HomeMy WebLinkAboutSUB201500158 Review Comments 2015-10-23 s t Memorandum To: Ellie Ray, CLA, Senior Planner Division: Planning From: Jeff Powell (jeff @roudabush.com) Date: October 23, 2015 Subject: SUB 201500158 Hill Brook— Final Subdivision Plat The County of Albemarle Planning Division will approve the plat referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] Conditions of Preliminary Plat Approval(from approval letter dated 12/22/14): 1. [14-302(A)3] Existing or platted streets. Clarify the existing public right-of-way line and the 30' prescriptive easement line. The right-of-way line looks much like other lines on the plan, so it is difficult to tell which lines depict r/w. Is the prescriptive easement only along the subject parcel? Why is it shown over the existing public right-of-way? Final: Comment addressed. 2. [14-302(A)4&5] Private &public easements. Verify that the location and dimensions of all existing and proposed private and public easements are shown. Existing easements should be labeled with the appropriate DB and PG reference. Proposed easements should be labeled with the intended holder. The plan proposes both sewer and storm on private lots; these utilities will require easements. Additionally, if sidewalk is not located within the proposed public right-of-way, a sidewalk easement will be required with the appropriate maintenance agreement. Final: Comment addressed. 3. [14-302(A)4&5] Private &public easements. Will an easement be necessary for the off-site sewer connection? If so, show it on the plat and add impacted property owner(s)as signees. Final: Comment addressed. 4. [14-302(A)8] Proposed lots. Clarify the total acreage of the proposed lots on the cover sheet. The sum of all lots is 1.68 acres not 1.70; using 1.70 (the sum of rounded lot acreages)gives a total development area of 2.56 acres. Final: Comment addressed. 5. [14-302(A)8] Proposed lots. Indicate on the cover sheet that cluster development standards are being used. Final: Comment addressed. 6. [14-302(A)8] Proposed lots. Provide a frontage dimension for all proposed lots. Final: Comment addressed. 7. [14-302(A)10] Right of further division of proposed lots. Please remove the development rights note (note #2)as development rights are not applicable on R-2 zoned land. Final: Comment addressed. 1 Nose 8. [14-302(A)1I] Instrument creating property proposed for subdivision. The legal reference provided should be a Will Book reference, not a Deed Book reference. Final: Comment addressed. 9. [14-302(A)12] Topography. Label the existing topography. Final: Comment addressed. 10. [14-302(B)5] Zoning classification. Add Airport Impact Area (AIA)to the Zoning note. Final: Comment not addressed. Add AIA and Managed Steep Slopes to the Zoning note. 11. [18-4.6.1] Frontage and lot width measurements. The required frontage may be reduced on a cul-de-sac provided driveway separation meets VDOT standards. However, minimum lot width must be maintained between the front and rear yards; the front setback may need to be moved back to where minimum lot width is achieved. Final: Comment addressed. However, new setback standards are now available in R-2. This subdivision is vested should you choose to use the old requirements. If you choose to use the new requirements,the front setback may not be closer to the right-of-way than where the minimum lot width is achieved. 12. [18-14.4.1] Environmental standards. To qualify for the bonus factor for maintenance of existing wooded areas you must show that the area maintained meets the definition of`wooded area' in Section 3. Final: Comment addressed. 13. [18-14.4.1] Environmental standards. To qualify for this bonus, a conservation plan as specified in section 32.7.9 is required. Final: Comment addressed. 14. [14-317] Instrument evidencing maintenance of certain improvements. A maintenance agreement will be required for the proposed sidewalks(if they remain outside of the proposed public right-of-way)and the open space parcel. Final: Comment not addressed. Submit a maintenance agreement that covers the maintenance of the private street,sidewalks,street trees,open space and preserved tree area for review and approval by the County Attorney's Office. 15. [14-422] Sidewalks and planting strips. Label and dimension the sidewalks and planting strips. Planting strips must be 6'wide. Final: Comment addressed. Final Plat Comments; 16. [14-302(B)8] Yards. The setbacks listed on the cover sheet do not match those shown on sheet 2; revise accordingly. *Plat revised* 17. [14-303(S)] Control points. Provide at least four control points, evenly distributed across the property and located at survey property corners, and shown on each sheet depicting the property.