Loading...
HomeMy WebLinkAboutSDP201100040 Letter of Revision Letter of Revision 1 2011-11-01(C�GF A U ® tr+7 k7 �'IRGINZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 November 1, 2011 Andrew McGinty 610 Preston Ave. Charlottesville, VA 22903 RE: LOR# 1 for SDP - 2011 -40 Arden Place Minor Amendment Tax Map/Parcel Number 06100 -00 -00 -12400 Dear Mr. McGinty, This letter is to approve as a Letter of Revision the removal of part of the path near the stormwater management facility in the northern end of the development. The portion of the 8 foot asphalt path that extends north of the check dam will be removed and the area reseeded. South of the check dam the path will be retained. No bridge will be constructed over the check dam. The original plan showed the path to be 10 feet wide and gravel. An 8 foot asphalt path was constructed. An 8 foot asphalt path is approved with this letter. The path north of the Carmike connection will be barricaded to prevent pedestrian access as shown on the approved plans. This is the I" Letter of Revision for this site. A total of three (3) Letters of Revision are allowed before all changes to the plan are required to be submitted in the form of a site plan amendment. Sincerely, William D. Fritz Chief of Current Development Attachments: Letter of Request From: Andy McGinty [mailto a dy @colewaydevelopment.com] '"001 Sent: Tuesday, October 11, 20113:14 PM To: Bill Fritz Subject: Arden Trail Bill - It has been brought to my attention that the section of the Arden Place trail north of the Carmike Cinema vehicular connection has been built according to the originally approved 2009 site plan, but fails to comply with the site plan as amended in April of 2010. The amended site plan calls for the trail to terminate at the Carmike connection, with only a 10' gravel storm water service path approved for construction north of Carmike connection. As constructed presently, an 8' asphalt path extends north of the Carmike connection towards the lagoon, as was specified in the 2009 site plan. To correct the deviation, I propose to remove all asphalt from the section of path north of the storm water pond using the check dam as a point of demarcation. I request that we be allowed to keep the 8' asphalt section of path south of the check dam in lieu of the 10' gravel path called for in the amended site plan - this is a betterment that will facilitate maintenance of the pond in the future. The storm water access road will be barricaded to prevent pedestrian access, and no bridge will be constructed over the check dam. I believe these adjustment will bring us into compliance with the amended site plan. Please let me know if you agree, and if a more formal submission is necessary to document this, or we can just allow this email to suffice. Our plan is to complete this work in the very near future, well before the schedule called for in the Phasing plan. It should be noted that nearly all of the path north of the Carmike was constructed over a RSWA easement, and that all of this land had already been cleared of large caliber trees when the waterline was installed. Only saplings and scrub brush were removed with its paving and the land was already rough graded for the trail. The Arden development's commitment to tree preservation has been real from the beginning, and the construction of this trail doesn't diminish that fact. Finally, this section of forest had become a fairly well worn path before Arden came along, as I expect it will continue to be in the future, with or without the asphalt. Indeed, the trail was routed to follow a path that already existed. That said, we will bring the project into compliance with the amended site plan, with your approval of my minor change requests stated above. Thanks, Andy Andy McGinty Coleway Development andy(a?colewavdevelopment.com (w) 434 - 295 -1542 (m) 434- 242 -7412 (f) 703 - 564 -3680 610 Preston Avenue, Charlottesville VA, 22903