Loading...
HomeMy WebLinkAboutSUB200900161 Correspondence 2016-02-09John Anderson From: John Anderson Sent: Tuesday, February 09, 2016 8:28 AM To: Gaylon Beights Cc: Ana Kilmer; Glenn Brooks; 'Scott Collins' Subject: RE: Old Trail Village Block 3 Phase B - $34,700 - Subdivision/Road Performance Bond - Roads Gaylon, I hope this note is helpful. I, Ana, and Alb. County are positioned and willing to help, but are bound by bond reduction requirements. As follow-up to Ana's note yesterday, and with respect to block 3B, please ref email sent Dec 22, 2015, at 6:02 PM: Old Trail, block 3B I spoke with Dennis at 5pm. He may be able to inspect 3B tomorrow, midday. A punch -list cannot reasonably reach us by 5pm tomorrow, Dec 23. County offices close at 5pm, Dec 23, and reopen 28 Dec. There is no As -built for block 313 that I am aware of. Document requirements discussed last week are vital to VDOT acceptance of public portion of block 3B (Claremont Lane). Dennis requires video for storm pipes. I have not received any checklist items discussed last week. I spoke with Scott Collins on Dec 17. He is not confident that required documents are available, yet we need this information. If required information is unavailable, we need core samples to establish asphalt/base (stone) depth. Visual inspection is helpful but we also need: As -built plans, pipe inspection video, checklist documents. I don't have these. I am uncertain how to proceed. The County Engineer is away until 4 -Jan. No other staff can act since County Engineer must instruct how we are to proceed, absent required documents. Even after we return, document requirements persist. Scott is unsure construction documents needed to certify construction or to prepare an As -built drawing exist. I regret the pace is deliberate, but I lack authority to set aside bond requirements. I cannot overstate the circumstance: we have nothing to work with. We lack information. Please help with as many items on the checklist as you can. With required block 313 materials (video, As -built, PE -certification, construction documents), we can make progress. Status of Old Trail block 3B bond reduction (inspection) request is unchanged since email sent 22 -Dec. Email will be re- sent. Text above details request for information, block 3B. Status of Old Trail block 23 (Baywick Circle) bond reduction (inspection) request unchanged since email discussing block 23 was sent 1/6/2016 4:36 PM. This email will be re -sent. Status of Old Trail Ballard Field Phase IV (Killdeer Lane) bond reduction (inspection) request has changed since email sent 1/21/2016 11:12 AM. This email will be re -sent. I recommended bond reduction for Killdeer Lane 1/21/2016, despite absence of necessary and required documents. I don't know where things stand on this recommendation. Further reduction for listed block bonds is contingent upon receipt and review of required documents, pipe video, punch lists, etc. I don't know how else to say it. Please let us know if you have any questions. Thanks for your patience. 434-296-5832 — x3069 From: Ana Kilmer Sent: Monday, February 08, 2016 4:43 PM To: Gaylon Beights <gtbeights@gmail.com> Cc: John Anderson <janderson2@albemarle.org> Subject: Old Trail Village Block 3 Phase B - $34,700 - Subdivision/Road Performance Bond -Roads Gaylon Per your recent inquiry in regards to which entity provided the cashier's check that secures this bond. The cashier's check and W-9 form were provided by Beights Properties I, LLC. Thank you for your patience. Ana D. Kilmer Management Analyst Community Development Department 401 McIntire Road Charlottesville, VA 22902 434-296-5832 akilmer@albemarle.org