Loading...
HomeMy WebLinkAboutARB201500067 Correspondence 2015-06-16 Now ARB Comment Response 6/16/15 CVS at Rio and Route 29 1. Show how the visibility of rooftop equipment will be eliminated. Provide site sections and details on the proposed method of screening the rooftop equipment. Response: This topic was discussed with staff on May 28th. At that meeting we determined that site sections were not a requirement given we are locating the equipment behind parapet walls, we are providing screening of all units on the building roof and we are providing evergreen screening to block the view of the building roof from the Rio Road Entrance Corridor. Rooftop equipment is shown drawn in on Sheet A-4.1, Exterior Elevations, and is specified as Roof Top Equipment Beyond, Typ. Site Renderings from various angles will also be shown at the ARB meeting. 2. Add the standard mechanical equipment note to the plan: "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." Response: Note has been added to Sheet A-4.1 under the Note Section. 3. Provide a copy of the VDOT easement document. With the next ARB submittal, provide information from VDOT outlining the types and sizes of landscaping allowed in the easement. Response: Per review of the VDOT easement language and conversations with VDOT representatives and County staff, we have determined that low impact trees are appropriate in the VDOT easement along 29N. Several other easements on site, such as water lines and sanitary sewer lines, impact this area and do not allow trees. Overhead power lines, meter boxes, phone poles and guy wires also impede the 29N property frontage, allowing for extremely limited tree locations. The engineer has identified a small area along the 29N frontage that will allow room for an ornamental tree in addition to the landscape plan as submitted. 4. Shift the new water line to provide planting area for trees along the Rt. 29 frontage. Response: The waterline must remain in its current location to allow for connection with the meter box. VDOT has confirmed that the telephone pole and guy wires will remain onsite, further preventing a shifting of the proposed waterline and easement. 5. Revise the plan to clearly label all utility lines and the width of each easement. Indicate on the plan the height of the overhead electric line. Response: Plan has been labelled. We can also provide a specific utility exhibit if that would be helpful for staff and Board members. 6. Provide landscaping consistent with the EC guidelines to the extent allowed by the VDOT and utility easements. Response: Please see responses to comments number 3, 4, 7, 9, 10, 11 and 12. 7. Provide the Rt. 29 frontage trees at 3W caliper at planting. *41.10 w Response: Tree size has been increased as shown on Sheets CP-101 and CP-102. 8. Provide the landscape plan at a standard scale of 1" = 20'. Response: Landscape plan is now shown at the standard scale. 9. Increase the size of the trees along the entrance drive on the west side of the site to 21/2" caliper at planting. Response: Tree size has been increased as shown on Sheets CP-101 and CP-102. 10. Provide all perimeter shrubs at a minimum planting height of at least 24", including shrubs adjacent to Rio Road and Route 29. Response: Plan has been updated to meet this requirement. 11. Significantly enhance the shrub planting along the Rt. 29 frontage to better compensate for the lack of shade and ornamental trees. Response: Shrub plantings have been enhanced along the Rt. 29 frontage by adding a variety of shrubs (13 different varieties are proposed), proposing larger shrubs, and creating a plan with groupings and layers of shrubs. 12. Add the standard plant health note to the plan: "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant." Response: Note included on Sheet CP-101, Note #4. 13. Adjust the quantities of plants and/or species so that the number of proposed plants for any one species does not exceed 25% of the total proposed for that plant type. Response: Quantities and species of plants have been adjusted. 14. Indicate on the site plan the material and color proposed for the retaining walls. Provide a manufacturer's cut sheet and color sample. Provide specific information showing that the proposed wall type and material allow for the planting that is shown. Response: Note has been added to Sheet A-4.1 stating: Retaining walls shall match building materials and colors. Color samples for the building were provided on the material board. Cut sheets will be provided when they are available. Larson Design Group° October 14, 2015 Margaret Maliszewski County of Albemarle Department of Community Development 401 McIntire Road,North Wing Charlottesville,VA 22902-4596 RE: CVS#10746 Charlottesville,VA • ARB201500067 CVS-Rio& 29N—Response Letter Dear Margaret, In regard to the letter dated August 26, 2015,we submit the following responses: 1) Revise the awnings from vinyl to canvas or metal. Provide a color sample and revise the elevation drawings accordingly. a) Vinyl awning has been changed to canvas awning, as indicated on the elevations and exterior finish schedule "E10".Also,please see attached sample of canvas material. 