HomeMy WebLinkAboutSDP201500009 Letter of Revision 2 2016-03-10COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 2%-5832 Fax (434) 9724176
March 10, 2016
Daniel Hines
28 Blackwell Park Lane, Suite 201
Warrenton, VA 20186
RE: I -OR# 2for SDP 2015- 09 5th Street Station -Phase II
Dear Rob:
This letter is to approve as a Letter of Revision to the above site plan to show
adjustments as shown on correspondence dated February 12, 2016 which is attached.
This is the 2nd Letter of Revision for this site. A total of three (3) Letters of Revision are
allowed before all changes to the plan are required to be submitted in the form of a site
plan amendment.
Sincerely,
Sara . Baldwin
Senior Planner
Attachments: Letter of Revision for Fifth Street Station Phase 11 dated 2112116
Plans entitled Letter of Revision Phase II dated 2/20116, last revised
2/12/16
Tm
28 Blackwell Paris Lane, Suite 201
BOfiLER Warrenton, 4 24,.86
PRUNE 54D.349.45QO
E N G I N E E R I N G
February 12, 2016
Via Federal Express
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
(434) 296-5832
Attn: Glenn Brooks
Re: SDP -2015-009
Overall Phase Il — Letter of Revision
51 Street Station
Albemarle County, VA
BE #V122001
Dear Mr. Brooks:
Bohler Engineering is pleased to submit on behalf of, SJ Collins Enterprises, a Letter of Revision for
Phase II at the 5'' Street Station project in Albemarle County, Virginia.
The following revisions have been made to the approved Overall Phase II Final Site Plan, dated 2/20115,
last revised 1/29116.
Revised building footprint, grading, and utilities for Building 1200
• Revised dumpster location for Building 1200
• Shifted the loading dock wall for Building 2000
• Minor revision to the roof drain locations for Buildings 200, 1200, and 2000
Should you have any questions regarding this project or require additional information, please do not
hesitate to contact me at (540) 349-4500.
Sincerely,
Bohler Engineering
92�42
aniel R. Hines, P.E.
DR,Wls
H:1121V1220011AdministrativelLetters1160212 Overall Phase I1 Letter of Revision II (Timberwood Grill & Petsmart).doc
CIVILAND CONSULTING ENGINEERS • PROJECT MANAGERS * SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS
WWW.BOHLERENGINEERING.COM