Loading...
HomeMy WebLinkAboutSDP201100050 Plan - Approved 2011-08-11a a r- 0 a 00 N 0 3 F z U 1 N M �t 0 d' L_ CHARLOTTESVILLE HIGH SCHOOL i p I . A mit �ig MINO I R SI 11 TE PLAN AMENDM I E : N COUNTY OF ALBEMARLE, VIRGINIA NO SCALE OWNER: 0 0 . • N ow�� CHARLOTTESVILLE OO .01 MELBOURNE ROAD GROUP CHARLOTTESVILLE, VA 22901-31915 TIMMONS TELEPHONE; 919 2ND STREET, S.E. CHARLOTTESVILLE, VA 22902 CONTACT: SAM SAUNDERS, P.E. • Re +-;sewed ar: A ,;rovad bV tl:e Cammun ,`v D vs--fr) pment department Sheet Index Sheet Number Sheet Title C0.0 COVER C1.0 LEGEND AND NOTES C2.0 EXISTING CONDITIONS AND DEMOLITION PLAN C3.0 LAYOUT, GRADING, AND DRAINAGE PLAN C4.0 EROSION AND SEDIMENT CONTROL PLAN '9' 1 i� • • • rIT-11 a 7/11/11 DRAWN BY C. KOTARSKI DESIGNED BY C. KOTARSKI CHECKED BY S. SAUNDERS SCALE NA E cm v vi c C a W N -- V 1— NJ a U. w ® � UJ N M W H 4 U'� � ®e } C'� W U M +�+ OC � 'i li w QU -tD 4i 0 NLn Q1 M Uj _ d' Acme LU 0 z c� 4 ,W z C n w E LU w -cU tU Gdl 4) Q e� o Nf '9' 1 i� • • • rIT-11 a 7/11/11 DRAWN BY C. KOTARSKI DESIGNED BY C. KOTARSKI CHECKED BY S. SAUNDERS SCALE NA a FO a 0 0. L U N >n i7 d- o- L SITE DATA: ENGINEER: TIMMONS GROUP 919 2ND ST. S.E. CHARLOTTESVILLE, VA 22902 TELEPHONE: 434 -295 -5624 CONTACT: SAM SAUNDERS, P.E. SAM. SAU NDERS@TIMMONS.COM TAX MAP PARCEL: TM 061 PARCEL 193 LIMITS OF DISTURBANCE: 2.68 ACRES ZONING: R -10 RESIDENTIAL MAGISTERIAL DISTRICT: RIO SOURCE OF BOUNDARY AND TOPOGRAPHY: TIMMONS GROUP 1001 BOULDERS PARKWAY, SUITE 300 RICHMOND, VA 23225 PAUL HUBER, L.S. 804 - 200 -6500 WETLAND IMPACTS: NONE DRAINAGE DISTRICT: MEADOW CREEK WATERSHED GENERAL NOTES 1. ALL MATERIALS AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH CURRENT VIRGINIA DEPARTMENT OF TRANSPORTATION'S SPECIFICATIONS AND STANDARDS. 2. PRIOR TO ANY CONSTRUCTION, THE CONTRACTOR SHALL CONSULT THE ENGINEER AND VERIFY THE APPROVAL OF THE PLANS BY ALL FEDERAL, STATE AND LOCAL AGENCIES. 3. THE CONTRACTOR SHALL VERIFY THE ELEVATIONS OF ALL POINTS OF CONNECTION OR PROPOSED WORK TO EXISTING CURBS, SANITARY LINES, WATERLINES, ETC, PRIOR TO CONSTRUCTION. 4. UPON DISCOVERY OF SOILS THAT ARE UNSUITABLE FOR FOUNDATIONS OR SUBGRADES, THE CONTRACTOR SHALL IMMEDIATELY CONTACT THE OWNER. THESE AREAS SHALL BE EXCAVATED BELOW PLAN GRADE AS DIRECTED BY THE OWNER, BACKFILLED WITH SUITABLE MATERIAL AND COMPACTED IN ACCORDANCE WITH CURRENT VDOT SPECIFICATIONS. 5, ALL CONCRETE FOR CURB AND GOAL POST FOUNDATIONS SHALL BE A3-AE (AIR ENTRAINED 3,000 PSI), UNLESS OTHERWISE NOTED. 