Loading...
HomeMy WebLinkAboutSDP201000085 Review Comments 2010-11-09,%WWI pF ALg� NOW U �GfZ LT7 r'IRGINZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 November 9, 2010 Randy Hooker P.O. Boa 50067 Richmond, VA 23250 RE: SDP 2010 — 85 Baugh Auto Body II - Minor Dear Mr. Hooker, I have reviewed the site plan referenced above. The plan may be approved with after the following items have been addressed: 1. Approval from the Architectural Review Board. (It is my understanding that it is scheduled for review on 12/6/10.) Any changes made by the Architectural Review Board will need to be shown on the site plan. 2. The durpster- is proposed to be located in an area that is currently grass. The grass area is also noted as proposed vehicle storage area. The only new pavement area indicated is adjacent to the building where the new 12' wide overhead door is shown. No new pavement limits are indicated in the proposed vehicle storage area or new dumpster area. Please indicate that the new limits of paving in the proposed vehicle storage area. 3. The dumpster must be located on a dumpster pad meeting the requirements of 4.12.19 the Zoning Ordinance. I have attached the language of that section to this letter. If you have any questions about any of these comments please contact me. Sincerely, William D. Fritz, A1CP Chief of Current Development Email: THOOKERac EDAENGR.COM Cm Cm 4.12.19 MINIMUM DESIGN REQUIREMENTS AND IMPROVEMENTS FOR DUMPSTER PADS The following design requirements and minimum improvements shall be satisfied for all vehicle access aisles: a. Materials. Dumpster pads shall be concrete. b. Design. The pad shall extend beyond the front of each dumpster so that the front wheels of a truck servicing the dumpster will rest on the concrete, but in no case shall the length of a concrete pad be less than eight (8) feet beyond the front of the dumpster. The site shall be designed so that stormwater does not run through, and drains away from, areas where dumpsters are located in order to minimize the potential for contaminating stormwater runoff due to contact with solid waste. Application #: SDP201000085 .,]Short Review Comr._.., nts Project Name:lBaugh Auto Body II - Minor Minor Amendment Date Completed: 01/06/2011 Reviewer: Bill Fritz CommDev- Current Development Review Status: Approved Reviews Comments: Date Completed: Reviewer: Review Status: Reviews Comments: Ready to sign as soon as ARB approval is received. Need 4 copies for signing. 11/09/2010 Max Greene CommDev- Current Development Requested Changes please show dumpster pad detail on plan. plan does not appear to show additional impervious area, so No SWM plan will be required at this ime. 'Ian does not show soil disturbance over 10,000 square feet, so No E &SC plan is required at this ime. Page: 1.00 County of Albemarle Printed On: Wednesday, January 12, 2011