HomeMy WebLinkAboutSDP201100038 Review Comments 2011-06-10on Al COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 229024596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Crozet Library ESC & SWM Plan [SDP201100038, WP0201100032] Plan preparer: John D. Reno Uohn.reno @PHRA.com] Owner or rep.: County of Albemarle c/o Finance Administration RM 149 Plan received date: 3 June 2011 Date of comments: 10 June 2011 Reviewer: John P. Diez — Engineering Technician Engineering has reviewed the final site plan associated with the Crozet Library received 3 June 2011. The plan can be approved once the following comments have been addressed: A. Final Site Plan (SDP201100038) 1. Please update the existing contours on Main Street on the existing conditions sheet. Please revise all necessary sheets to show the new existing contours. 2. Please provide date and source of the topographic information. All topography should be at least visually field verified by the designer within the last year. 3. A Letter of Intent is needed from the owner of TMP:56A2- 01 -15, TMP:56A2- 01 -14, and TMP:56A2- 01 -12. Grading easements must be recorded prior to final site plan approval. 4. VDOT approval must be obtained for any plan affecting public right -of -way. 5. Please show the existing contour lines of Main Street as dashed lines throughout the set of plans. 6. Please provide Albemarle County General Construction Notes. Please refer to the Design Standards Manual. , 7. Please provide islands at each end of the center area of the parking lot. The island may consist of grass, wood blocks, or a concrete curb. 8. It appears that some of the runoff from the south side of the parking lot will not be captured by the biofilter. Please provide either curb or a small ditch /swale to help capture and direct the runoff to the facility. B. Erosion and Sediment Control (WP0201100032) 1. Please provide County Erosion and Sediment Control Notes. Please refer to the Design Standards Manual. 2. Please update the project description and existing site conditions on the E &S narrative. Please remove anything relating to the construction of a building or library. 3. Please update the construction sequence and include the demolition. 4. Engineering recommends: a. In the initial phase, remove the silt fence on the north and south side of the site and replace them with diversion dikes directing the runoff to a sediment trap at the lowest point of the site on the west side of the property. This will allow the entire site's runoff, including the construction entrance, to be captured by the sediment trap. The silt fence on the west side of the property can remain. ron Engineering Review Comments Page 2 of 2 b. In phase 1, move the sediment trap to the area of the proposed Bio- retention pond. Reshape the sediment trap so it can be converted to the bio- retention pond once the site has been stabilized. (Engineering allows over sizing the sediment trap with a weir to allow runoff to sheet flow from the sediment trap down to the west.) Please include all proposed grading within the limits of disturbance for all phases. Please provide dust control (DC) in all E &S phases. Tree protection must be provided to all trees that are being saved. Please show the proposed contours for the sediment trap. C. Stormwater Management Plan (WPO201100032) 9. A completed copy of the standard stormwater maintenance agreement and fee for recordation for any stormwater management facility must be submitted prior to plan approval. 10. Please provide Albemarle County General Stormwater Management Notes. Please refer to the Design Standards Manual.