6. DESIGN CHANGES, SPECIFIED MATERIALS CHANGES AND /OR FIELD CHANGES FROM THE APPROVED PLANS NEED TO BE RESUBMITTED TO OWNER AND ENGINEER PRIOR TO PROCEEDING WITH THE WORK. 7. CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF ALL UNDERGROUND UTILITIES SHOWN ON PLANS IN AREAS OF CONSTRUCTION PRIOR TO STARTING WORK. CONTACT ENGINEER IMMEDIATELY IF LOCATION OR ELEVATION IS DIFFERENT FROM THAT SHOWN ON PLAN. IF THERE APPEARS TO BE A CONFLICT, AND /OR UPON DISCOVERY OF ANY UTILITY NOT SHOWN ON THIS PLAN, CALL MISS UTILITY OF CENTRAL VIRGINIA AT 1- 800 - 552 -7001. 8. CERTIFICATION AND SOURCE OF MATERIALS ARE TO BE SUBMITTED TO THE OWNER FOR ALL MATERIALS AND BE IN ACCORDANCE WITH THE ROAD AND BRIDGE SPECIFICATIONS, AND ROAD AND BRIDGE STANDARDS, EXCEPT AS NOTED ON THE PLANS. MISCELLANEOUS • CONTRACTOR TO CONTACT THE CITY OF CHARLOTTESVILLE TO HAVE THE SCHOOL OWNED UNDERGROUND UTILITIES LOCATED PRIOR TO START OF CONSTRUCTION. 72 HOUR NOTICE REQUIRED. • ALL EXCESS MATERIALS TO BE REMOVED /DISPOSED OF OFF SITE, BY THE CONTRACTOR AT AN APPROVED AND ACCEPTABLE AREA. •� w M '1 f"� A- A T- SOR3PVC 5 PC C+OUPLN G OmrI tIE�i12401im L 'W QrY ill sm PIPE 0 % 4 !%-O• p 4 r � ]7• 4. MR-35 PVC 8 % 4 a°-0" 1' (1) 3K3 4. SOR -35 PVC 8 x 6 8'-O" 8°-0" (1) 4X4 4• SDR-33 PVC :.a 1b"- W r- (1) 4x4 I r 9CR- -38 PVC 12x$ 12°-4• a`-0` (2) 4*4 1 C SOR 33 PVC F- j ai Br tIE�i12401im L 'W QrY ill sm PIPE 0 % 4 !%-O• 4 °-O' (1) 3x3 4. MR-35 PVC 8 % 4 a°-0" 4°-C (1) 3K3 4. SOR -35 PVC 8 x 6 8'-O" 8°-0" (1) 4X4 4• SDR-33 PVC 10 K e 1b"- W r- (1) 4x4 I r 9CR- -38 PVC 12x$ 12°-4• a`-0` (2) 4*4 1 C SOR 33 PVC 6"xl2" CONCRETE CURB WITH FENCE fi POST SLEEVES 8' ON fitterld Itef�'° CENTER Od6@'8M1S E i" .I w ww.i1116ft "AD"k PLAN VIEW R ?alll�hee. 349 3458 �.tY'�' RATTLY Oi N�11 con CUT. GRATE a. FM OF PLAN VIEW UJIV'A" MIIiT �! !O in" OLNV'O' "aws IF; www-1111tara em ?Tali Am (86V 34"M 2" BITUMINOUS CONCRETE SURFACE COURSE - SM -9.OA 6" TYPE 21 B AGGREGATE BASE COURSE COMPACTED SUBGRADE DENOTES LIGHT DUTY ASPHALT PAVEMENT ON PLANS LIGHT DUTY ASPHALT PAVEMENT SECTION NTS caiowwca Am *am a rum oum mw TowMam mum e mm PROW FUNM *am aw mum } $ •} . "t; •� ;,a 4l r5D.} � A alb �. plum Mum GUM IF44MM TO eox t; tt a L m vwma SECTIONS VIEWS OF FIL.TERRA IN FLUME APPLICATIONS SEE BEWW FOR OCrA.S NOT SHOWN /�yAC.A SC�I'-�0- PLAy��ryt�xlk�B1�W M Tw Sm IW MERRA (BY L'O aftA 1" 4" MN / 8' WIG s ClPJ1R���..f..T�FH1�IfWAT cmr- GN-� OEPRE ED ; OUrrER ATw MW OPONG TRANs' m TO TMRGAT PROiDCRON DEMM L1lJM AT THROAT Ot+P" , -,f t 4 00 N" ROANE - LFAME IN MM tKM SlTE IS + DD+NE1. BARS O 12" O.C. BY 11t iCASf g• ; 18 ACTNIauF.