Loading...
HomeMy WebLinkAboutWPO201600010 Approval - County 2016-02-27John Anderson From: John Anderson Sent: Saturday, February 27, 2016 2:27 PM To: 'Kat Maybury' Cc: Kenny Thacker; Todd Shifflett; Glenn Brooks Subject: WP0201600010 Doyles River Crossing -ESCP Approval Ms. Maybury, Please accept this email as Notice of ESCP Approval, Project File Number WP0201600010/Doyles River Crossing. This ESCP Application supplements Floodplain Development Application - FDP201500008/Doyles River Crossing. Plan: Erosion and Sediment Control Plan / (document) includes 8.5" x 11" schematic to guide inspection/construction. Plan (Document)/Title: Doyles River Crossing, 4877 Browns Gap Turnpike, Crozet, VA 22932 Prepared by K. Maybury, 1318 N. Wakefield St., Arlington, VA 22207 February 14, 2016 Revision; Previous Version: November 9, 2015 As noted in email sent 15 -Feb (below), Albemarle County will hold Floodplain Development Permit (FDP201500008) Approval until Joint Permit is issued. An ESC bond is not required. If calculated, bond Amt. = $6851(0.5 x disturbed Area* x $5,000/Ac.-stabilization + 65 LF silt fence x $5/ LF). This is less than equivalent project (Amts.) neither calculated nor required of single-family home construction typical throughout the county. Project is a single-family access/driveway/culvert river crossing. It is not part of a subdivision, or larger plan of development. This project will not receive a VDEQ CGP but will receive a Multi -Agency Joint Permit authorizing work in waters of the U.S. Project Certification Statement signed by Kathleen Maybury, dated 14 -Feb 2016, is sufficient to guide/inform compliance. We appreciate your help and patience. Closer to the time of FDP Approval, please contact Todd Shifflett to arrange a pre - construction meeting. Digs, Inc/Charlottesville is slated to construct the crossing. Pre -construction Mtg. will be familiar to Digs —Todd's TEL: 434.296-5832 —x3072. This project represents significant activity within the 100 -yr floodplain of Doyles River, and as such will be inspected. Please let us know if you have any questions. Thanks, again, for your help and patience. Please retain this correspondence as OFFICIAL Notice of Erosion and Sediment Control Plan Approval. * 6,265 SF (±) ; Note: to process this bond Amt. requires county expense exceeding value of bond John E. Anderson, PE I Civil Engineer 11 Department of Community Development I County of Albemarle, Virginia 401 McIntire Road I Charlottesville, VA 22902 434.296.5832 ext. 3069 From: John Anderson Sent: Monday, February 15, 2016 10:09 AM To: 'Kat Maybury' <katmaybury@yahoo.com> Cc: Joe Calhoun <jbc_3@yahoo.com> Subject: RE: Revised ESC w Drawing & Certification Statement No, Joe needn't sign From: Kat Maybury [mailto:katmaybury@yahoo.com] Sent: Monday, February 15, 2016 9:42 AM To: John Anderson <janderson2@albemarle.org> Subject: Re: Revised ESC w Drawing & Certification Statement Argh - Yes on the two corrections. East and 5. I am a goof! Thanks for the corrections! I signed the certification. Do you mean Joe needs to sign too? From: John Anderson <landerson2(cD.albemarle.org> To: Kat Maybury <katmaybury(cD.yahoo.com> Sent: Monday, February 15, 2016 9:37 AM Subject: RE: Revised ESC w Drawing & Certification Statement Kat, This is excellent. ESC Plan revised/comments: Minor edits: 1. Seq. 3: "Restore the floodplain of the Doyles to its original condition on the east side by..." should this read west side? 2. Seq. 6: "Once half the bridge is constructed, move the sandbags to divert the flow through the installed set of 4 pairs of culverts" —should this read 5 culverts? Plan ESC Locations 1/file— Concise, clear, thank you Certification Statement —thank you With minor edits, this ESCP will be approved. Please sign certification —we need 2 copies of this plan w/Application +$150 fee. We must hold Floodplain Development Permit (FDP201500008) Approval until Joint permit is issued. Thank you From: Kat Maybury [mai Ito: katmaybu[y(a)yahoo.com] Sent: Monday, February 15, 2016 9:01 AM To: John Anderson <ianderson2(a)_albemarle.orq> Cc: Joe Calhoun <ibc 3(a).yahoo.com> Subject: Revised ESC w Drawing & Certification Statement Hi John - Attached is my revised Erosion & Sediment Control Plan including text describing the washout area and how we will do the plantings, along with the the map showing where the different activities would take place and the Certification Statement. Please let me know if this meets your requirements related to this. Thanks, Kat