2) Coordinate the door paint colors identified on the color and black&white elevations. a) Hollow metal doors and frames are to be painted Benjamin Moore—HC-S0, Georgian Brick to match "E3", Quik-Brick Richfield Blend. 3) Provide information on the type of window glass proposed. Include the standard glass note on the architectural drawings: "Visible light transmittance(VLT) shall not drop below 40%. Visible light reflectance(VLR) shall not exceed 30%." a) Window glazing isl"insulated glass with Solarban 60 Low-E.Please see highlighted sections of attached cutsheet. Glass note has also been added to sheet A4. 4) Provide in the architectural drawings information detailing the screening of rooftop equipment. Provide a roof plan showing the equipment and screen locations. Indicate equipment and screen heights. Include notes identifying the various design options proposed for the screens (color,trim, and panel design, vertical or canted system). a) See attached roof plan Sheet A2 for RTU and screenwall locations. Refer to 8/A2 for screenwall detail and notes. The tallest units (RTU 1 and 2) are 5'above the roof line, including the curb, at the high side of the roof The screen wall height will vary from 5' above the roof on the high side, to 8'-4"above the roof on the low side to create one level screenwall. 5) Add the standard mechanical equipment note to both the architectural and site plans. "Visibility of all YOUR VISION. MADE REAL. Architects Engineers Surveyors An employee owned company Williamsport 1000 Commerce Park Drive, Suite 201, Williamsport, PA 17701 Tel (570)323-6603 Toil Free (877)323-6603 Fax (570) 323-9902 is Please eursiae, the enwrormen, www.larsondesigngroup.com *ore Nue Page 2 ARB201500067 CVS — Rio & 29N mechanical equipment from the Entrance Corridor shall be eliminated." a) Note has been added to the site plan sheet CS-101, note 8; also added as a general note to Sheet A2. 6) Revise the architectural elevations to eliminate the perimeter lighting of the building. Provide a complete lighting plan for review. a) Removing the perimeter lighting does not impact the architectural elevations. Please see attached new photometric plan prepared by Hubbell. 7) Indicate on the plan the height of the overhead power line. a) It is our understanding that the OHE will be relocated slightly as part of VDOTs work and it is our(Kimley-Horn)assumption that it will be replaced to the required height standard. 8) Revise the landscape plan to add ornamental trees in available areas along the Rt. 29 frontage. a) A crepe Myrtle was added to the only available space along Route 29 free from easements. 9) Revise the landscape plan to clearly show all plant labels. a) The landscape plan was reworked to 20 scale as previously requested for easier viewing. 10) Revise the landscape plan to increase the planting height of the IN2 shrubs to 24"minimum. a) The perimeter shrubs were increased to 24"as requested along these 2 frontages (not along the northern boundary where the IN2s are). 11) Clarify on the site plan the material and color(s)proposed for the retaining walls.Provide a manufacturer's cut sheet and color sample for review. Provide specific information showing that the proposed wall type and material allow for the planting that is shown. a) Retaining wall is to match the CVS building, and to be Quik-Brick,Richfield Blend. The plantings shown in this area are called out to have a 15"-18"spread. There is currently 3.5'between the terraced retaining wall, where the plantings will be, which should be sufficient space. 12) Note that a separate application will be required for all wall and freestanding signs.Avoid overscaled wall signs. a) There is currently a note on sheet A4 that states that signage is under a separate permit, and to refer to sign package from sign vendor. Please provide: 1. Two full sets of revised drawings addressing each of those conditions. Include updated ARB revision dates on each drawing. 2. A memo including detailed responses indicating how each condition has been satisfied. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in drawings with"clouding"or by other means will facilitate review and approval. 