HomeMy WebLinkAboutARB201500073 Review Comments 2015-10-21 11?/ij
A
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
1601 Orange Road
Culpeper,Virginia 22701
Charles A.Kilpatrick,P.E.
Commissioner
October 21, 2015
Ms. Megan Yaniglos
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville,VA 22902
Re: SDP-2015-00048 Mechum's Trestle Final Site Plan
Dear Ms. Yaniglos:
We have reviewed the Final Site Plan for Mechum's Trestle, with a signature date of September
11, 2015, as submitted by Waterstreet Studio and offer the following comments:
1. As previously mentioned the AM-E spacing exception is required for the proposed
entrance. It has not been submitted to us at this time.
If you need additional information concerning this project, please do not hesitate to contact me at
(434)422-9894
Sincerely,
Shelly A. Plaster
Land Development Engineer
Culpeper District
701 VDOT Way
Charlottesville, Virginia 22911
WE KEEP VIRGINIA MOVING
•
Nei "air
AL
��A OF B,,_
8®. .
sr`` �tress's:
NG-10.
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road,North Wing
Charlottesville,Virginia 22902-4596
Phone(434)296-5832 Fax(434)972-4126
February 10, 2016
Alan Franklin
418 East Main St
Charlottesville VA 22902
RE: ARB-2015-73: Mechum's Trestle—Final
Dear Alan,
I've reviewed the re-submitted site plan with revision date of 12/8/2015 for the above-referenced project. The revisions
made in this plan resolve the outstanding conditions of ARB approval. You may consider this letter your Certificate of
Appropriateness.
This approval is predicated on the fact that the design and materials, as proposed and exhibited for review, will be used.
The acceptance of approval implies that the applicant has agreed to execute the design as indicated on the site plan,
attachments, materials, samples, and other submittal items presented. Any change in the approved design or materials will
require an amendment to the plan and must be reviewed and approved by the Architectural Review Board.
Please note the following:
1. This application is approved with the condition that mechanical equipment shall not be visible from the Entrance
Corridor.
2. Changes made to the site or architectural plans after issuance of a Certificate of Appropriateness can delay the
signing of final plans and the approval of building permits. It is in the applicant's best interest to notify ARB staff
of such changes and to initiate the review of amendments to ARB-approved plans to avoid future delays.
3. Certificates of Appropriateness are valid for the same period that the corresponding site plan is valid. If there
is no site plan required for the proposed work, the Certificate of Appropriateness is valid for 3 years.
Applicants requesting an extension of the period of validity must do so in writing. The letter must be
received by the Director of Planning prior to the expiration date.
If you have any questions, please do not hesitate to contact me.
Sincerely,
74-AVIX-0/
Margaret Maliszewski
Principal Planner
cc: Mechum's Trestle LLC, 99 Bloomfield Rd., Charlottesville VA 22903