�l BE BENT As aF�sARar eV � ... uti ". o PRIOR TO WSTALLATION OF FIELD POURED GUTTER *' PRWJW Box WALL SECTION VIEW FM.AT A OHER NE MUST BJMTM TNAN Mm FLaDYIM. m FILTERRA THROAT OPENING (DROP NO OR OTHER) ORNN NG AYALANJE IN TF FLE FORkW. 02-23-05 loft W-3 l (ll �► PI LTlION►.' 1►T OPI a No AM 4Vrr= Olk nA= ORTMIL us Alm s AIM! DETAIL PROVIDED BY GENERAL SPORTS VENUE AND UPDATED TO SHOW SITE SPECIFIC CONDITIONS 4" BASE STONE (WASHED #57) SYNTHETIC TURF TURF SURFACE 2.25" SYNTHETIC TURF SURFACE 2" FINISHED STONE (#8) 2" FINISHED -, —1.0% SLOPE 1.0% SLOPE —.� STONE (#8) .. .. .. .......... ..... COMPACTED SUBGRADE SLOPED FOR DRAINAGE 5.75' VARIES MIN. 2.55' - .-1.0% SLOPE 01.0% SLOPE, 4" BASE STONE (WASHED #57) SUBGRADE SLOPED (MIRAFI 140N) FOR DRAINAGE 12" HDPE PERFORATED COLLECTOR • � AT DITCHLINE ELEV. 409.56 1.0% SLOPE --..- •..- - -1.5% SLOPE NOTES: 1. CONTRACTOR SHALL USE WASHED STOINE FOR SYNTHETIC TURF FIELD 2. THE 2.25" SYNTHETIC TURF SURFACE, 2" FINISHED STONE ( #8), 4" BASE STONE(WASHED #57), AND THE COMPACTED SUBGRADE ARE TO BE SLOPED AT A 1.00% SLOPE FROM THE CENTERLINE OF THE FIELD AND FROM THE EDGE OF THE TRACK TO THE PROPOSED TRENCH ALONNG THE SIDELINES. 3. THE BOTTOM OF THE TRENCH ALONG THE SIDELINES IS TO REMAIN FLAT AT A CONSISTENT ELEVATION (ELEV. = 403.10). 4" BASE STONE (WASHED #57) COMPACTED SUBGRADE SLOPED FOR DRAINAGE 5.75' VARIES MIN. 2.55' DETAIL PROVIDED BY GENERAL SPORTS VENUE AND UPDATED TO SHOW SITE SPECIFIC CONDITIONS 2.25" SYNTHETIC TURF SYSTEM 2" FINISHED STONE (#8) TREATED WOOD NAILER -- 12" HDPE PERFORATED COLLECTOR ' - BASE STONE (WASHED #57) GEOTEXTILE (MIRAFI 140N) ELEVATION = 403.10 10' 6 "x12" CONCRETE CURB WITH FENCE POST SLEEVES 8' ON CENTER - ASPHALT 6 "X6" PRESSURE TREATED WOOD NAILER 12" HDPE PERFORATED COLLECTOR 6 "x12" CONCRETE CURB WITH FENCE POST SLEEVES 8' ON CENTER !- ASPHALT DETAIL PROVIDED BY GENERAL SPORTS VENUE AND UPDATED TO SHOW SITE SPECIFIC CONDITIONS 2.25" SYNTHETIC TURF SYSTEM 2" FINISHED STONE ( #8) CURB WITH FENCE POST SLEEVES 8' ON CENTER 6 "x6" PRESSURE TREATED WOOD NAILER -- 12" HDPE PERFORATED COLLECTOR - BASE STONE (WASHED #57) GEOTEXTILE (MIRAFI 140N) ELEVATION = 403.10 ELEVATION VARIES ALONG OUTSIDE OF CONCRETE CURB. SEE PLAN FOR SPOT ELEVATIONS. ASPHALT E 01 U) a, E C N w ev E F- j ai Br >:; t!f t- T U® z NJ ;4 0 m a; O Ai V 0 u tJ to U 4 °..� 10.