Loading...
HomeMy WebLinkAboutSDP201000005 Review Comments 2010-02-04wry, �q { Service Auth6rity TO: Elizabeth Marotta FROM: Gary Whelan, Civil Engineer DATE: February 4, 2010 RE: Site Plan Technical Review for: Stone Robinson Elementary School Baseball Field SDP201000005 TM 79- 20,23A The below checked items apply to this site. X 1. This site plan is within the Authority's jurisdictional area for: A. Water and sewer X B. Water only C. Water only to existing structure D. Limited service X 2. A 6 inch water line is located on site. 3. Fire flow from, nearest public hydrant, located distant from this site plan, is Gpm + at 20 psi residual. 4. An inch sewer line is located approximately distant. 5. An Industrial Waste Ordinance survey form must be completed. X 6. No improvements or obstructions shall be placed within existing or future easements. 7. and plans are currently under review. 8. and plans have been received and approved. X 9. No plans are required. 10. Final and plans are required for our review and approval prior to granting tentative approval. 11. Final site plan may /may not be signed. 12. RWSA approval for water and /or sewer connections. 13. City of Charlottesville approval for sewer. Comments: The site plan does not show or incorrectly shows: meter locations water line size waterline locations sewer line size sewer line locations expected wastewater flows easements expected water demands 168 Spotnap Road - Charlottesville - VA 22911 - Tel (434) 977 -4511 - Fax (434) 979 -0698 www.serviceauthoriy.org