HomeMy WebLinkAboutSDP201000051 Review Comments 2010-07-20�OF A Z A� �'rRGIN�P COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 229024596 Phone(434)296 -5832 Fax(434)972 -4126 Project: Avemore Phase N Final Before Preliminary Site Plan [SDP- 2010 - 00051] Plan preparer: Mr. David Jensen, PE; W & W Associates Owner or rep.: Meridan Land Holdings, LLC Plan received date: 28 June 2010 Date of comments: 20 July 2010 Reviewer: Phil Custer The final- before - preliminary site plan, submitted 28 June 2010, has been received and reviewed by Engineering. A review of the WPO plan will be transmitted in a separate document. Engineering review provides the following comments on the final site plan: A. Site Plan Review 1. The Zoning Department has determined that the plan is consistent with the approved application plan. 2. The site plan cannot be approved until the WPO plan is approved. The review of the WPO plan will be provided in a separate comment letter. 3. In order to subdivide the townhouse lots in the future, the applicant must request a private street from the agent at the time the final subdivision plat application. [14 -233, 14 -234] The current subdivision ordinance requires the private road to be constructed to VDOT standards or "an alternative standard deemed adequate by the agent, upon recommendation of the county engineer ". [14- 412.B] The plan does not appear to meet any VDOT standard. Through a detailed discussion with the Chief of Current Development, it has been determined that Avemore Pond Road will be reviewed to the travelway standards of the Zoning Ordinance, 18 -4.12. Please make the following corrections to satisfy engineering review with regard to the travelway /roadway within the site: a. The applicant must build the Wilton Farm Connection Road to the Property Line. The horizontal and vertical alignments of the connector road must work with the already constructed roadway from Wilton Farm. [18- 32.7.2, 18- 32.7.2.5] b. Please provide a new estimate for the ADT on Avemore Pond Road under the assumption that the connection to Wilton Farm is worked out. The pavement section for Avemore Pond Road must be updated based on this new ADT. [14- 412.B, 18- 4.12.15.a] c. Perpendicular parking spaces must have a l Oft width when a travelway of 20ft is provided. [ 18 -4.12] d. All streets within the development areas require curbing, sidewalks, and 6ft planting strips. Since the application plan was approved without planting strips for this phase, planting strips will not be required. However, sidewalks must be provided or a waiver of this design standard must be approved by the Planning Commission. [14- 410.H, 14 -422, 18- 32.7.2.8] e. Please provide an autoturn exhibit showing the movement of a fire engine through Avemore Pond Road. [14- 412.B, 18- 32.5.6.s] f. The dedication of the access easement to the back of curb is not practical for long term maintenance of the road /travelway. On the Village Green side, please extend the easement to at least one foot behind the curb. On the outer edges, please provide a "6ft 1*AW 14000, Albemarle County Community Development Engineering Review Comments Page 2 of 2 sidewalk and maintenance easement" for the 5ft sidewalk that is necessitated by comment 34 or move the easement line to l ft behind the curb. [ 14- 412.13] g. Please provide no parking signs along the Village Green side of Avemore Pond. [18- 32.5.6.s] 4. The county engineer must approve any drainage system (proposed or existing) that exceeds open channel flow. The request has been delivered to the county engineer. [Design Manual] 5. In the storm drain profiles, please show all of the sanitary sewer lateral crossings. 6. Private storm drainage easements are needed over all pipes outside of the road easement. 7. Driveways must be no steeper than 5 %. [18- 4.12.15.c] 8. All slopes steeper than 3:1 must have a low maintenance, non - grassed groundcover specified. Examples of acceptable groundcovers can be found in Table 3.37C of the VESCH.