Loading...
HomeMy WebLinkAboutSDP201500009 Letter of Revision 2 2016-03-10COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 2%-5832 Fax (434) 9724176 March 10, 2016 Daniel Hines 28 Blackwell Park Lane, Suite 201 Warrenton, VA 20186 RE: I -OR# 2for SDP 2015- 09 5th Street Station -Phase II Dear Rob: This letter is to approve as a Letter of Revision to the above site plan to show adjustments as shown on correspondence dated February 12, 2016 which is attached. This is the 2nd Letter of Revision for this site. A total of three (3) Letters of Revision are allowed before all changes to the plan are required to be submitted in the form of a site plan amendment. Sincerely, Sara . Baldwin Senior Planner Attachments: Letter of Revision for Fifth Street Station Phase 11 dated 2112116 Plans entitled Letter of Revision Phase II dated 2/20116, last revised 2/12/16 Tm 28 Blackwell Paris Lane, Suite 201 BOfiLER Warrenton, 4 24,.86 PRUNE 54D.349.45QO E N G I N E E R I N G February 12, 2016 Via Federal Express Albemarle County 401 McIntire Road Charlottesville, VA 22902 (434) 296-5832 Attn: Glenn Brooks Re: SDP -2015-009 Overall Phase Il — Letter of Revision 51 Street Station Albemarle County, VA BE #V122001 Dear Mr. Brooks: Bohler Engineering is pleased to submit on behalf of, SJ Collins Enterprises, a Letter of Revision for Phase II at the 5'' Street Station project in Albemarle County, Virginia. The following revisions have been made to the approved Overall Phase II Final Site Plan, dated 2/20115, last revised 1/29116. Revised building footprint, grading, and utilities for Building 1200 • Revised dumpster location for Building 1200 • Shifted the loading dock wall for Building 2000 • Minor revision to the roof drain locations for Buildings 200, 1200, and 2000 Should you have any questions regarding this project or require additional information, please do not hesitate to contact me at (540) 349-4500. Sincerely, Bohler Engineering 92�42 aniel R. Hines, P.E. DR,Wls H:1121V1220011AdministrativelLetters1160212 Overall Phase I1 Letter of Revision II (Timberwood Grill & Petsmart).doc CIVILAND CONSULTING ENGINEERS • PROJECT MANAGERS * SURVEYORS • ENVIRONMENTAL CONSULTANTS • LANDSCAPE ARCHITECTS WWW.BOHLERENGINEERING.COM