Loading...
HomeMy WebLinkAboutSDP201500024 Review Comments 2016-02-29Short Review Comments Report for: SDP201500024 SubApplication Type: Albrecht Place - Final Final Site Development Plan Date Completed:06/02/2015 Reviewer:Ellie Ray Planning Review Status:Requested Changes Reviews Comments: Division: Date Completed:05/19/2015 Reviewer:Jay Schlothauer Inspections Review Status:Requested Changes Reviews Comments:Based on plans revised May 4, 2015. Due to the total number of parking spaces (177), there must be seven barrier-free parking spaces. Provide one more barrrier-free parking space, with associated access aisle and curb cut. Division: Date Completed:06/02/2015 Reviewer:Margaret Maliszewski ARB Review Status:Approved Reviews Comments:In the small portion of the site subject to ARB review, this plan appears to be the same plan that was previously approved for the ARB. Division: Date Completed:05/13/2015 Reviewer:Andrew Slack E911 Review Status:Approved Reviews Comments:Approved. Division: Date Completed:06/06/2015 Reviewer:Robbie Gilmer Fire Rescue Review Status:No Objection Reviews Comments:Based on plans dated 5/4/15 No comments or objections Division: Date Completed:06/04/2015 Reviewer:Alexander Morrison ACSA Review Status:Requested Changes Reviews Comments:The last ACSA utility comments on the plan were in November of 2013. The ACSA requests that 3 copies of the plan along with water and sewer data sheets be submitted to the ACSA to start a new review. Please submit them to the attention of Jeremy Lynn, PE. Division: Date Completed:06/03/2015 Reviewer:Shelly Plaster VDOT Review Status:No Objection Reviews Comments: Division: Date Completed:06/01/2015 Reviewer:Max Greene Engineering Review Status:See Recommendations Reviews Comments:Plan can be approved after the recordation of the new drainage easement for the SWM outlet pipe Division: Page:1of3 County of AlbemarlePrinted On:March 02, 2016 across the neighboring parcel. Date Completed:06/26/2015 Reviewer:Ellie Ray Planning Review Status:Requested Changes Reviews Comments: Division: Date Completed:06/17/2015 Reviewer:Jay Schlothauer Inspections Review Status:No Objection Reviews Comments:Based on plans revised June 11, 2015. No further comments or conditions. Division: Date Completed:06/24/2015 Reviewer:Alexander Morrison ACSA Review Status:No Objection Reviews Comments: Division: Date Completed:06/26/2015 Reviewer:Max Greene Engineering Review Status:See Recommendations Reviews Comments:Plan can be approved after the recordation of the new drainage easement for the SWM outlet pipe across the neighboring parcel. Division: Date Completed:06/26/2015 Reviewer:Ellie Ray Planning Review Status:Requested Changes Reviews Comments:1) The limits of disturbance in the area near the pipe are shown differently on the site plan and the waiver exhibit; please clarify which is accurate and revise whichever plan is incorrect. Make sure the square footage of disturbance provided in the waiver request letter is accurate as well, and provide a revised letter, if necessary. 2) The waiver request letter says the disturbed area will be revegetated, but neither the site plan or waiver exhibit show any proposed planting in that area; please revise both the site plan and waiver exhibit to show the proposed fence extending all the way to the property line along the buffer line (it looks like it ends just short now) and show some evergreen plantings in the disturbed area behind the fence. This needs to be added to address items (ii) and (iii) from section 21.7(c). 3) I will need the revised waiver exhibit (and request letter if the square footage of disturbance is different than your first letter) as soon as possible so I can try to get my staff report written by July 10th (the deadline for the August 5th BOS meeting). If timing is not an issue (it may not be given the easement plats still need to be submitted, reviewed and approved), the next available Board meetings are in early September. Division: Date Completed:08/03/2015 Reviewer:Ellie Ray Planning Review Status:See Recommendations Reviews Comments:Executive summary entered into Granicus. Division: Date Completed:09/02/2015 Reviewer:Ellie Ray Planning Review Status:Approved Reviews Comments:waiting on report approval. Went to BOS 9/2/15. Resolution uploaded. Division: Date Completed:02/10/2016 Reviewer:Ellie Ray Planning Review Status:See Recommendations Division: Page:2of3 County of AlbemarlePrinted On:March 02, 2016 Reviews Comments:Comment email in RMS. Minor remaining issues: signed conservation plan checklist on signature copies, and clarification of easement on TMP 61U-1-13. Date Completed:02/04/2016 Reviewer:Max Greene Engineering Review Status:No Objection Reviews Comments: Division: Date Completed:02/19/2016 Reviewer:Ellie Ray Planning Review Status:No Objection Reviews Comments: Division: Date Completed:02/29/2016 Reviewer:Ellie Ray Planning Review Status:Approved Reviews Comments: Division: Page:3of3 County of AlbemarlePrinted On:March 02, 2016