Loading...
HomeMy WebLinkAboutSDP201100005 Review Comments 2011-02-17Service Auth♦rity Searing ♦ Conserving TO: Summer Frederick FROM: Gary Whelan, Civil Engineer DATE: February 17, 2011 RE: Site Plan Technical Review for: SDP201100005 Om Belevdere Phase 1, Block 4A TM 62G -1 -4Q -141 The below checked items apply to this site. J 1. This site plan is within the Authority's jurisdictional area for: J A. Water and sewer B. Water only C. Water only to existing structure D. Limited service ✓ 2. A 12 inch water line is located on site. 3. Fire flow from, nearest public hydrant, located distant from this site plan, is Gpm + at 20 psi residual. J 4. An 8 inch sewer line is located on site. 5. An Industrial Waste Ordinance survey form must be completed. J 6. No improvements or obstructions shall be placed within existing or future easements. 7. and plans are currently under review. 8. and plans have been received and approved. 9. No plans are required. ✓ 10. Final water and sewer plans are required for our review and approval prior to granting tentative approval. 11. Final site plan may /may not be signed. 12. RWSA approval for water and /or sewer connections. 13. City of Charlottesville approval for sewer. ✓ Comments: Make sure that previously approved service connections that will not be used are properly abandoned. Move the meters to the back of the walks as previously shown. If the existing taps are 1 ", a double meter arrangement can be used for townhouses. Dedication of Phase 1, Block 3, 4A, 5A, 613 & 9A infrastructure is required prior to final site plan approval. 168 Spotnap Road - Charlottesville - VA 22911 - Tel (434) 977 -4511 - Fax (434) 979 -0698 www.serviceauthoriy.org