response: The 18"storm drainage outfall on sheet 5 has been revised to include an end wall, Additionally,
the alignment has been changed to allow the outfall to be directed to the existing site drainage swale.
Sheet 13 provides a profile of the storm pipe and associated structures.
6. Sheet 5:It appears that Ex.pavement(VFD) will be cut to install two 18"DIA stoi ni pipes (124', 42'). Furnish
pavement cut,repair,depth details. Provide accompanying pavement notes.
Response: As requested,a pavement repair details have been included for repairs to Steamer Drive and
Glenmore Way. A pavement repair has also been included for the parking lot on the site that will be
affected by the installation of the 18"diameter storm pipes.These details are shown on sheet 14.
7, If new easement is required between Glenmore Way(inbound/outbound)in the area north of Steamer Drive
(sheet 6), show proposed new temporary and permanent ACSA utility easements.
Response:No easements are required between Glenmore Way(inbound/outbound)in the area north of
Steamer Drive as this area is right-of-way(ROW). The ROW in this area is now clearly noted. New
temporary and permanent ACSA utility easements are shown on sheets 5-11.
8. Sheet 7:Locate drain field on TMP 093A1-00-00-00400 if drain field boundaries known.
Response: The approximate location of the drainfields for TMP 093A1-00-00-00400 has been shown on
sheets 3 and 7 as requested.
9. Sheet 9/10:Confirm variable width permanent easement is proposed between bracketing,20' wide proposed
permanent easements.
Response: The , of cascmcnts has been modified with ACSA's concurrence. Permanent water line
1�GJt.1 V1iJG. The depiction J>,�ao�.,i.,i.w has been..,., . .,,. .. „ ., Permanent line
easements are now 20 wide.
10. Edit notes,sheet 18,to remove reference to"Station X+XX,""Sheet XX," and"XX-inch culvert."
Response: Sheet 18 has been removed from the Site Plan submittal. The sheet will be provided
with the VSMP and the references will be corrected.
11, Sheet 18:Revise note to meet VAR10 inspection frequency requirements(VAR10,Part II,F.). Link:
h i.... \?. i.'_ _]-<.r-1 __. - '41,7 4 'nitin'a u..i�1�'ni \'.11ir)net11ii!.C,111',1111(i 1(t'ir C11`0
nevi it atin\.
Response: Sheet 18 has been removed from the Site Plan submittal. The sheet will be provided
with the VSMP and the note will be corrected.
12. Sheet 19: Label Glenmore Way(cul-de-sac).
Response: Sheet 19 has been removed from the Site Plan submittal. Glenmore Way(cul-de-sac) is labeled
and shown on sheet 11 of the Site Plan submittal.
New Comment—Label for 4°Manhole obscures text(sheet 5),•please shift label.
Response: Comment addressed as indicated
Comments below pertain to required VSMP application:
Response: Comments 13—32 will be addressed in VSMP Submittal.
`r ..r
INTERNATIONAL
Mr. Christopher P. Perez
November 5, 2014
Page 10 of 11
13. Submit V SMP Application,ref.§17-401, 17-402.
14. Label feature that appears to be a stone entrance,sheet 5. Feature does not appear to be a CE or
generator pad(S end of Ex.parking lot).
15. Sheet 7:provide CIP at Ex. 18"RCP storm drain,Inv.388.80,sta.+48,after 12"water line installation is
complete.
16. Confirm that project limits of disturbance=1.497 Ac(total Area of Disturbance across all plan sheets. Ref. sheet
18,Existing Site Conditions).
17, Provide orange safety fence(SAF)between project limits and areas accessible to the public:Fire Station,
Glenmore Way(including cul-de-sac),and Steamer Drive,per detail,sheet 20.
18. Provide L x W for riprap outfall protection at 62'DIA, 35'Hwatertank,across plan sheets.
19. Provide L x W for revised riprap outfall protection at proposed 42'L @ 2.2%slope 18"DI.A concrete storm pipe
(sheet 5,22).-see #5,above
20. Show on-site stockpiles,if any.
21. Identify off-site stockpile,waste,or borrow areas.
72. Revise Management Strategy,Note 6,sheet 18,to reference plan authority authorization and approval
needed to remove ESC measures. See Sequence of Construction Note 10, sheet 23,as template.