-1 U v' a .,.s "r a o -m �I ' 3- 0 ® y� I— ci C U) Lu Oh N' E•# > W > w fir+ o s t� O � 0) w E CL O a Q -r w N h N d DATE Q > 4) M 7/11/11 ® U) DRAWN BY C. KOTARSKI DESIGNED BY C. KOTARSKI CHECKED BY S. SAUNDERS SCALE i NA 0 FT • • Z) o co w Z �Q 0 6 0 uj c 0 �o UJI v c U) D C U U C- C N -F. O � ry o o a C (f) a ui Z c� '*a H "- ID o L1_I a 0 L 0 a CD C va U T C uj a G L.LI If as cn uj D o i co zo 2 a O M Q � L o .F+ a ao a� � ca O O x U L E v o r- w 0 v � .a U •ate-+ C O 0 W VJ JOB NO. ° ca •c 31552 C O O cl SHEET NO. 0- Cls 0 N a L C r -'Q Vii• I WA \ I IT OF DISTURBANCE (2.88 ACRES) \. 1 P -- `� FEWIC GA aft rt qcW Ii £ t 5b I n I I 1 ( TE 410 I AL r� p � I I GOALI � � POST PA IN INX I � I 1 I + � I t P ~ \ I � rJ r I I I 410 I Qi 410 j t t a E ANLAW q LIMITS OF T - - - - -� \ .4 r i "I .Alh1V I INA. FE SF 0 i wQ W o r' v EROSION AND SEDIMENT CONTROL NARRATIVE MANAGEMENT STRATEGIES C. KOTARSKI C)E _ 1. PROVIDE SEDIMENT TRAPPING MEASURES AS A FIRST STEP IN GRADING. V CHECKED BY PROJECT DESCRIPTION 2. ISOLATE TRENCHING FOR UTILITIES AND DRAINAGE FROM DOWNSTREAM ES -1: U. THIS PROJECT INCLUDES THE INSTALLATION OF AN ARTIFICIAL TURF FIELD. THE SYSTEM INCLUDES A CONVEYANCES IN ORDER TO MINIMIZE PERIMETER CONTROLS. t ¢ STONE BASE AND STORM DRAIN SYSTEM THAT WILL TIE INTO THE EXISTING SYSTEM. 3. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED L d ; UNTIL THEY ARE NO LONGER REQUIRED TO COMPLY WITH THE CONTRACT o u en ADJACENT PROPERTY DOCUMENTS OR STATE LAW. O THE PROPERTY IS BORDERED BY THE NORTH BY A PARKING LOT, PRACTICE FIELD, AND WOODS. ON s La i 9 PERMANENT STABILIZATION LV s 0, PERMANENT TURF SHALL BE INSTALLED ON DISTURBED AREAS WITHIN SEVEN ES -2: `, Z 0 O S = EXISTING SITE CONDITIONS -'Q Vii• I WA \ I IT OF DISTURBANCE (2.88 ACRES) \. 1 P -- `� FEWIC GA aft rt qcW Ii £ t 5b I n I I 1 ( TE 410 I AL r� p � I I GOALI � � POST PA IN INX I � I 1 I + � I t P ~ \ I � rJ r I I I 410 I Qi 410 j t t a E ANLAW q LIMITS OF T - - - - -� \ .4 r i "I .Alh1V I INA. FE SF 0 DATE wQ W o 7/11/11 v EROSION AND SEDIMENT CONTROL NARRATIVE MANAGEMENT STRATEGIES C. KOTARSKI C)E _ 1. PROVIDE SEDIMENT TRAPPING MEASURES AS A FIRST STEP IN GRADING. V CHECKED BY PROJECT DESCRIPTION 2. ISOLATE TRENCHING FOR UTILITIES AND DRAINAGE FROM DOWNSTREAM ES -1: U. THIS PROJECT INCLUDES THE INSTALLATION OF AN ARTIFICIAL TURF FIELD. THE SYSTEM INCLUDES A CONVEYANCES IN ORDER TO MINIMIZE PERIMETER CONTROLS. WOU. ¢ STONE BASE AND STORM DRAIN SYSTEM THAT WILL TIE INTO THE EXISTING SYSTEM. 3. