HomeMy WebLinkAboutSDP201500057 Review Comments Initial Site Plan 2016-03-08COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
1601 Orange Road
Culpeper. Yrgtrda 22701
Charles A. Kilpatrick, P.E.
Commissioner
March 07, 2016
Mr. Christopher Perez
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Re: SDP -2015-00057 General Industrial Office Initial Site Plan
Dear Mr. Perez:
We have reviewed the General Industrial Office initial site plan, dated October 26, 2015, as resubmitted
by Meridian Planning Group, LLC, and we offer the following comments:
1. The anticipated average daily trips should be based on the current edition of the ITE Trip
Generation Manual.
2. The geometry of the proposed entrance on Coffey Drive (Route 882) needs to meet the design
vehicle standards. Based on the proposed warehouse use, trucks will be accessing the property.
"Entrance Design Details" can be found in Appendix F of the Road Design Manual.
3. A Land Use Permit will be required prior to the beginning of any work within the Route 882
right-of-way.
4. Sheet C-301: The `New Pavement Detail' is showing "New Paved Entrance Match Existing Rio
Road Pavement"; from the plans the new entrance ties in to Coffey Drive (Route 882).
If you need tional information concerning this project, please feel free to contact me.
ince r ly,
Joel D. DeNunzio, P.E.
Resident Engineer
VDOT - Charlottesville