23. Sheet 18:ACDSM General Construction Notes for ESC plans now number 1-20;please replace 1-22. Link:
http://www.albemarle.org/department.asp?department=cdd&relpage=4447
24, ESC:Revise CE labels across plan sheets consistent with Project Narrative, Structural Practices Narrative. Revise
CE label to:temporary paved wash rack(PCB). -see sheet 18.
25. Replace or supplement CE detail,sheet 20, with paved wash rack detail,per ACDSM,below. -see #24
26. Sheet 22 appears to provide sufficient information to evaluate SWM plans against Virginia Runoff Reduction
Method Redevelopment Worksheet,but reserve comment on SWM plan not yet submitted.
27. Sheet 22:Show bioretention bed W x L dimensions in plan view: 13' x 26'.
28. Sheet 22:Provide 1.1 CFS 100-yr storm event calculations.
29. Sheet 22: Specify frequency for 0.5' depth of water above the bioretention area.
30. Sheet 22:Provide sizing calculations or design summary for grass swales leading to bioretention bed.
31. Submit SWPPP for project,ref. §17-405. LOD,item#16, VPDES Registration statement should match LOD
shown on plans.
32. SWM and ESC plans may not include site plan. Remove site plan sheets trom S w IVI L,5t_,plans. A site
plan(Amendment)cannot be approved as part of SWM/ESC Plans.
Comments from Troy Austin,P.E.,VDOT Land Use Engineer—Culpeper District
I. Details for appurtenances that will be located within dedicated right-of-way need to be included on the site plan.
More specifically,the details forPRV vault and the air release assembly need to be shown on the site plan.
Response: As requested,details for the PRV vault and air release assembly have been included on sheets
12 and 14,respectively.
2. The preference is that the wet-tap to the existing 16"DIP waterline in the cul-de-sac of Glenmore Way be made in
the shoulder rather than under the asphalt of the cul-de-sac.
Response:Performing the wet-tap connection outside of the pavement limits was examined during
design.However,there are existing water service connections that required the wet-tap to be performed
in the pavement.The approximate locations of existing water service connection have been shown on
sheet 11 for clarity. During construction,ACSA will oversee the work and evaluate if actual field
conditions allow the wet tap to be moved to the shoulder.
3. A Land Use Permit will need to be obtained from this office for all construction activity occurring within dedicated
right-of-way. This permit should be obtained prior to commencement of construction activity.
Response: Acknowledged
w✓ wwie
&eelB
INTERNATIONAL
Mr. Christopher P. Perez
November 5, 2014
Page 11 of 11
New Comment.
1. For additional protection of the PRV vault please provide reflective delineator posts at its corners closest to the edge
of pavement. Since the top of the vault will be exposed 6"it is felt that the delineators will guide operators away from
the vault during mowing or snow removal operations.
Response: Bollards are provided at the corners of the vault.
Building Inspections-Jay Schlothauer
1)No comments or conditions.
Response: Acknowledged
Fire and Rescue-Robbie Gilmer
1) No comments or conditions.
Response: Acknowledged
E911-Andrew Slack
1) Approved
Response: Acknowledged
ACSA
No comments provided as they are the applicant.
Response: Acknowledged
Thank you for assistance in this project. If you have any questions or require additional information,please do
hesitate to contact me.
Sincerely,
MICHAEL BAKER JR.INC.
Chip Votava,P.E.
Project Manager
CFV/rfg
*41 tir/
Michael Baker Innovation Done Right...We Make a Difference
INTERNATIONAL
March 25,2015
Mr.Christopher P.Perez
Senior Planner
Department of Community Development
County of Albemarle
401 McIntire Road,North Wing
Charlottesville,Virginia 22902-4596
RE: SDP-201400054 Glenmore Ground Storage Tank,Pump Station,and Water Main Project At East Rivanna Fire
Station—Major Site Plan Amendment
ACSA Project 2013-04
Dear Mr.Perez:
The following responses to County comments,dated September 30 and October 3,2014,are provided. All former
comments and responses are included in our response letter. New comments and responses are provided in bold
text.
Comments by Christopher P.Perez, Senior Planner,Dept.of Community Development
•
c u'.
Rev 3.The Special Exception for setbacks was approved on Dec 3,2014 by the BOS
Assure the following note is provided on the cover sheet of the site plan under setbacks:
272 Bendix Road,Suite 4001 Virginia Beach,VA 23452
RPF: �m IL PA u ,/SALLYPORT MBAKERINTL.COM
Office:757.463.8770 1 Fax:757.463.0503
or v.✓
Michael Baker
INTERNATIONAL
Mr.Christopher P.Perez
March 25,2015
Page 2 of 12
"Setbacks for the Water Tank are 1 to 1 based on tank height. The tank is 35' tall.
