RE: PROJECT: ZMA201400008 CMA Properties, SP201500005 CMA Properties - Outdoor
Storage& Display, SP201500006 CMA Properties -Stand Alone Parking
Dear Ms. Long,
The Albemarle County Planning Commission, at its meeting on March 17, 2015, by a vote of 7:0,
recommended approval of the above-noted petitions to the Board of Supervisors. Please note that this
recommendation is subject to the following conditions:
Regarding ZMA-2014-00008 CMA Properties
1. The building envelope on the concept plan should be extended to the edge of the right of way. The
applicant should commit to locating buildings for commercial uses other than automobile sales/service
to address the street with relegated parking.
2. The sidewalks and street trees should be constructed when sidewalks are installed on adjacent
property.
3. Screening shall be provided during Phase I in the form of a berm as shown on the Conceptual Plan
Grading Exhibit.
4. The proffer to keep Myers Drive free from impediments shall refer to the alignment of Myers Drive as
that shown on the Concept Plan.
5. Technical fixes should be made to proffers as recommended by staff.
Regarding SP-2015-000005 CMA Properties—Outdoor Storage & Display
1. Vehicles shall not be elevated anywhere on site.
2. Vehicles shall be displayed only in areas indicated as"inventory"on the plan entitled"CMA Properties
Highway Commercial Concept Plan" by Collins Engineering with revision date of 1-30-2015. Inventory
parking within the EC Overlay District shall be only in designated striped parking spaces,as identified
on this plan.
3. Final site plan approval is subject to ARB approval of the lighting plan (submitted with the site plan).
Maximum light levels shall not exceed 30 footcandles.
4. Final site plan approval is subject to ARB approval of the landscape plan (submitted with the site
plan). Landscaping shown on the plan may be required to be in excess of the minimum requirements
of ARB guidelines and/or the Zoning Ordinance to mitigate visual impacts of the proposed use.
5. Clarify on the plan all site elements to be included in Phase 1 and Phase 2. If the stormwater pond is
constructed in Phase 1, indicate that the trees along the southern perimeter of the site will also be
installed in Phase 1.
Regarding SP-2015-000006 CMA Properties—Stand Alone Parking
No Conditions
Within 30 days of the date of this letter, please do one of the following:
(1) Resubmit in response to Planning Commission recommendations
(2) Request indefinite deferral
(3) Request that your Board of Supervisors public hearing date be set
(4) Withdraw your application
If you should have any questions or comments regarding the above noted action, please do not hesitate to
contact me at(434) 296-5832.
Sincerely,
(*)
Rachel Falkenstein
Senior Planner
Planning Division
CC: CMA Properties Inc
P 0 Box 7823
Charlottesville Va 22906