Loading...
HomeMy WebLinkAboutSP201400005 Correspondence 2014-04-23 REGENTS SCHOOL OF CHARLOTTESVILLE April 23,2014 Christopher P.Perez Senior Planner,County of Albemarle Department of Community Development 401 McIntire Road,North Wing Charlottesville,VA 22902 Dear Mr. Perez, Thank you for your comments on our application for Special Use Permit. Our remedies for the comments submitted by planning commission staff are as follows: Planning: An additional traffic study and analysis has been performed by Mr.Bill Wuensch of EPR. He has been in contact with Mr.Glen Brooks and can provide additional assistance/clarification as to the traffic conditions outside our entrance as needed. We would like to modify our special use permit request to reflect the recommendations of Mr. Wuensch(115 students)as well as come to an agreement with the planning commission on how future remedies would allow us to increase our student population to 130 with a teacher population of 20. It would be wonderful if we could come to an understanding of what remedies would be acceptable during this special use permit application so that we would not need to come back to the planning commission next year. Since faculty enters the property in the morning and do not exit until the afternoon,after the students exit,we see no reason why parking lot exit data should limit the number of teachers on the site. We would like to have the number of staff members separated out from the limit for the number of students. Therefore,we request an allowance of 20 staff members for future needs, in addition to the 115 students requested for this upcoming school year(2014-2015). At these numbers,with our carpool rates,this amounts to no more than ten additional cars in the morning exiting the premises. It will also keep us well under our limit of 30 parking spaces. • We do not believe the initial traffic study accurately represents what happens in the field on a daily basis. Quite simply,cars are not waiting to exit the property for 252.2 seconds.Daily observation of the cars exiting our property differ significantly from the data provided in the first study. Therefore,we asked Mr. Wuensch to perform additional observations.Those observations are attached. • To get to the numbers of 130 students for the(2015-2016 school year)if we are still located at this facility, we propose the following remedies: 1. A right in,right out turn could be required with county signage between the hours of 8:00 and 8:30. The school is willing to contract with a local business on 250 to allow turn around space. 2. An exit on Broomley Road could be explored during the construction phase of the Broomley Bridge. There is not enough information at this resubmission date available from VDOT as to road height,etc.to gage the expense of such an entrance. 3. The school is willing to alter its school start time to 8:00 a.m. from 8:15 a.m if this accommodation will achieve desired results. 4. The school is willing to hire a traffic policeman to direct traffic everyday from 8:00 to 8:15. Engineering: Regents School acknowledges Mr.Brooks request for an entrance to be created at Broomley Road. We are happy to consider such an option.The most significant obstacle is expense. Christian Aid Mission,the property owner, is planning to sell the building and we do not have a lease to be at this location beyond the 2014-2015 school year. VDOT construction on the Broomley Bridge will potentially impact the cost of adding such an entrance. Until there is more information regarding road height,etc.,it is not possible for the school to determine if this is a capital improvement we are capable of making. Virginia Department of Transportation: We have had several conversations with Mr.Austin of VDOT in addition to his written comments. It is clear to us and he has stated repeatedly that there is no evidence that this intersection is unsafe. Models may suggest certain things,but thus far,the Regents parents have proven to be safe drivers and there has not been a single accident at this intersection during school hours in the two years the school has leased the property. Fire and Rescue: It is our understanding that the building owner has contacted the fire marshall and we expect inspections presently. We were unaware that we were behind as we have had regular contact with the fire marshall's office due to monthly fire drills,etc. Thank you for your assistance with these matters! We are grateful for the support of all of the staff and supervisors. S' -rely, )4(: /ji,110 ourtney lu o Head of Sch 1 Regents Sch of Charlottesville 434-293-0633 school 434-987-6186 cell