Special Exception was approved on Dec 3, 2014 by the BOS to allow a 32-foot side setback and a 20-foot
rear setback subject to the following conditions:
1. The Albemarle County Service Authority (the"Authority")shall obtain a landscaping
easement (the "Landscaping Easement") on Tax Map and Parcel Number 0931A1-
00-00-00400 in the location shown for the"Prop. 20' Landscaping Easement"on
the Site Plan—Grading Plan and Landscaping Plan(the"Plan", last revised
November 4, 2014,attached hereto, subject to the following:
A. Any tree shown on the Plan whose trunk is located within the Landscaping Easement shall be
preserved and maintained by the Authority;
B. If any tree within the Landscaping Easement dies, is removed, or is otherwise cut so as to no
longer provide the screening intended by this condition as determined by the Director of
Community Development, the Authority shall promptly submit a landscape plan that complies
with Albemarle County Code§ 18-32.7.9 and which will provide screening as provided by
Albemarle County Code § 18-32.7.9.7;
C. After the landscape plan is approved by the County, the Authority shall install and
thereafter maintain any landscaping shown on the approved landscape plan;
D. The Zoning Administrator may allow minor variations in the location of the
Landscaping Easement provided that the screening purpose of the Landscaping
Easement is satisfied; and
E. The deed of easement and easement plat for the Landscaping Easement shall be subject to
review and approval by the County before they are recorded in the Clerk's Office of the
Circuit Court of Albemarle County,Virginia.
2. If the Authority does not obtain the Landscaping Easement as provided in Condition 1, it shall:
A. Submit a landscape plat that complies with Albemarle County Code§ 18-32.7.9 and which will
provide screening as provided by Albemarle County Code§ 18-3 .7.9.7 to the equivalent extent
practicable that would have been provided under Condition 1,as determined by the Director of
Community Development; and
B. After the landscape plan is approved by the County,the Authority shall install and thereafter
maintain any landscaping shown on the approved landscape plan."
Response: Notes have been added as requested.
`r.r,
Michael Baker
INTERNATIONAL
Mr. Christopher P. Perez
March 25,2015
Page 3 of 12
,III! 1 :,tt
1 . r ( I�'!t tul I`!jt,"I:.,. .: I',t .,,� :i;, li.j
H -.I ■:!„I I II l' Srtll(!. ii, j' , 11, . I- . I,i
t l I 11'1:`s , Ol,. III ::I IiI- •II'. '�,li: .�! :I•��..,., If Iu , :i t Ir
'i II1” „i`li „ ;i;. :
II, I,tl -I C'llifI: i 1 `I: .!` 11,,, I: . 4. ,i 4..4 , • 1:1;,1;1 „ fr; ,•I_..f
I',rt'L' "11I i I 'I.!I' !I i Iii
i', `} =;I ! {I,+ ( .t 1, }. ,1., t( i,', I!'. 111;i: !'},: , '14.1 r I I " I _,,I, f f .,: ul!`•'I
)I' . .I 'i t' .• 11,111 II',41,141. uI I,. ,
..1!I \I Ult,1;1�\ li!. Illit „I .I. "!t } f' , ' .n ;, (n .!; .., 1 !' illil` '4'1.14Ir01 ,,:
V\01, . I !III I1 'It, 1 \,i. I . I'll" .I' I ,:I`' :, !, If f HI, , ,:, i .1 I':,,,1 .,;"
H!; '1 ! ' H . ,,,11•.1 r,: i'I: ,ttl '
I'■1'..11■11,' II, ,.1,'i!, :� :,i, `,11,'11 ''11;1rl'i■i!..II', \ I :_ f! at ',l i !I!. III,( Il�' 1 I I
L.-I to 1, .. II1!f .,ii •II ( If' ..,, i u. ,ii-:: 'I t '-1In • , , '
I 1.1 .'I , -u!t i., ., �!If I. :11 .'1, , t 4";I'
�•
11
! u •••1, .;
I, • • : ,••lf. : 11:11 d i
' 1. ,. u 1 ii, I' .'n i, I! . i .