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED L d 4 u Lu o UNTIL THEY ARE NO LONGER REQUIRED TO COMPLY WITH THE CONTRACT o u en ADJACENT PROPERTY DOCUMENTS OR STATE LAW. O THE PROPERTY IS BORDERED BY THE NORTH BY A PARKING LOT, PRACTICE FIELD, AND WOODS. ON s La N THE EAST IS BORDERED BY A BASEBALL FIELD, THE SOUTH BY A SCHOOL MAINTENANCE AREA, AND PERMANENT STABILIZATION LV 00 THE WEST BY MELBOURNE ROAD AND CHARLOTTESVILLE HIGH SCHOOL PERMANENT TURF SHALL BE INSTALLED ON DISTURBED AREAS WITHIN SEVEN ES -2: `, Z 0 O DAYS OF BEING BROUGHT TO FINAL GRADE. = EXISTING SITE CONDITIONS o THE SITE IS THE LOCATION OF CHARLOTTESVILLE HIGH SCHOOL'S STADIUM, SEQUENCE OF CONSTRUCTION d- OFF -SITE AREAS ui ES -3; Z NO OFF -SITE AREAS WILL BE DISTURBED DURING THIS PROJECT. 1. CONTRACTOR SHALL INSTALL ALL EROSION AND SEDIMENT CONTROL a MEASURES. 47 CRITICAL EROSION AREAS 2. LIMITS OF LAYDOWN AREA SHALL BE DEFINED BY CONTRACTOR. ES -4: o THERE ARE NO CRITICAL EROSION AREAS ON SITE. 3. THE TURF INSTALLATION CAN BEGIN. THE FIRST PART OF CONSTRUCTION z 0 INCLUDES INSTALLING THE POROUS GEOTEXTILE LINER, AND THE 4" #57 a EROSION AND SEDIMENT CONTROL MEASURES STONE. AT THE END OF EACH DAY THE UNDERLAYMENT SHALL BE ES -5: 0 UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT ROLLED UP OVER THE EDGES OF THE STONE TO SERVE AS PROTECTION w CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM FROM SEDIMENT WASHING INTO THE STONE BED. THE PERIMETER STONE ! STANDARDS AND SPECIFICATIONS OF THE CURRENT ADDITION OF THE VIRGINIA EROSION AND TRENCH AND UNDERDRAIN SHOULD ONLY BE INSTALLED AFTER THE SEDIMENT CONTROL HANDBOOK. THE MINIMUM STANDARDS OF THE VESCH SHALL BE ADHERED TO MAJORITY OF THE FIELD HAS BEEN GRADED AND STONED. THIS WILL o UNLESS OTHERWISE WAIVED OR APPROVED BY A VARIANCE BY LOCAL AUTHORITIES HAVING PREVENT SEDIMENT FROM CLOGGING THE SOIL IN THE TRENCH AND JURISDICTION. LIMITING INFILTRATION. 4. EACH PHASE SHALL OF CONSTRUCTION SHALL BE AS FOLLOWS: ES -6: N STRUCTURAL PRACTICES: A. REMOVE THE EXISTING IRRIGATION SYSTEM THAT SERVES THE 0 1. TEMPORARY CONSTRUCTION ENTRANCE - 3.02 A TEMPORARY CONSTRUCTION ENTRANCE SHALL FIELD. 3 O BE PROVIDED AT THE LOCATION INDICATED ON THE PLANS. IT IS IMPERATIVE THAT THIS B. CLEAR AND GRUB FIELD AREA, REMOVE EXCESS SOIL MATERIAL, MEASURE BE MAINTAINED THROUGHOUT CONSTRUCTION. ITS PURPOSE IS TO REDUCE THE FINISH GRADE SUBGRADE. ES -7: AMOUNT OF MUD TRANSPORTED ONTO PAVED PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF. C. INSTALL POROUS LINER AND 4" OF 457 STONE FOR FIELD AREA. 2. STORM