HomeMy WebLinkAboutSDP201000062 Approval - County 2011-03-16COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
March 16, 2011
Michael E. Derdeyn, Esq.
530 East Main Street
Charlottesville, VA 22902
RE: SP201000043 Brown Collision Center
Tax Map 61, Parcel 120E
Dear Mr. Derdeyn:
On March 9, 2011, the Albemarle County Board of Supervisors took action on the above referenced
special use permit to permit an auto body shop in a Highway Commercial District on the above
referenced parcel in the Rio District. No residential units are proposed. This special use permit was
approved based on the following conditions:
There shall be no storage of parts, materials or equipment except within an enclosed building;
No vehicle awaiting repair shall be located on any portion of the property so as to be visible from
any public road or any residential property, and shall be limited to locations designated on the
approved site plan; and
The site plan (SDP2010 -62, Sheet 1 of 1, dated 8/2/10, and prepared by Daggett & Grigg
Architects) shall be amended with a Letter of Revision to update the parking space labels and to
show all of the previously approved /required landscaping on the plan, and to show the relocated
area where vehicles awaiting repair are kept from public view.
Please be advised that although the Albemarle County Board of Supervisors took action on the
project noted above, no uses on the property as approved above may lawfully begin until all
applicable approvals have been received and conditions have been met. This includes:
• compliance with conditions of the SPECIAL USE PERMIT;
• approval of and compliance with a SITE PLAN amendment; and
• approval of a ZONING COMPLIANCE CLEARANCE.
In the event that the use, structure or activity for which this special use permit is issued is not commenced
within twenty -four (24) months from the date of Board approval, it shall be deemed abandoned and the
permit terminated. The term "commenced" means "construction of any structure necessary to the use of
the permit."
If you have questions or comments regarding the above -noted action, please do not hesitate to contact
Ron Higgins at 296 -5832.
Redevelopment- Emphasizes re -use of sites. Incorporates varying densities and gradually allows
for an overall increase in density in the Development Areas to meet the goals of the
Comprehensive Plan.
This is not applicable.
More detailed comments may be provided at a later date.
Zonina
The following comments related to zoning matters have been provided by Ron Higgins:
• This will require a minor site plan amendment in order to relocate the area where vehicles
awaiting repair are kept from public view.
• The use of "body shop" is not currently listed in the HC district. However, the Planning
Commission recommended approval of a ZTA adding this use to HC by special use permit.
This will go to the BOS for public hearing and action in early 2011.
Enaineerina and Water Resources
The following comments related to engineering and water resources have been provided by Glenn
Brooks:
• This is an old site that does not meet the current ordinance requirements. There is plenty of
room for improvement in stormwater management, circulation, access, etc.
Entrance Corridor
The following comments related to the Entrance Corridor Guidelines have been provided by
Margaret Maliszewski:
• The current SP plan shows two areas of existing trees to remain. There is additional
landscaping on site that was required by the ARB with previous site plans, that is also "to
remain ". It is confusing to show only some of the existing landscaping on the plan.
The SP plan correctly identifies the parking spaces behind the building as the parking area
for vehicles awaiting repair. This is a change from the previously approved minor
amendment (SPD- 2010 -62).
It is recommended that the site plan be amended with a Letter of Revision to update the
parking space labels and to show all of the previously approved /required landscaping on
the plan. Depending on the timing of the SP, this could be handled as a condition of
approval, or a revised plan could be submitted for review at this time.
Fire /Rescue
This must comply with the Virginia Statewide Fire Prevention Code. Final approval is subject to
field inspection and verification.
VDOT
Comments from VDOT are attached.
SP Conditions
The following types of conditions will be needed:
1) There shall be no storage of parts, materials or equipment except within an enclosed
building.
3
2) No vehicle awaiting repair shall be located on any portion of such property so as to be
visible from any public road or any residential property, and shall be limited to locations
designed on the approved site plan.
3) Nothing herein shall be construed to limit the authority of the governing body in the review
of any special use permit, including, but not limited to, the regulation of hours of operation,
location of door and /or windows and the like.
Resubmittal or Public Hearing
Within 30 days of the date of this letter, please do one of the following:
(1) Resubmit in response to these comments on a resubmittal date as published in the
project review schedule (the full resubmittal schedule may be found at
www.albemarle.org in the "forms" section at the Community Development page), OR
(2) Request a public hearing be set with the Planning Commission based on the
information provided with your original submittal (a date will be set in accordance with
the Planning Commission's published schedule as mutually agreed to by you and the
County), OR
(3) Request indefinite deferral and state your justification for requesting the deferral.
(Indefinite deferral means that you intend to resubmit/request a public hearing be set
with the Planning Commission after the 30 day period.)
If we have not received a response from you within 30 days, we will contact you again. At that
time, you will be given 10 days to do one of the following: a) request withdrawal of your
application, b) request deferral of your application to a specific Planning Commission date as
mutually agreed to with staff, or c) request indefinite deferral and state your justification for
requesting the deferral. If none of these actions is taken, staff will schedule your application for a
public hearing based on the information provided with your original submittal.
Unless you fail to respond within the time periods specified above, a public hearing with the
Planning Commission will not be advertised until you advise us that the project is ready to proceed
to a public hearing. At that time, a legal advertisement will be run in the newspaper and a staff
report will be prepared to go to the Planning Commission.
Please be advised that, once a public hearing has been advertised, only one deferral prior to the
Planning Commission's public hearing will be allowed during the life of the application. The only
exception to this rule will be extraordinary circumstances, such as a major change in the project
proposal by the applicant or more issues identified by staff that has not previously been brought to
the applicant's attention. As always, an applicant may request deferral at the Planning
Commission meeting.
Please feel free to contact me if you wish to meet or need additional information.
Sincerely,
Claudette Grant
Senior Planner, Community Development
C: S & B Realty Venture, L.L.C.
Brown Charlottesville Motors, Inc.
Rev. 6 -1 -10
2
Sincerely,
Wayn Cilimberg
Director of Planning
CC: S & B Realty Venture LLC C/O Brown Toyota
960 Hilton Heights Road
Charlottesville, VA 22901