Michael Baker
INTERNATIONAL
Mr.Christopher P.Perez
March 25,2015
Page 4 of 12
yl"ltll, il, lil li 1111,'0: 'I'
iIL .?t• �! !l ;
••\ 0111- , I;,! ,,,!Ili, . ; , �� •Ili
:t �, I!ii'i i i+ ,I�IF Ii.�:ll !� ,a 4i1 ; ii .. . 11,1;
;,I, ,. 'f,E Ill }�„ ■II,;I(!• ,!
f1,11, Ii,.. ,,is "W. IIIIti'il ,'i !+ I' 1.'l'. 1, ,f III 1�
I i, t 1,,H` i• ` `.! 1 ltl,1''.i , 't ill .111
,I1', .I\
.,.11;t lii ll is ,' {.111' \;;,,
1 ,,t,:i hlli;t I t4-u :. i
! 1, u'. I,.,. p.,01!11 ;! 1,_ i ,',
1H !HUI: ;1.■141 , .I l; �, +,.. , ;w 1'1, I,1. „ ,fi "l
Il' (i;l I,. �i`i j�I4 1`t—..41i '1(1 "[:,1;, .,1!i, ,. , , .. II H., ll�, ,4 i .i1 tll—I('I�. il�+• 1.�t
I: 1IR H■.1 il,t_ ul: i,', ., t'l I, I !s _ ii •.14 1 .,;un-t,' I'uli.!u•. 'I :, ;1,< !+I ';'++ ,'.i ,.n„1,
- � ,III 111- l' 'I: ! f +' i,ii J �7H''li. ,il , 1” 'R I i4 , , , : •
1 I
.. ;Ii,"I.. 11 iil. •, lilt .f', li— 'lei, .. !'�. ,i: ICI li, .r
ll; i ii i!. ,. —!i, , ;,{171'. rj. 1 - ,i .. 1 ., i ti, - - '1; is ..
•
Michael Baker
INTERNATIONAL
Mr.Christopher P.Perez
March 25,2015
Page 5of12
i ! i, ili, I.: .i .,l I;.. Is
ii :, , - :,. ,,� : li li , 1•• '�I:I E'. lil,li l,�. �i i•, �1; �:
1,11 I ,, I brill
;,^, , ,i, a ni I;. I ,Iri !nl ii, I' ,, Is r 1, .i -:i „n,i II. 1; „ - „ , , : . .
'i`. iiGU (1'i: , ,,:i', !i1 I „ ,:i` , ,•.I,tl : i .i. , „ I,(ti !!' ! .t (!., 11. , i ■I':,
..i .. �', leis!', i!t , .li �. I,. iil' nn., _. ,�„ , i - - .i•i:,
. -,L, .1 '.,L ■,I
Rev 3. omment still relevant. Once the proposed onsite and offsite easements are recorded
ple e revise the plan to provide the DB page information. Please be aware that what is
picted on the recently submitted easement plats for the project do not match that which is
depicted on the site plan.Assure these two documents match.
Response: Easement labeling has been revised to match deeds and plats. Deed book and page
references are now included.
Michael Baker
INTERNATIONAL
Mr.Christopher P.Perez
March 25,2015
Page 6 of 12
L,1 1 111, I: II { \11" 111.'- ,F,..,, !.,. I';1 ll!• 3.i
I!'. 1 ....1` I.• i 1. ,'■•
I.,• Ht il!. II ti + .;I, , .`1 , 1., , ill .
1111:.1 11', 1 IL, h,.'11 i. 1-'• In i, • . 1"( 1 11 . ,I'11 • .1r h.1._ki k' II t,,. •,,..•r' `1;
.1• • 11 '1'. 11 ,,. +, is n'I'I` 11ik- i�Il,lf! 1`111, •,,1 1 \II' • , ,I 1.,11 .11 01111
11 1 1%1 1'1'1. ...11 ,, .. '-11,111 i„ 1..1;,
i';-.•1'■∎i: 111,1k 1 1'I+ -1.11.11!1 1 1 i' '1' •' ' 1 .. H 1ni 1'( i
1.', , • ,,1111■11 1' „„ • .;t1t 11 it l !' 1."'.,1 •II ;I' �.I ` .I .. I' '1i. •7111.1
, ;+', . 1"' +� -� ,, !�,. 1. i1�{•11., i'). I'. . .r f
11 ;{: 1 •{ 11. lit i, II 1 1 , . ,.i• ,i 1,.
