Loading...
HomeMy WebLinkAboutARB201500124 Plan - Approved 2016-01-28Riverside Village Condominiums ARB submittal Oct. 5, 2015 Re- submittal Dec. 4 2015 The proposed Riverside Village Condominium is a 4 -story, 24 -unit building, with approximately, 8,700 sq. ft. per floor. • The building design incorporates the historic Arts & Crafts style, that is compatible with the surrounding residential development at Riverside Village, and is commonly found throughout Central Virginia. • The building is 628' from the Entrance Corridor at its closest point. The building will not be visible from the Entrance Corridor after full build -out of the Riverside Village development General Massing Study Compatibility with significant historic sites Structure design - • The form, features and details draw from the Arts & Crafts architectural style. • The building will relate to other buildings within the development through the use of traditional materials, including stone veneer base, horizontal siding, white trim and a natural color palette. • The building massing is concealed with the extended porches that break it into a series of smaller, human -scale elements. The roof mass is reduced with the louvered dormers. Accessories & Equipment - • Mechanical equipment will be located on the roof and concealed from view within a recessed area with a flat roof. • Dumpster enclosure, see site plan Example of Art & Crafts detailing Riverside Village rendering - stone base, siding and dormer details Ulm Building base to match existing stonework on -site. (Luck Stone- Timber Ridge) "S4�vj View from Entrance Corridor The building will not be visible from the Entrance Corridor after full build -out of the Riverside Village development. Current view of site from Entrance Corridor - South 1P Rendered full build -out view from Entrance Corridor - South Current view of site from Entrance Corridor - North Rendered full build -out view from Entrance Corridor - North /a AC -YR ASP'tAL" S11104G,C 700' GLASS PANELS VIJ OCRAL 'AE-AL :ANOPY A/ DECORATIVE BRACKETS - Elevation Detail - Entry 5'40ECRINT rCC.RS & WEL•TES 1■ 1■ Elevation Detail - Porch CfLLu-LA* FVC er Exterior Finish Schedule Building Element Material /Finish /Color Stone Base Luck Stone - Timber Ridge Stucco Base Cement Stucco - Sand Finish, SW6199 Rare Gray SW 6199 Rare Gray Siding Hard!- Plank, SW6199 Rare Gray Stucco Columns Cement Stucco - Sand Finish, SW6119 Antique White SW 6119 Antique White Stucco Top Cement Stucco - Sand Finish, SW6119 Antique White Exterior Trim Boral Board, painted, SW6119 Antique White Siding Panels MDF board w/ Boral Trim, painted, SW6119 Antique White Tapered Columns Prefabricated Cellular PVC, painted, SW6119 Antique White Decorative Brackets, rafter tails Prefabricated Cellular PVC, painted, SW6119 Antique White Roof Asphalt Shingles - Certainteed Moire Black (Charcoal) See sample Gutters, downspouts Galvalume �r Unit windows and doors Metal -Clad wood double -hung, Eagle, Antique White, DC101 * ** Storefront Doors & Windows Metal, Custom color to match Antique White, DC101 Deck Railings Painted cellular PVC Cap w/ stainless steel cable rail system * ** VISIBLE LIGHT TRANSMITTANCE (VLT) SHALL NOT DROP BELOW 40%. VISIBLE LIGHT REFLECTANCE MR) SHALL NOT EXCEED 30% POnF PI AN ar�-Ilj Porch Eave Detail E =✓E E52:;GKE ' BOR -4-L ill,— P:al \'ED TAPERED COLU -IN, 1- A1N -ED (CELLULAR FIVC) 50RAL TRIM, PAINTED 5-61=0 Decorative eavLl� bracket detail - Fypon 16x16X2 6F21�1 FRONT ELEVATION REAR ELEVATION ob���-d LEFT ELEVATION (RIGHT SIM.) a ,vj GROUND FLOOR 1 J � J \ L f V I . I I 1 I � T - ` " i 1 y ( i -J. Lll I� I tom. SECOND FLOOR MELEM THIRD FLOOR ml Oj cl I-A "Ell FOURTH FLOOR I =/'