July 20, 2010
Mr. Glenn Brooks
Department of Engineering and Development
401 McIntire Rd.
Charlottesville, VA 22902
Subject: Site Review Meeting Comments July 22"0, 2010 site review meeting
Dear Mr. Brooks:
Below are VDOT's comments on the Site Plans for the July 22°0, 2010 Site Review Committee
Meeting:
SDP - 2010 -00051 Avemore IV Townhouses Final (Gerald Gatobu)
.• No comments.
SUB- 2010 -00081 Old Trail Block 4 Lots 2 -11 -Final (Megan Yani0os)
This plat is missing a variable width clear zone easement which is to be located one foot
behind the proposed sidewalk along lots 7, 8 and 9.
+ There are missing sight distance easement along lots 5, 7 and 9 that need to be shown on the
plat.
Please request the applicants provide a written description of revisions with re- submissions. If you
have any questions or comments, please contact me prior to sharing these comments with the
applicants.
Sincerely,
Joel DeNunzio, P.E.
Staff Engineer
VDOT Charlottesville Residency
434 - 293 -0011
WE KEEP VIRGINIA MOVING
'*AW
Alhemarie County
Service Authority
ng 6semnq
TO: Gerald Gatobu
FROM: Gary Whelan, Civil Engineer
DATE: July 20, 2010
RE: Site Plan Technical Review for:
Avemore Phase IV Townhouses -Final
SDP201000051
TM 7813-3 -1 C
The below checked items apply to this site.
J 1. This site plan is within the Authority's jurisdictional area for:
J A. Water and sewer
B. Water only
C. Water only to existing structure
D. Limited service
✓ 2. An 8 inch water line is located on site.
3. Fire flow from, nearest public hydrant, located distant from this site plan, is
Gpm + at 20 psi residual.
J 4. An 8 inch sewer line is located on site.
5. An Industrial Waste Ordinance survey form must be completed.
✓ 6. No improvements or obstructions shall be placed within existing or future
easements.
7. and plans are currently under review.
8. and plans have been received and approved.
9. No plans are required.
J 10. Final water and sewer plans are required for our review and approval prior to
granting tentative approval.
11. Final site plan may /may not be signed.
12. RWSA approval for water and /or sewer connections.
13. City of Charlottesville approval for sewer.
✓ Comments: Three sets of water and sewer plans are to be delivered directly to the
ACSA for review and approval. Phase Illb water dedication needs to be complete
prior to final approval.
The site plan does not show or incorrectly shows:
meter locations water line size
waterline locations sewer line size
sewer line locations expected wastewater flows
easements expected water demands