Rev .The proposed offsite easements have been submitted and are being reviewed.Please be
are that what is depicted on the recently submitted easement plat for the project does not
match that which is depicted on the site plan. Assure these two documents match. Once they are
approved and recorded in the clerk's office please revise the plan to provide the DB page
information.
Response: Easement labeling has been revised to match deeds and plats. Deed book and page references
are now included.
tit,,! 1' !I'1 X11 , it will ' I i I i ll 1•- 1i
.. ,. 1. i. •.it:i ..��, • ! - 11.,, • t; - '1. • ,1, ,
1',
1.,i 1. i, ..'I i,..��1 I ..I• I. ;i, i!! .i" 1' .j
,. 1! , • . 111 i, ., :1. ,. 1 ,f '1' ,1.. i: iI�, . , t'. , , , 1It .
Michael Baker
INTERNATIONAL
Mr. Christopher P.Perez
March 25,2015
Page 7 of 12
lu! 2.,11111., 1..!k}•J :j' it: ,l1,.1 ., ,. I,E t„ , HE, , i It, `' . :11E1,°:li 1„ j1,
Ij 1.2 ,1. ' ! j 2'12,I- I } � ., .� 12°t 1! I LJI •2 It.. 2 12; ,12 . i,- ( ' 1.i
1'11:1,. li•t..,!.,.i,,,.. NJ,
-.I.i • ' !(, , - i1. :.; ' ,• 'L_tl t,i
• 'I 'li , Il, „i.i`i'. lilt' i,.:,t+`;,1}li[I, 'I'1 •;t',;:. :5:. 11` : i, - i .,■ (li,
.- '; ,.1 � tip', -;li;,'jj\ - , , I!1'. ,.il:. I•. ., � I! � -'i1 i ,,, ,. i1 L.
H.!;.; I}i. I'tii :.it , .;' „ I }' .i i;�(,i ,I I''
1 Il ;W..; ' , .� ,,.. il' !'• !,'
{; - H1I _ 11,,111 ,i , 11, li 1' s i, ;HI' . ii. Il. . ill ii ;1• III'
;t1k, ;!, l ;t!1 � ,'; ' il, �,:, 1!1 ,� t', '' j.. • !i ,i i 't I:. ;hi., I�. �,d I
t i
.1,1!,t I!;,.i a'.. I`. Ilk.I . 'I', i! ! II; ;,I' !il, t '•.1-.i II .
,111.1 II!, :!lt.}`, ,l. PLO] i;, c ,.,n
! ii, j„ ,:}` Kilt ° „I!1 -I. l,. lt,; 1;, •■ I , ,, ! lil' , i-. } t '
iI I!„ !, il, ,ii: ;d, li,L;';', „(!11!1111, 11H ', II` .,, .;.HE 112, EL2 HIE;j2 it!:,II, E2,1,2 L 'f: 2., ,.
}i1iL, ;H( }• •2211 Ili , ,},}1111111 ;I1, I p(1}It,•;E; LI:,11I .I ,;, , ,1.i , , , , I , i,il., 1 t EN 2, S i ;It . EE; i,
1:, . 11E. 1I„1 I i.; 1 11 j'H j 1 1,'I:, ICI I I, !t i, 1 1 , ; 1 , , {!-: i' .11E2 . !• .s ,
1: ;i„ ,1'- '1, I .III :{ H LLILIE I,'.c Ii'. '.I'. .. ;2! .1, , - 21;2 21• ;1E1, .. , . .
! ,t ,E!I. ,1..11 ':l; i Uilll,;j It,tlull,;I;,t, j .'j ll:.:
, 1E 1 11.' 2 ;� ,,,X1,'.7 : 1 I„ ' I:( ,
1 i i. 'I:. .!i:'WI.' „ , „■11 ;II, j' , . ; t. • .. , '1 i !Ir !I: ,�'! ,
'i ;'."-� t•1'. '. '1`. ft, 11111 , (��,.. ,. ! j„ t1 , I
•.! i. • 1 22 ;111E ...i, 12.2 i, , 1 „ 11:E'
Rev 3. O eet 6, please omit the previously requested note to avoid conflict with the
con ' ions of the Special Exception approval by the Board of Supervisors. Remove the following
to from the plan: "If the existing preserved trees within the 20 foot off site landscape easement
are cut down or die, the easement holder(ACSA)shall be required to revise the site plan to plant
the required screening per section 32.7.9.7 of the Albemarle County Ordinance."
Response: Note has been removed.