*Control points added* 18. [14-311] Infrastructure improvement plans, computations and documents. The Road and WPO plans must be approved prior to Final Plat approval. All Road Plan and WPO related improvements must be built or bonded prior to approval of this plat. *Not A Platting Issue* Planners will have to address. 19. [Comment] This plat cannot be approved until VDOT,ACSA and Engineering complete their reviews and grant their approval; comments will be forwarded upon receipt. Fire Rescue, E911 and Inspections have completed their reviews and have no objection. *Engineering Comment has been addressed,ACSA and VDOT were in agreement with the plat as drawn.* 2 Ellie Ray From: Jess Achenbach <jess @reddirtdev.com> Sent: Monday, December 14, 2015 12:24 PM To: Ellie Ray Cc: Jess Achenbach Subject: Re: Hillbrook Maintenance Agreement Attachments: Hillbrook Open Space and Landscape Maintenance Agreement.doc; Hillbrook_Private_Street_Maintenance Agreement.doc Ellie, Please find a revised Private Street Maintenance Agreement and Open Space Maintenance Agreement for Hillbrook attached. Please let me know if you need anything else from me to proceed with the plat process. Thank you, Jess On Tue, Nov 10, 2015 at 12:35 PM, Ellie Ray <eray(a�albemarle.org> wrote: Jess, I just read through the agreement and I will forward it to the County Attorney's Office if you want me to, but I thought I should mention that you will also need to submit C&R that address maintenance of the open space and tree preservation area(s). Do you want me to wait and submit both at the same time? It seems like things go a little more smoothly when all of the relevant documents go to the them simultaneously. Let me know! Thanks, Ellie Carter Ray, PLA, LEED GREEN ASSOCIATE Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From:Jess Achenbach [mailto:iess @reddirtdev.com] Sent: Monday, November 09, 2015 5:15 PM 1 To: Ellie Ray<eray @albemarle.org>`"w Subject: Hillbrook Maintenance Agreement Ellie, I have attached a draft of the Hillbrook Private Road Maintenance Agreement. Who should I direct this to for approval? Thanks, Jess Jess Achenbach Red Dirt Developments P.O. Box 645 Charlottesville,VA 122902 C(434)242-4802 less a reddirtdev.com Jess Achenbach Red Dirt Developments P.O. Box 645 Charlottesville,VA 122902 C(434)242-48021 jess(a)reddirtdev.com 2 Ellie Ray From: Todd Shifflett Sent: Monday, December 07, 2015 10:48 AM To: Ana Kilmer;Jess Achenbach Cc: Justin Deel; Ellie Ray; Kenny Thacker Subject: RE: Hillbrook performance bonds Attachments: WPO_VESCP_Virginia_Erosion_and_Sediment_Control_Program_Pre- Construction_Meeting_and_Permit_Request.pdf Good Morning, Attached is a pre-construction meeting request form. Please fill out and return to me before the pre-construction meeting. You will be required to pay the $594.00 fee at the bottom of this request before or at the time of the pre- construction meeting. This meeting can be scheduled after DEQ issues coverage. I will be sending this for their review. This process can take 5-7 business days. Thank You, Todd Shifflett Community Development Engineering Division (434)296-5832 ext. 3072 tshifflett @albemarle.org From:Ana Kilmer Sent: Friday, December 04, 2015 12:33 PM To:Jess Achenbach<jess @reddirtdev.com> Cc:Justin Deel<jdeel @albemarle.org>; Ellie Ray<eray @albemarle.org>; Kenny Thacker<KTHACKER @albemarle.org>; Todd Shifflett<tshifflett @albemarle.org> Subject: Hillbrook performance bonds The following bonds have been posted and approved: $279,960 water protection performance bond (erosion $110,570; stormwater management and water quality 169,390). The stormwater agreement has been approved by the county and it will be recorded next week. $36,500 subdivision/road performance bond—water and sewer $88,830 subdivision/road performance bond Todd Shifflett will let you know when you can schedule a pre-construction meeting. Thank you Ana D. Kilmer Management Analyst Community Development Department 401 McIntire Road Charlottesville, VA 22902 1 4�FA� 4I'I11111 �'IRG1N1�' COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax(434)972-4126 Date: December 14, 2015 Greg Kamptner County Attorney's Office 401 McIntire Road Charlottesville,VA 22902 Regarding: Project Name:SUB 201500158 Hillbrook- Final Date Submitted: 12/14/15 Dear Mr. Kamptner: The applicant has prepared and submitted a Private Street Maintenance Agreement and Open Space Easement/Landscape Maintenance Agreement(maintenance of the open space, landscaping and tree preservation area)for the above named project. At your earliest convenience, please review the documents and the attached plat. Should you have any questions or comments please feel free to contact me. Sincerely, Ellie Carter Ray, PLA, Senior Planner County of Albemarle Department of Community Development Division of Zoning and Current Development 401 McIntire Road Charlottesville, VA 22902 eray @albemarle.org (434)296-5832, phone ex.3432 (434)972-4126 fax