HomeMy WebLinkAboutARB201600010 Review Comments Miscellaneous Submittal 2016-02-18Ellie Ray
From: Ellie Ray
Sent: Thursday, February 18, 2016 5:01 PM
To: jks @sesbranding.com'
Subject: RE: ARB201600010 Speedway - Sign
Jodi,
I have reviewed the revised sign application; see below under my previous comments for my current comments.
Please respond within 15 days of the date of this email indicating whether you will or will not proceed with these revisions.
Your decision to make the revisions will suspend the 60 -day review period associated with your original submittal. If you
choose to complete the revisions, please email the revised drawings to me. If you choose not to proceed with these
revisions, staff will be unable to approve your application. Failure to respond to this email shall be presumed to be a
request to proceed to action on the application without further revisions.
If you have any questions about this action, please contact me as soon as possible. I look forward to receiving your revisions
and completing this review with an approval letter.
Thank you,
Ellie Carter Ray, PLA, LEED GREEN ASSOCIATE
Senior Planner
Albemarle County Community Development
ph: 434.296.5832 x. 3432
From: Ellie Ray
Sent: Friday, February 05, 2016 4:19 PM
To:'jks @sesbranding.com' <jks @sesbranding.com>
Subject: ARB201600010 Speedway - Sign
Jodi,
I have reviewed the proposed sign application, Speedway #4653 located at 2235 Seminole Lane, and have the following
comments:
1. The location of the monument sign is incorrectly shown on the Site Plan sheet; revise to show the correct
location.
Rev1: Comment addressed.
2. If the existing illumination is to remain, provide a note stating "Existing illumination to remain" for both the
monument sign and the Speedy Wash wall sign. If new illumination is proposed, provide the relevant
information.
Rev1: Comment addressed.
3. Revise the drawing to indicate that the background of all illuminated sign panels is opaque and that only the text
and graphics shall illuminate.
Rev1: Please add this note to the "Speedy Wash "face replacement in addition to the monument sign.
4. Revise the drawing to indicate the proposed colors used in the Speedy Wash wall sign.
Rev1: The proposed color is now noted as "310 3630 -143 Poppy Red" (pantone 1788C2X). As discussed over
the phone, this Red is not on our list of colors that may be administratively approved. Please revise the
proposed color to be consistent with the other approvable reds in the application (as noted in comment
5.... #2793, Pantone 187C and 3M 3630 -83 Scarlet Red). This comment is also applicable to the Monument sign
as that sign has now been revised to 3M 3630 -143 Poppy Red.
5. The ARB has previously determined Red acrylic #2283 to be an inappropriate color for signs, with Red #2793
(Pantone 187C) as an acceptable substitute. Revise the proposed channel letter color to an appropriate color.
Revl: Comment addressed.
6. The proposed vinyl color is noted as 3M 7725 -63 Geranium, which is slightly different than the other red
shade(s) proposed; consider revising proposal to use a consistent color in all locations.
Revl: The proposed color is now noted as "3114 3630 -143 Poppy Red" ( pantone 1788C2X). As discussed over
the phone, this Red is not on our list of colors that may be administratively approved. Please revise the
proposed color to be consistent with the other approvable reds in the application (as noted in comment
5.... #2793, Pantone 187C and 3M 3630 -83 Scarlet Red).
7. Add a note indicating that the ACM panel color white matches the canopy color white.
Revl: Comment addressed.
8. Add the following note to the drawing, "The level of illumination provided by the LED lights will not exceed the
illumination produced by a single stroke of 30 milliamp (ma) neon."
Revl: Comment not addressed; please add this note to the drawing.
Please respond within 15 days of the date of this email indicating whether you will or will not proceed with these revisions.
Your decision to make the revisions will suspend the 60 -day review period associated with your original submittal. If you
choose to complete the revisions, please email the revised drawings to me. If you choose not to proceed with these
revisions, staff will be unable to approve your application. Failure to respond to this email shall be presumed to be a
request to proceed to action on the application without further revisions.
If you have any questions about this action, please contact me as soon as possible. I look forward to receiving your revisions
and completing this review with an approval letter.
Thank you,
Ellie Carter Ray, PLA, LEED GREEN ASSOCIATE
Senior Planner
Albemarle County Community Development
Planning Division
401 McIntire Road, North Wing
Charlottesville, Virginia 22902
ph: 434.296.5832 x. 3432
fax: 434.972.4126
4