•
•
•
.4110. •4•I'
Michael Baker
INTERNATIONAL
Mr.Christopher P.Perez
March 25,2015
Page 8 of 12
( itL ?!,:. :11' ',c ill!i;.'![: ?I( li !,tli,l•., , , H '. ! !' f . . ;,,11-, •
j.. , 1111!il', "li?.,IT: ! i,HiJ l \}1 :, 1 I i ., _ !!, :! ■.I :I.
(:,
11It, 11 s, } !;4;Ii, , ! rl,!:lt'1 i•, . :l .ul: l . • i,. n; .tJ •1' , !,
(L .I, si'(I : ,'ill ll; :, :�4' -' .. �i!?I, •;j;l' ,',I;.'4 ,. . : : 'i;4' 1'I; t'!
`11111';1; ! i'i,_ .tilt ',u•lHirli,lt • .n,i,i` h. i\
1 I ,
:., I�t•L`. . 111' !s!,1?I II;I' ,l 2II-It1,:t `t jilt {` ;I I:,lI; .!III' :,, ,. Ili. Ilit,l, i' ,11 . I ,s. ,n :1`ll:.
I,t\ :. I:. . i`. ,I „ . 4t \I(!l \\t) itl`.\ „1 I .■!!,_ f t.'; ' ! 'Ii s, ,141 111, !,:, "'i it " 11i41‘,. 1 1t l 11
."•,11 !1510 cl 'I lt'li,l, •!,ti Is }:1(I`,l(N' .ii I!,'i 11'...' ( I .t l..01, lI„ .:t !` 41:_,. 1'\: ,
1u■,1'4
i.t 1 1 , sII 11 ;ICI(I Il.,`.'.I. `l1.i11 I ;ill ,:1,1'1t''1c 111. 1 i 1111 1 I/5 }'II, Ii ,. =1I 11t It t!
tll�, ti• ;1` Ill: 1 I,I!I'. I (IIs;I` ,:ill) 11!!4' I<.,\ (! ;411,1., ;i■Ti'
t\ ,,1 I \I;tlR1 ( ,}\?t ., h:. ll!.I.1._ ,I ,\lilt ,I I :: , . ! :;'a;!! u' I , 4. , . \\ 1;11'
t' 11,! 4 'I. .,I J`i:1:41 X11•' 1 141 14. 4: {l(I
1 c .?1101 ,n, ! I ,_ti I,) l',11 (-1()"\\ (III 1st t,•. 111,1 ,,I:.t ,4i. :. .. •115.11!; „ 1,.:4!t. '4' ,{Ii ,• \!.
II U.+ I',I . i . ,,,. ,., ,•It , •„!, 1 ■ 'c': 4 !14, 'I 1,1 1, 1 ,, II:, -
,,(i l 4 !.;l ilr. `u1 `l,, i'I, !11144' .tic .i !., .. i'. • , ' ,II, (''I' 1. !
:111,1.I,. ?I ttl III' }'1.'1;11 t I'iI, tl ;il I!.: ! ' L,,. i i ,4 I 4 it I:
e 0, I!, 1' "'!t'tt ;11 ., 4. ! I: I•, Ii •!i•
:1,. Is .`1'. s I ill'. .i1 11'0,4 ,. .,,t I'
Is II'Iii It ;ft.% 15. .'1?!-' 'is ? ,I it�tul'. Iii!'' i ' ,if, li '!:_ _ 1'150
i t 'i. !(' 'I I!I t!
•
Michael Baker
INTERNATIONAL
Mr.Christopher P.Perez
March 25,2015
Page 9 of 12
11;111Hk:ilk. , [H,11c- I I
I,
• , I_ , 11■1.“ L„,.i,)11\
II , hi, t■ •I
,l( ' , , CL V H H
• HO I ii IVV C I Willi ,LI ,:„. H VI
itild ti\ it ...it,. • C IV IC I I Ii I
II• 1111C'' t'l . , :t.
