Loading...
HomeMy WebLinkAboutSDP201000067 Review Comments 2010-09-10J ,p Alt �'IRGIt�1P County of Albemarle Department of Community Development Memorandum To: Gerald Gatobu, Senior Planner From: John P. Diez, Engineering Review Division: Current Development Date: September 10, 2010 Subject: SDP20100067 Pantops Fire Station - Preliminary Site Plan The preliminary site plan for Pantops Fire Station, submitted on August 25, 2010, has been reviewed. Current Development Engineering has the following comments: Preliminary Site Plan Comments 1. Please provide source and date of topography and survey. [18- 32.5.6a] 2. Please provide a Simple Methods spreadsheet to illustrate removal rate requirements for the proposed site. 3. It appears that the area for the proposed SWM pond will suffice for water quantity. However, engineering is concerned about having anything but dirt and vegetation in this area due to having public drainage facility beneath the pond. Engineering recommends one or two biofilters to capture and treat the runoff for water quality and then to be discharged into the pond for water quantity. 4. Please provide a demolition plan showing the removal of the existing one -story framed building. 5. All disturbance of critical slope require a critical slopes waiver. Please submit a request for a critical slopes waiver for review. [18- 4.2.5b] Final Site Plan Comments (For information purposes only) 1. Professional seal must be signed and dated. [18- 32.6.1] 2. A Water Protection Ordinance application and fee must be submitted, along with an Erosion and Sediment Control and Stormwater Management plan. 3. In order to prevent ponding on the northwest side of the structure, a grate inlet should be installed at the center, along with moving the roof drain pipe to the center of the depressed area so as all runoff is captured and directed to the pond. 4. Please provide parking surface per VDOT guidelines. [18- 4.12.15a] 5. A dumpster pad must be provided. You may submit a request to waive this requirement per section 18- 4.12.13f. The requirements of this subsection may be modified or waived in an individual case if the zoning administrator, in consultation with the county engineer, finds that the public health. safety or welfare would be equally or better served by the modification or waiver. On 6. Please provide curb and gutter along travelways and in parking areas. A request for waiver may be submitted for review. [18- 4.12.15g] 7. Guardrail must be provided for any steep slopes or drop -offs along parking areas. 8. VDOT approval must be obtained prior to final site plan approval. 9. Please provide General Construction notes. Application #: SDP201000067 Short Review Comrnts Project Name:lPantops Fire Station - Prelim. Preliminary — Non - residential Date Completed: 09/07/2010 Reviewer: Andrew Slack E911 Review Status: Requested Changes Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: THIS SITE WILL NEED A NEW PRIVATE ROAD NAME. PLEASE CONTACT THIS OFFICE WITH % LIST OF POTENTIAL ROAD NAMES THAT HAVE BEEN DISCUSSED WITH THE OTHER PROPERTY OWNERS. 09/13/2010 Gerald Gatobu CommDev- Current Development Requested Changes 09/03/2010 Gerald Gatobu CommDev- Current Development No Objection 30ILS REPORT 09/03/2010 James Barber Fire Rescue No Objection Aust comply with the Virginia Statewide Fire Prevention Code. Final approval is subject to field nspection and verification. 09/15/2010 Jay Schlothauer Inspections Requested Changes 3ased on plans dated August 18, 2010. rearrange the barrier -free parking space so that it is van - accessible (min. 8' wide parking space, with nin. 8' wide adjacent striped access aisle). 09/01/2010 Margaret Maliszewski ARB No Objection 4t the location and height proposed in the preliminary plan, this building is not expected to be visible 'rom the Entrance Corridors. Consequently, ARB review is not required. 08/31/2010 Wayne Cilimberg Planning Requested Changes ✓ariation - Based on disturbance shown on plan a variation appears to be acceptable, but want to see analysis for critical slopes waiver that appears to be necessary to verify extent of disturbance to (lopes and wooded area. Also would like to see confirmation from Thomas Jefferson Foundation, Inc hat the site plan application is consistent with the terms of the MOU as per proffer #9 of ZMA. ✓WC Page: 1.00 County of Albemarle Printed On: Wednesday, September 15, 2010