Loading...
HomeMy WebLinkAboutSDP201100076 Review Comments 2011-11-17Review Comments Project Name: CROZET LIBRARY (PHASE II) - FINAL Final Site Development Plan Date Completed: IThursday, November 17, 2011 Reviewer: Max Greene Department/Division /Agency: Engineering Reviews plan and application form are required prior to final approval. Review Status: Requested Changes NOW' Review Comments Project Name: CROZET LIBRARY (PHASE 11) - FINAL Final Site Development Plan Date Completed: IThursday, November 17, 2011 Reviewer: Jay Schlothauer Department/Division /Agency: Inspections Reviews Based on plans dated October 31, 2011. INo comments or conditions. Review Status: No Objection Review Comments Project Name: CROZET LIBRARY (PHASE II) - FINAL Final Site Development Plan Date Completed: 1wednesday, November 23, 2011 Reviewer: Robbie Gilmer Department/Division /Agency: Fire Rescue Reviews IBased on Plans dated 10/31/2011: Comments added by ACFR Asst. Chief Howard Lagomarsino -434- 296 -5833 1) FDC unsafe near LPG UST and Transformer and in general SFPC requires it to be on street side of structure, visible and with a fire hydrant/water supply within 75 to 100 feet. 2) Clarify FDC signs to indicate location of FDC 3) Clarify connector type information for FDC and ensure that it match threads used in Albemarale County 4) Ensure adequate fire flow ... unable to provide further comment on fire flow since building construction type not listed on these plans 5) Provide locations of all hydrants (only see one on Library street.... Spacing is dependant on fire flow requirements (good rule of thumb is to start with 400 feet spacing) 6) Provide clarification on Fire Lane ... it should encompass entire front of building (parking lot/entrance side) and extend to the small section section in front of the south west corner of the building near the transformer and underground LPG tank Review Status: Requested Changes w Review Comments Project Name: CROZET LIBRARY (PHASE II) - FINAL Final Site Development Plan Date Completed: Monday, November 28, 2011 Reviewer: Andrew Slack Department/Division /Agency: E911 Reviews No Objection. Review Status: No Objection Review Comments Project Name: CROZET LIBRARY (PHASE II) - FINAL Final Site Development Plan Date Completed: Friday, December 30, 2011 Reviewer: Jay Schlothauer Department/Division /Agency: Inspections Reviews Based on plans revised October 31, 2011 ( ?). No comments or conditions. Review Status: No Objection Review Comments Project Name: CROZET LIBRARY (PHASE II) - FINAL Final Site Development Plan Date Completed: ITuesday, January 03, 2012 Reviewer: Robbie Gilmer Department/Division /Agency: Fire Rescue Reviews Based on the plans dated 12 -16 -11 Move the FDC connection to north face at the north /east corner. (Library Street side near the hydrant) Review Status: Requested Changes Review Comments Project Name: CROZET LIBRARY (PHASE II) - FINAL Final Site Development Plan Date Completed: Wednesday, December 28, 2011 Reviewer: Max Greene Department/Division /Agency: Engineering Reviews Approved WPO plan and application form are required prior to final approval. Review Status: Pending Im Ellie Ray From: Sent: To: Subject: Attachments: COUNTY OF ALBEMARLE Alex Morrison [amorrison @serviceauthority.org] Thursday, December 29, 2011 9:40 AM Ellie Ray SDP2011076 - Crozet Library Pahse II Final SDP2011076 - Crozet Library Pahse II Final.pdf Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Dear Ellie : The Albemarle County Service Authority (ACSA) has received and reviewed the plan /document /project described above. Attached is the ACSA comment sheet with any relevant comments and concerns we may have regarding the plan /document /project. Please feel free to contact me at the number below with any comments or questions you may have about the attached ACSA comment sheet. Thank you. Be advised that this comment sheet contains the same comments as the sheet provided 11/30/11 because no ACSA comments were addressed by the applicant. Alexander J. Morrison, EIT Civil Engineer kkavi illPu Service Auu th6r' ___ 168 Spotnap Road Charlottesville, VA 22911 Office: (434)977-4511 EXT: 116 Cell: (434) 531 - 7434 This email may contain confidential information that should not be shared with anyone other than its intended recipient(s). Albemork County Service Authority MJ • Coqwmiq TO: Ellie Ray Carter FROM: Alexander J. Morrison, Civil Engineer DATE: December 29, 2011 RE: Site Plan Technical Review for: SDP2011076 — Crozet Library (Phase II) Final TMP# 56A2 -01 -18 & 56A2 -01 -19 The below checked items apply to this site. ✓ 1. This site plan is within the Authority's jurisdictional area for: ✓ A. Water and sewer B. Water only C. Water only to existing structure D. Limited service ✓ 2. A 6 inch water line is located approximately on site distant. 3. Fire flow from, nearest public hydrant, located distant from this site plan, is Gpm + at 20 psi residual. ✓ 4. A 10 inch sewer line is located approximately on site distant. 5. An Industrial Waste Ordinance survey form must be completed. ✓ 6. No improvements or obstructions shall be placed within existing or future easements. 7. and plans are currently under review. 8. and plans have been received and approved. 9. No plans are required. 10. Final and plans are required for our review and approval prior to granting tentative approval. 11. Final site plan may /may not be signed. 12. RWSA approval for water and /or sewer connections. 13. City of Charlottesville approval for sewer. ✓ Comments: • Feel free to contact me at 434 - 977 -4511 ext. 116 to discuss comments. • Relocate water meter closer to the existing line. • Fire line cannot go through water meter and must be a separate tap. • Add gate valve on fire line (this will be the end of ACSA ownership). • PIV must be on domestic side of fire line gate valve. • Provide ACSA easements on domestic water service line, including water meter vault. • Provide ACSA easement on fire line, including gate valve (10 foot off end of gate valve). • Provide fixture counts so water meter can be sized. 168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977 -4511 • Fax (434) 979 -0698 www.serviceauthoriy.org Review Comments Project Name: CROZET LIBRARY (PHASE II) - FINAL Final Site Development Plan Date Completed: ITuesday, February 07, 2012 Reviewer: Howard Lagomarsino Department/Division /Agency: Fire Rescue Reviews 1per the plans dated 01/30/2012... no objections Review Status: No Objection NOW' Review Comments Project Name: CROZET LIBRARY (PHASE II) - FINAL Final Site Development Plan Date Completed: 1wednesday, February 08, 2012 Reviewer: Max Greene Department/Division /Agency: Engineering Reviews E &SC (WPO) plan and application is required prior to final site plan approval. Review Status: Pending '"W, Review Comments Project Name: CROZET LIBRARY (PHASE II) - FINAL Final Site Development Plan Date Completed: JFriday, April 27, 2012 Reviewer: Margaret Maliszewski Department/Division /Agency: ARB Reviews Review Status: Approved W •..0, Review Comments Project Name: CROZET LIBRARY (PHASE II) - FINAL Final Site Development Plan Date Completed: 1wednesday, May 30, 2012 Reviewer: Max Greene Department/Division /Agency: Engineering Reviews Review Status: Approved