kit. Ilk Itt.tliC't illtitlIII 11.'ht I L.,(II'. i I
1 ' lilitit it.tit:. `.1
ftt•t '\\ it. ttti.1111111111'ti. 1,•.■\ I.:. .1 ; HcH 1.,
\ 1)1,, h IC II I CIV VI , VV VII ..i- :LH L,
i.1.1;■II. I; ci. I '..,.■1.111
VVVIIVV IV IVIVVIIVIIV - IVVVVIV V ,,.1, , VII CVI,•
I V i I HIVVVI ii t. pi lit III tIdIllt v' all Crt ,Iiit't 1111.1, VIVV V I V IV VVIIVV V VVVIVVVVV
1,•;1_1 ,H II ,1
• VII L IV VVIVI I,I CI I I 1 1,!HI]ii VVVVIVVVVVIV I II VVVV V V VI V V VVVI ■V. .1 I V V V 1
; • t ; 1.11 I ,;FC H.11, I ■I i • ( VIVV VVVVIVVVVV 'V I IIVVVVCV 1‘ I
V VIVVVVIIV !IIVVVVVVIVVVVVV HI I. :I ,1.1! VP
■•I'
I I. I •
•
I • • I
I r
r.r
Michael Baker
INTERNATIONAL
Mr. Christopher P.Perez
March 25,2015
Page 10 of 12
��. p■ll' \ ! `-i 11 :ui' '1` 1::1\, f:+ , v !, 11,-n! IL, ' I' 1`I. '. •.l;3 til .'.I.
„ I u I " 11, ii, .t I 4 : .
;r .i l• t. , :,! .'i�I111 ,.t :., ! _ i!; i .j .I. •i I ,1:.
11,1'.‘It tI_ {-_ ::- I i!e�. ,,.. .,.. 1 �..i. i't.." �'. :I '1 1 l
i' :� ; ! !• tit, �, . .-,,,1 it `'}. . . t. ,,1:
!,,!' I ;!1111 11 + ll `1.111!1 .,uti+ .,, }: .i. ? I }I` _ .I!: , i., ,■
,I I'i1:_ ,,. I: ll;t 'ill !,_ ,!!: !ii..'1:ill lil• I11 ,. I' IHt .",,;I .,'.:i, il!' III. „ 1111.l� : , I.!1
�✓ii I ifil.'L'. i!1":',I
t1, 1),011,,11\ ..!?I -.ti i :I.— 1 I .I�t.
It, I ,Ii'!!11 (.l!,i lls,!`' ,,t,11„", 1-11 ti H MR Hal; n , Rd \ H
I I! ■TII,TnIAT,I It ;t11+ ;ll .'I1. :t ,, . < .., , .,, !: II:,
I ITT IT !'I,:1 1 l t' t,1 ,I t t n ,! .. - : •1 !Il';. ,
1
"'III :{ 1`., , ?il(,\ I I}) ,,tII1 it:-I''i! ., I, 1II \ I IM?!;, .
lli�l , ::! i.•.{ ;:I tl I,I I: la Ii I- 1'I i11 Isk t,'1!!I .l i` Ird' ;'�. i:l. III 1 „
1`:. 1','if�. _ it till:'•!l li. ,+ 1'.1\� +It '11 i,II,til {�i i!' 1!, ! ll} ilh1.•,i i.+I i� .,! I, :I!!u I 1)i
.t1 .;I'_ .. \1 -' li1 , life I}! 1HI'+.il �,i ;i l.., 1 I!t 1t1. ,; : !; !'..':.ii 11 ii 1`.11+ 1-■
.',ii•, !,,I i ` i,i, iii`.! Ittl ,i 111 II! i;: „i:' iI t. !: I ?j e ,, , ,il 'i ;n' ‘,11 •I:. .
.t1 I. I" .!,1li. .11;I' .``l , :1 I !I!t•,
I<. i"Ii•t' t !:.!j, ll ti I` .,•, { ■.. : 1:. H. �+ !t. • • I. :II: • !
. .• , I , . .: ..s !I,: `I+ Iii 'i: :: ,! _ :;. - + ,
ti.r �•1✓
Michael Baker
INTERNATIONAL
Mr.Christopher P.Perez
March 25,2015
Page 11 of 12
)i' ;:,?,?t, a -. ;1, 14
ui`- I J. t', 11t1 FJ iI t1,1((.1[111C11
! j , '1•W t.lii ;1)
• I:, , ,,i, ;l'l li' 1 `.. K( I' 11,;111. 11,1 H' '. „I.. :. . i1;!, H• i1111i, 1 i•.
1111•1.1.
1�, { U,I�;11111I F pI• j?i:1(1j` .,I ,{I••li:;i`.,!i.,.• 1 -1`, .. it .,1, .-. ,: '1 I ', I?:„11, ,n i '! Ili,,,l `,t:,,, i'. •,,.