DRAIN INLET PROTECTION - 3.07 STONE FILTERS SHALL BE PLACED AT THE INLET OF ALL D. EXCAVATE UNDERDRAIN TRENCHES AROUND PERIMETER OF FIELD DRAINAGE STRUCTURES AS INDICATED ON PLANS. ITS PURPOSE IS TO PREVENT SEDIMENT FROM AND INSTALL POROUS LINER. rn ENTERING THE STORM DRAINAGE SYSTEM PRIOR TO PERMANENT STABILIZATION. E. INSTALL 12" PERFORATED COLLECTOR PIPE AND CONNECT TO THE ES -8: v 3. DUST CONTROL - 3.39 DUST CONTROL IS 70 BE USED THROUGHOUT THE SITE IN AREAS SUBJECT EXISTING INLETS AS SHOWN ON THE PLANS. 04 TO SURFACE AND AIR MOVEMENT. F. INSTALL #57 STONE WITHIN THE UNDERDRAIN TRENCHES. 'r' VEGETATIVE PRACTICES: G. ONCE A -F HAS BEEN COMPLETED, ADD 2" #8 STONE CAP AND ES -9: "' 1. TOPSOIL (TEMPORARY STOCKPILE) - 3.30 TOPSOIL SHALL BE STRIPPED FROM AREAS TO BE GRADED INSTALL TURF SYSTEM (WITH INFILL) FOR ENTIRE PROJECT AREA. 0 AND STOCKPILED FOR LATER SPREADING. STOCKPILE LOCATIONS SHALL BE LOCATED ONSITE AND 6. THE CONTRACTOR IS TO REMOVE ALL EROSION AND SEDIMENT CONTROL SHALL BE STABILIZED WITH TEMPORARY SILT FENCE AND VEGETATION. DEVICES ONCE ALL AREAS ARE STABILIZED. L GENERAL EROSION AND SEDIMENT CONTROL NOTES: UNLESS OTHERWISE INDICATED, CONSTRUCT AND MAINTAIN ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE LATEST EDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625 -02 -00 EROSION AND SEDIMENT CONTROL REGULATIONS. THE CONTROLLING EROSION AND SEDIMENT CONTROL AUTHORITY WILL MAKE A CONTINUING REVIEW AND EVALUATION OF THE METHODS AND EFFECTIVENESS OF THE EROSION CONTROL PLAN. PLACE ALL EROSION AND SEDIMENT CONTROL MEASURES PRIOR TO OR AS THE FIRST STEP IN CLEARING, GRADING, OR LAND DISTURBANCE. MAINTAIN A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN ON THE SITE AT ALL TIMES. PRIOR TO COMMENCING LAND- DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFFSITE BORROW OR WASTE AREA), SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE ARCHITECT/ENGINEER AND THE CONTROLLING EROSION AND SEDIMENT CONTROL AUTHORITY FOR REVIEW AND ACCEPTANCE. PROVIDE ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE RESPONSIBLE LAND DISTURBER. (MODIFIED NOTE) ALL DISTURBED AREAS SHALL DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND- DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT. DURING DEWATERING OPERATIONS, PUMP WATER INTO AN APPROVED FILTERING DEVICE. INSPECT ALL EROSION CONTROL MEASURES DAILY AND AFTER EACH RUNOFF- PRODUCING RAINFALL EVENT. MAKE ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES IMMEDIATELY. If it I; I k .? 1: