Loading...
HomeMy WebLinkAboutSDP201500054 Correspondence 2016-02-22FAM D ASSOCIATES INC, REFLECTING TOMORROW February 16, 2016 County of Albemarle 401 McIntire Road Charlottesville, VA 22902 RE: Response to Comments Landmark Aviation Hanger — Major Amendment Balzer Project No: 34150042 County Project No: SDP201500054 This letter serves as our written responses to the County comments on the subject: Planning — Ellie Ray 1. Zoning Information corrected on C2 & C3 as well as the cover. 2. North arrow added to C4. 3. Source of topography added to C1 as General Note #14. 4. Sheet numbering has been renumbered to be consistent. 5. Cover has been revised to specify a maximum building height of 35'. Coordination has been made to the client and contractor. 6. General note 13 on Cl has been revised. 7. Utilities have been verified. All utilities within subject area are private. 8. Concrete apron has been dimensioned. 9. Note revised. 10. Lighting has been revised to be consistent with prior submitted packet. 11. Tree protection and detail have been provided on site plans C4. This is an ESC measure which is shown in the ESC Sheets which is not reviewed by the SDP review process. However, notes and details have been added to the appropriate site plan sheets for SDP coordination. A separate landscape plan has been provided. The conservation checklist has been signed and added to the landscape plan C9. 12. This has been done in correlation with response above. 13. This is a note from a prior plan, it has been removed. PLANNERS ' ARCHITECTS ' ENGINEERS' SURVEYORS ROANOKE 'RICHMOND 'NEW RIVER VALLEY ' SHENANDOAH VALLEY 1561 Commerce Road, Suite 401 ' Verona, Virginia 24482 ' (540) 248-3220 • FAX (540) 248-3221 Response to Comments Landmark Aviation Hanger Page 2 of 3 14. Lighting Plan and fixture information from email has been provided. • Luminaire schedule added. • Cut sheets have been added. I have confirmed with manufacturer that Fixture A does not meet Full cutoff at 60 degree tilt. However, they did say that by adding the Deep Baffle Shield it will make this fixture a full cutoff 60 degrees. This shield has been added to the plans and noted as a requirement if 60 degree tilt is desired. • See note above. Option is given for 0 degree tilt or shield. • Model numbers match between schedule and cut sheets. • Locations are now consistent. • Note added. 15. WPO Submitted. 16. Noted. Engineering — John Anderson A. Site Development Plan 1. No objection. Fire Rescue — Shawn Maddox 1. Fire Access Road added along east side of hangers. 2. Two hydrants added per comment. 3. The fire flow test provided by ACSA shows a static pressure of 83 psi and residual pressure of 60 psi with a total estimated flow of 1,996 gpm from the flow hydrant. The Report has been provided with this submittal. 4. Knox Box note added to C3. 5. FDC added per additional comment from email discussions. E911— Andrew Slack 1. Approved. ARB — Margaret Maliszewski 1. Approved. Inspections — Jay Schlothauer 1. Building has been moved to be at least 50' from adjacent hanger as shown on C3. 2. As discussed, the hanger group type and the plane being non -fueled has been added to the cover. 50' Building separation shown on C3. i1,i,14*W-11:191:ikIx$I&IN =I►ICI i►i44:MWYa:IN;c•1*1 :Z1T1►�[17:1�:7(N'I��LU►�I��►�1��%7D/�:a�/'1A��'E9:1�►�/ 1►�1�7�7 ►:��/ 1���1 1561 Commerce Road, Suite 401 • Verona, Virginia 24482 • (540) 248-3220 • FAX (540) 248-3221 Response to Comments Landmark Aviation Hanger Page 3 of 3 Rivanna Water and Sewer Authority — Victoria Fort, P.E. 1. No objection. VDOT — Troy Austin, P.E. 1. The access for construction will be the emergency access road shown on the plans. 2. Note has been added to C3. 3. This hanger is strictly for storage with no maintenance being performed. The trip generation impact from the client based on existing hangers is 1.5 trips per aircraft per week. There will be 4 airplanes at most in the hanger so a total generation of 6 trips per week for the hanger. It should also be noted that some trips may not be generated by the new hanger due to users already being onsite for other reasons. The 1.5 trips is based on new aircraft in the hanger generating new traffic, which the client says will not necessarily be the case. ACSA — Alexander J. Morrison, EIT 1. As discussed and provided by client, the existing private line feeding the existing hangers is 8". This line has been extended and two hydrants are added to the line. Based on fire flow results and fire suppression testing of adjacent hangers, adequate fire flow is available. 2. There will not be a domestic meter. I apologize for the confusion, the details have been removed. 3. This was from the client and not an official number from the fire suppression company. 4. Fire flow test has been received and provided to fire suppression company and fire marshal. Please do not hesitate to contact us if you have any questions. Sincerely, BALZER AND ASSOCIATES, INC. D. Kent O'Donohue, LA Project Manager 1:110%i ►rN7:��:�cN:►iGclr►.�►�►�WWWWAM,T*Aa'E9:►-Iar►a►•z•yaUAV►99 7 1561 Commerce Road, Suite 401 • Verona, Virginia 24482 • (540) 248-3220 • FAX (540) 248-3221