1 •1. 1 i�:1i,'. `'Ijt'l • Ii,liiltal-)
1 1.1 ,!,I, .',r. ,;?; ii,,,1 i` `,l , (!Lil■•• ..11 . 1, , ••11,1 1••
\.., 1 t.1 t1, r Hill til,..,11;, I I it ,i., •;
H 1 1; ,,,i•. I , I' , •■I■I.11s,',1i11:,1i 1:,,.iL',1,,111 „■ I, ''I ii i I'.
i`' ? , 1 \ \1 il`i „\I•C,: l'? .!(' t iiF I;IVipii;R', 'it,., '! 1 it 1,, • tl -.- . ,! - ,I„1.. ., il.`, t ",t!t'(. •it'illll'ila•
ill, , 111, •ii; 41. ..1'111 jO r.
• ,..I'nl, ,■., •.! , ,I,,,1-.01/1 ,\,:1 It nr I,111 1;�\\
1'1' t? 11 1111 111 �•L.�!' `�', 't'to 'IIt i 1 !�'' !!' .'it i t tit'; JOIL. ,'ll,• .:III:, , '1: .1 .1,1 , !I
I!, ,,1 { 1. ,'1,'\. `',( "11, tit',, .,lil,.il'., 1'1 11, '1.- -.,11. li
• ,f-;, 1 1` , 1,, ( ..11( .+ 1 i11, ii , ,{,, 11, , 't 1 1. . i:, ' 1 .,'I'.. 1 1 1
. t' .,(! . 111 11, ._ , 1 01`111..,:i .`.! 1;, 1'.1'1! 1: ..=tl,t. 111 l.i
• 1 ! ;.1!'. i`.,, 11. 11 111, ,` I II ,'.It \"”' 1
I<, 1!1"7 : t I 111.'1 111. `-Ik 4•I .`„ ,,, II11 i .,1',F , ..`1, .1.i !-, ..{ 1 ,
11. 1111,.,1„r a , J,'I, ., .f 1 .'11 1'H:,, 11 OH 11, .,
, 1; I' I • 0' • ..1 11„ '1 1 1
•
•
•
•
•
1
Michael Baker
INTERNATIONAL
Mr. Christopher P.Perez
March 25,2015
Page 12 of 12
1 ,1 Pciii,1 ' Ili ut,'tt i,:l'n n!1{,:I' , 1 , 1, I. , <. ,.. H
! ' H a\ I III .I;i1, -I (Ht! 1',t 'i'1. : 1 \'5■1 'I1. ∎.._li„ ,I1.. l,j, 1 ,il , . Ii ii:
I s . . 1(11; ., (,,,.Il ■,1 U! tk 1'10t .:!1( j,11. ,'-t .),1 ,11'' i■ ' '1 .II j , i ,.'ll .I::•c ;1;, ,:{'.'c Lt
.'I' .i'l NI. , „1 I!:, ..11:11 .i'll ■, H.,,, 1, i. 1 Jl.'1 .I1 (I. n:. Ill . Hi'l ,I',1:. ■ l.■,l,
i" '1' ,i t l l i l i' ,1 1:. ;I I t ■'i I 1,,\\ Ik H \,Ii 1'1',.1; ,
PC,1 ,,ti,t : li, ILPIH., .,1, hl t \icitl! di ill. 0,i;'r.1'. ::1 Ilk .:Ulii
Bollards at the corners of the vault are considered a fixed object hazard since they are within the clear zone
of the roadway.We are not as concerned with the vault causing the hazard.We are more concerned with the
vault becoming damaged or VDOT equipment becoming damaged during mowing or snow removal
operations.
Please provide flexible reflective delineator posts. See sections 6F.73,Tubular Markers,or section 6F.88,
Delineators,of the latest Virginia Work Area Protection Manual.
Response: Tubular Markers are provided as shown on Sheet 12.
it, J.i) I1:,o., ill:,,. .1.l\ ',:Ill„tll.,lucr
1 - ,, .. '11, .'I ilcil'i, 11
I lit ch.' I , ., ,1t 1.1'1'!: , l∎Iiiil,t
i I
'r ti
k..,-I !, I 1
1. 11. ili . its 1 I,
is 1 ii.
Thank you for assistance in this project.If you have any questions or require additional information,please do
hesitate to contact me.
Sincerely,
ICHAEL BAKER JR.INC. i
1 / //i,
sz Chip Votava,P.E.
Project Manager
CFV/rfg