Loading...
HomeMy WebLinkAboutSDP201100070 Review Comments 2011-10-25Review Comments Project Name: Westminister of the Blue Ridge Apartments - Preliminary Plat Date Completed: Tuesday, October 25, 2011 Reviewer: Margaret Maliszewski Department/Division /Agency: ARB Reviews It appears that the proposed addition will have some visibility from the Route 250 East Entrance Corridor. Consequently, ARB review and approval will be required prior to final site plan approval. review atatus: Requested Changes �r v..0 Review Comments Project Name: Westminister of the Blue Ridge Apartments - Preliminary Plat Preliminary Date Completed: Tuesday, November 01, 2011 Reviewer: Robbie Gilmer Department/Division /Agency: Fire Rescue Reviews Based on plans dated October 10, 2011. Indicate the vertical clearance where the driveway passes under the proposed building. fire hydrant locations. Verify that adequate fireflow is available. Required fireflow is 1,450 gpm @ 20 psi. Show the location of the sprinkler system's fire department connection. Keview jtatus: Kequested Changes Albemarle County Service Auth6rity �K'AlrO ♦ 4ort o v:ng TO: Sarah Baldwin FROM: Alexander J. Morrison, Civil Engineer DATE: RE: Site Plan Technical Review for: SDP201100070 : Westminster Canterbury of the Blue Ridge Apartments TMP# 07000000055A6 The below checked items apply to this site. ✓ 1. This site plan is within the Authority's jurisdictional area for: ✓ A. Water and sewer B. Water only C. Water only to existing structure D. Limited service ✓ 2. An 8 inch water line is located approximately 5'distant. 3. Fire flow from, nearest public hydrant, located distant from this site plan, is Gpm + at 20 psi residual. ✓ 4. An 8 inch sewer line is located approximately 94' distant. 5. An Industrial Waste Ordinance survey form must be completed. ✓ 6. No improvements or obstructions shall be placed within existing or future easements. 7. and plans are currently under review. 8. and plans have been received and approved. 9. No plans are required. ✓ 10. Final water and sewer plans are required for our review and approval prior to granting tentative approval. 11. Final site plan may /may not be signed. 12. RWSA approval for water and /or sewer connections. 13. City of Charlottesville approval for sewer. ✓ Comments: Show existing and proposed water and sewer. 168 Spotnap Road • Charlottesville • VA 22911 • Tel (434) 977 -4511 • Fax (434) 979 -0698 www.serviceauthoriy.org COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper, Virginia 22701 -3819 Gregory A. Whirley Commissioner of Highways October 31", 2011 Mr. Glenn Brooks Department of Engineering and Development 401 McIntire Rd. Charlottesville, VA 22902 Subject: Site Review Meeting Comments November 3`', 2011 site review meeting Dear Mr. Brooks: Below are VDOT's comments on the Site Plans for the November P, 2011 Site Review Committee Meeting: SDP - 2011 -00067 Verizon Monopole Extension Mechums River- Gallihugh Property (Brent Nelson) • No comments SDP - 2011 -00067 Verizon Monopole Extension Mechums River- Barrell Property (Brent Nelson) • No comments SDP - 2011 -00070 Westminster Canterbury of the Blue Ridge Apartments (Sarah Baldwin) • All proposed work is within privately maintained streets. No permit or review is required from VDOT. SUB - 2011 -00118 Stonefield -Final (Bill Fritz) • Parcels 1 and 2 will require future dedication to VDOT for road improvements to Route 29 and Hydraulic as shown on the approved road plan. Please indicate when the plats for these dedications will be made since they are identified to be done by others on this plat. SUB - 2011 -00120 Briarwood Phases 1A -2 and 1B -1 (Sarah Baldwin) • A sight distance easement is needed from Silk Wood Way to the right on Briarwood Dr. for a distance of 335 feet for a 30 mph design speed on Briarwood Dr. If you have any questions, please contact me. Sincerely, Joel DeNunzio, P.E. Staff Engineer VDOT Charlottesville Residency AUNT October 26, 2011 Sarah D. Baldwin Albemarle County Department of Community Development Dear Ms. Baldwin, Thank you for the opportunity to review the preliminary site plan for SDP201100070 — Westminster Canterbury of the Blue Ridge Apartments. JAUNT has the following advisory comments. 1. This area is in the urban fare zone for JAUNT, where we provide trips primarily for people with disabilities. Charlottesville Area Transit would be the main transit option for the general public. The closest current CAT stop is a short walk from the site at the Social Security building on Pantops Mountain Place. 2. The roadway layout appears to be sufficient to allow JAUNT to serve the facility. a. What is the vertical clearance where the new building bridges the road? b. What is the vertical clearance of the first and second floor underground parking? c. It was unclear from the preliminary plans where the accessible building entrance(s) will be. When that is clarified, JAUNT can evaluate whether safe loading and unloading zones exist. 3. Pedestrian /bicycle connections: Some 4' sidewalks are shown. Consider wider sidewalks and grass buffer strips where possible to encourage walking. Also, a 5' minimum width would be required for two wheelchairs to pass. Please contact me with any questions. Peter Ohlms, JAUNT Mobility Manager - peteroPrideiaunt.org - 296 -3184, ext. 120 104 Keystone Place, Charlottesville VA 22902 www.rideiaunt.org info() rideiaunt.org (434) 296 -3184 Nwo �'IRGII�P COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 November 2, 2011 John Hash 250 Pantops Mountain Road Charlottesville, VA 22902 RE: SDP 2011 -70 Preliminary Plan Westminster Canterbury of the Blue Ridge Apartments Dear Sir: The Site Review Committee has reviewed the development proposal referenced above. Preliminary comments for the following divisions of the Department of Community Development and other agencies, as applicable, are attached: Albemarle County Division of Zoning & Current Development (Engineer) - attached Albemarle County Division of Zoning & Current Development (Planner) - attached Albemarle County Division of Planning (E911) - no objection Albemarle County Division of Planning (Architectural Review Board) - attached Albemarle County Building Inspections -no objection Albemarle County Department of Fire Rescue- attached Albemarle County Service Authority- attached Virginia Department of Health- N/A Virginia Department of Transportation- N/A Jaunt- attached. Comments reflect information available at the time the development proposal was reviewed, and should not be considered final. However, the Site Review Committee has attempted to identify all issues that could affect approval of the proposed project. Please make the revisions that have been identified as necessary for preliminary approval by the Site Review Committee. If you choose not to make the requested revisions, please submit in writing justification for not incorporating such revisions. Submit eight (8) full size copies and one (1) 11" x 17" copy to the Department of Community Development including responses to each of the attached comments of the Site Review Committee by November 14, 2011. Failure to submit this information by this date will result in suspension of the review schedule. Review will resume when revisions are submitted along with a reinstatement fee of $65. Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, Sarah D. Baldwin Senior Planner .11,111W 1"00. Review Comments Project Name: Westminister of the Blue Ridge Apartments - Preliminary Plat Date Completed: Tuesday, October 18, 2011 Reviewer: Max Greene Department/Division /Agency: Engineering Reviews Critical slopes waiver request is required. [18 -4.2] Retaining walls will have safety railing shown on the plan and details for construction. Parking structure details are required [18- 32.7.2A] rteview Status: Pending