3. The attached"Revised Application Submittal"form. This form must be returned with your revisions to ensure proper tracking and distribution. A Page 3 ARB201500067 CVS — Rio & 29N If you have any questions,please feel free to contact me at LDG's Williamsport office at 570-323-6603 or via email to RGehr @larsondesigngroup.com. Sincerely, LARSON DESIGN GROUP v obert J. Ge , MA,NCARB Vice President of Brand Architecture and Facilities Engineering cc: File 6558-034 RJG/cmb Attachments: Copy of original letter Sample of canvas awning material Sheet A2,A4 Photometric Plan Cutsheet for Solarban 60 window glazing i Margaret Maliszewski From: Paul Sprouse <psprouse @rebkee.com> Sent: Tuesday, December 15, 2015 4:05 PM To: Margaret Maliszewski Cc: Timothy Henrie; adavies @williamsmullen.com; Julie Younes; Paul Sprouse Subject: FW: comments on CVS resubmittal [IWOV-IWOVRIC.FID1403201] Attachments: ARB reponse letter.pdf; 10746_A2-Layoutl.pdf; 10746_A4-Layoutl.pdf Margaret: I just wanted to make sure we are all on the same page with regard to the RTU screens for the future CVS at Rio and Rt 29. We were originally going to go with the 'Envisor'Screens provided by City Scapes; however, their service and installation has been terrible and we want to make sure we provide you guys with a great finished product for this store. We are proposing that the screening system is constructed on the roof by the General Contractor per the attached plans that were sent over. Please review and let us know if you have any questions or comments. The screens will be painted to blend in with the building and will look good. Thanks, f� 7' ,Q ' Paul Sprouse I The Rebkee Company `�!" g � 15871 City View Drive Suite 300 I Midlothian, VA 1 23113 D: 804-419-0747 I M: 804-387-4449 I F: 804-419-0759 79'9'1,1-71.44 psprouse(c�rebkee.com I www.rebkee.com From:Timothy Henrie [mailto:THenrie @larsondesigngroup.com] 61-1/ / � . Sent: Monday, December 14, 2015 10:40 AM To: Paul Sprouse <psprouse @rebkee.com>;Julie Younes<jrlilley @larsondesigngroup.com> Cc: 'adavies @williamsmullen.com' <adavies @williamsmullen.com> / /� X.-C Subject: RE: comments on CVS resubmittal [IWOV-IWOVRIC.FID1403201] r‘ (f,do eA4,4;46 Paul, I just wanted to follow up on the RTU screening we just spoke about. We sent the attached plans to the ARB for the RTU screens per the attached review letter, comment#4. F These plans showed the screens to be built as we discussed instead of the Envisor screens. ri p, Please let us know if we still need to change them. _ ! Timothy Henrie Project Manager- Brand Architecture t. sort €)e^sirgn Group 0 : (570651- M 1 " M: (570)) 560-3081 (,(//l1/1A From:Timothy Henrie Sent: Monday, December 07, 2015 5:04 PM To: 'Paul Sprouse';Julie Younes Cc: adavies @williamsmullen.com Subject: RE: comments on CVS resubmittal [IWOV-IWOVRIC.FID1403201] Paul, The canvas awning material would be Glen Raven Firesist Crimson Red (82017-0000). We verified this with the supplier and can send a sample if needed. 1 For the RTU screening, are they requiring us to use the Envisor screens? CVS has a standard detail to building screen walls which is what the plans show. Timothy Henrie Project Manager- Brand Architecture Larson Design Group 0: (570) 651-1559 M: (570) 560-3081 From: Paul Sprouse [mailto:psprouse @rebkee.com] Sent:Thursday, November 12, 2015 3:14 PM To:Timothy Henrie;Julie Younes Cc: adavies @williamsmullen.com Subject: FW: comments on CVS resubmittal [IWOV-IWOVRIC.FID1403201] Tim/Julie: See attached comment letter from ARB that just came in. #1) Please clarify the canvas material 2) as for the envisor system: Trim design will be 3" Flat and the panel design will be "wide rib" Paul Sprouse The Rebkee Company 15871 City View Drive Suite 300 I Midlothian, VA 1 23113 D: 804-419-0747 I M: 804-387-4449 I F: 804-419-0759 psprouserebkee.com I www.rebkee.com From: Davies,Ashley [mailto:adavies @williamsmullen.com] Sent:Thursday, November 12, 2015 9:19 AM To: Paul Sprouse<psprouse @rebkee.com>; Ryan.Perkins @kimley-horn.com Subject: FW: comments on CVS resubmittal [IWOV-IWOVRIC.FID1403201] Here are a few loose ends we need to wrap up for ARB. Ryan, If you haven't already submitted, we should go ahead and address the shrub comment. I think it is best to get this turned around as soon as we can to get ARB off the list. Call me if you have questions. Thanks, Ashley From: Margaret Maliszewski [mailto:MMaliszewski@albemarle.org] Sent: Wednesday, November 11, 2015 6:50 PM To: Davies, Ashley Subject: comments on CVS resubmittal Ashley, I've attached a copy of my comments on the most recent CVS resubmittal. If you have questions,just let me know. Margaret Margaret M. Maliszewski, Principal Planner Albemarle County Department of Community Development 401 McIntire Road,Charlottesville,VA 22902 434-296-5832 x3276 2